Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC C M SUB DIVISION CBE 027 KOTHAGIRI H COIMBATORE 18 TAMIL NADU | ₹1.1 Cr | 1 | Accepted-AOC lowest rate |
| 2 | 2₹1.1 Cr+₹48,766 (0.45%)Rejected-Finance | ₹1.1 Cr+₹48,766 (0.45%) | 2 | Rejected-Finance L2 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
10 May 2023, 3:00 pmClosed
PROJECT DIRECTOR
DRDA THE NILGIRIS
Renewal of Road from Km 3.0 of Catherin Falls Road to Moonroad - Kesalada Road KM 0/0-2/0 H/O Jackanarai
2023_RDTN_306840_1
NILGIRIS MGSMT KOTAGIRI
Open Tender
Civil Works - Roads
Item Rate
90 days
KOTAGIRI
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹0
₹1.1 L
DRDA THE NILGIRIS
11 Jul 2023
26 Apr 2023
10 May 2023
26 Apr 2023
10 May 2023
26 Apr 2023
29 Apr 2023
Amount
Renewal BT to Km-3/0 of Catherin Falls road to Moonroad-Kesalada road Km 0/0 - 2/0 H/O-Jackanarai (R-63)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Tack coat over WMM surface(treated with primer) using 3Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous Macadam 50 MM thick. Providing and laying BITUMINOUS macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finish
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading,premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and fill.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads ass per IRC :35 the finished to be level, uniform and free from streaks and etc complete as per MORT and H specification no.803
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
ROAD SIDE DRAIN
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Cement concrete 1:4:8 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Cement concrete 1:2:4 using 20mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 30cm, thick, compacting etc., complete complying with standard specification and as directed.
Provision for Sign board
Provision for Road Marker/ Road stud with lens Reflector
Provision for HM Stone
Provision for KM Stone
Provision for Name boards cum Citizen Board
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M PARAMESWARAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .