Work Contract for repair and maintenance work at Substore office room and store room in 110/22 KV Uthamapalayam Sub Station in Theni EDC
2023_EB_280615_1
088
Open Tender
Electrical Works
Item Rate
45 days
Theni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.7 L
Yes
25 Jan 2023
9 Jan 2023
25 Jan 2023
9 Jan 2023
24 Jan 2023
9 Jan 2023
Dismantling the Pressed tiles and Weathering course in the open terrace area,including cost of all Labour, lead, lift, etc., complete
Dismantling Damaged RCC Sunshades ,including cost of all Labour, lead, lift, etc., complete
PCC 1: 4 :8 by using 40 mm HBG jelly for Flooring Concrete, excluding cost of centering charges & steel reinforcement including cost of all materials, lead, lift, labour, curing, etc., complete.
Supplying, erecting Steel Centering for Roof slabs, beams, Lintels, Sunshades,Staircase waist slab, Landing slab, etc. including cost of all materials, leads, lifts, labour etc., complete.
RCC in 1:1 1/2:3 using 12 to 20 mm HBG jelly excluding cost of centering charges & steel reinforcement including cost of all materials, lead, lift, labour, curing, etc., complete.
Supplying, fabricating and placing in position of TMT rods for reinforcement for RCC works including cutting, bending, placing in position and tieing, as per standard specification including cost of steel, binding wire, etc. complete.
Plastering with cement mortar 1:5 12 mm thick for brick wall surface for outside and inside for all floors at all levels, including cost of all materials, lead, lift, labour, T&Ps, curing, etc., complete.
Wearthering course made up of Concrete broken brick jelly 20mm size in pure slaked lime over R.C.C. roof slab, (the proportion being 32:12.5) for required depth of 80mm for giving required slope and thickness to roof as required, well beaten with wooden beaters, and terrace flooring with one course of pressed tiles 20cm x 20cm x 20mm using cement mortar (1:3) mixed with crude oil 10 percent by weight of cement and pointed with same oiled mortar including cost of all materials, labour, lead, lift, etc. complete.
White washing two coats for Ceiling with White cement,including thorough scrapping, clean removal of dirt, etc. including cost of all materials, labour, lead, lift, labours, scaffolding, brush, etc., complete.
Supplying, aligning and fixing of 110 mm PVC Rain Water downfall pipe (4 kg/ Sq.cm) with necessary specials including fixing to wall with necessary clamps and screws, with necessary scaffolding, including cost of all materials, labour, T&Ps, lead, lift, etc.complete.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_333443.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .