| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge | 57.6 | Cum | 300 ₹17,280 | 310 ₹17,856 | 292 ₹16,819.2 Lowest |
| 2.00 | Providing and laying cement concrete 1:5:10(1 cement:5 sand:10 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinths including entire carragie of material upto all leads and lifts. | 17.1 | Cum | 4,400 ₹75,240 Lowest | 4,650 ₹79,515 | 5,000 ₹85,500 |
| 3.00 | Providing mild steel /tor steel reinforcment for r.c.c. work including bending ,binding and placing in position complete up to floor level .tor steel R.C.C. Tor steel | 3,891 | Kg | 82 ₹3,19,062 Lowest | 95 ₹3,69,645 | 88 ₹3,42,408 |
| 4.00 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in: a)Vertical Surface | 315.6 | Sqm | 395 ₹1,24,662 Lowest | 430 ₹1,35,708 | 530 ₹1,67,268 |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcemen 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) Item 5.2.2 HPSR 2020 | 12.5 | Cum | 7,000 ₹87,500 Lowest | 8,150 ₹1,01,875 | 8,500 ₹1,06,250 |
| 6.00 | Providing and laying cement concrete 1:3:6(1 cement:3 sand:6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinths including entire carragie of material upto all leads and lifts. | 53.22 | Cum | 5,200 ₹2,76,744 Lowest | 5,750 ₹3,06,015 | 5,530 ₹2,94,306.6 |
| 7.00 | Disposal of Excavated earth by Mechanical Transport including all leads and lift HPSR schedule 2009 | 92.16 | Cum | 180 ₹16,588.8 Lowest | 390 ₹35,942.4 | 350 ₹32,256 |
Tender Value
₹9.0 L
EMD Value
₹22,600
Closing Date
1 Oct 2025, 4:00 pmClosed
Executive Officer
Municipal Council Parwanoo
Construction of RCC box culvert at Sirmour Chowk ward no 2 sector-1 MC Parwanoo
2025_UDDHP_115402_1
MCPARWANOO/0925
Open Tender
Civil Works
Item Rate
30 days
Parwanoo
Please refer detailed tender notice
3 documents required · 3 mandatory
₹1,000
Executive Officer
₹22,600
4 Oct 2025
22 Sept 2025
3 Oct 2025
22 Sept 2025
1 Oct 2025
22 Sept 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge
Providing and laying cement concrete 1:5:10(1 cement:5 sand:10 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinths including entire carragie of material upto all leads and lifts.
Providing mild steel /tor steel reinforcment for r.c.c. work including bending ,binding and placing in position complete up to floor level .tor steel R.C.C. Tor steel
Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in: a)Vertical Surface
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcemen 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) Item 5.2.2 HPSR 2020
Providing and laying cement concrete 1:3:6(1 cement:3 sand:6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinths including entire carragie of material upto all leads and lifts.
Disposal of Excavated earth by Mechanical Transport including all leads and lift HPSR schedule 2009
Sanjay Kumar Garg (BID ID -564182)
S R Associate (BID ID -562034)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .