| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 CrAccepted-AOC | ₹2.5 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.6 Cr+₹6.5 L (2.56%)Rejected-AOC 0 272 273 1 | ₹2.6 Cr+₹6.5 L (2.56%) | 2 | Rejected-AOC L2 |
| 3 | 3₹2.6 Cr+₹10.5 L (4.16%)Rejected-AOC | ₹2.6 Cr+₹10.5 L (4.16%) | 3 | Rejected-AOC L3 |
| 4 | 4₹3.0 Cr+₹45.5 L (18.0%)Rejected-AOC | ₹3.0 Cr+₹45.5 L (18.0%) | 4 | Rejected-AOC L4 |
| 5 | 5₹3.0 Cr+₹51.6 L (20.4%)Rejected-AOC | ₹3.0 Cr+₹51.6 L (20.4%) | 5 | Rejected-AOC L5 |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
25 Sept 2024, 3:00 pmClosed
SUPERINTENDING ENGINEER, FOURTH CIRCLE IRRIGATION
OFFICE OF THE SUPERINTENDING ENGINEER, FOURTH CIRCLE IRRIGATION WORKS JHANSI, STATION ROAD JHANSI.
LOT NO.4- RESTORATION AND DEMARCATION WORK OF CANAL LAND FROM KM 0.000 TO 15.200 OF GOHAND DY. IN DISTRICT HAMIRPUR UNDER THE JURISDICTION OF SAPARAR DIVISION JHANSI.
2024_UPIDC_953571_4
01/SE-IV/2024-25
Open Tender
Civil Works
Item Rate
300 days
GOHAND
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,610
₹6.1 L
12 Nov 2024
12 Sept 2024
25 Sept 2024
12 Sept 2024
25 Sept 2024
12 Sept 2024
Amount
Cutting heavy under growth & bushes upto 7.5cm dia including removel of roots with collection and removel.
E/W in Mar, Kabar, Rankar and Kankar mixed soils in Digging/Cutting including lead upto 30 meter and lift upto 1.5 m. including Dressing, Making profile and Mannual compaction but excluding mechanical compaction.
Earth work in Mar, Kabar, Rankar and Kankar mixed soil in filling or Embankment including lead up to 195 mtr. and lift up to 1.5 mtr. including Dressing, Making profile and Mannual compaction with Complete of work , T&P etc.
Dismantling of Brick work or Stone work in Lime or Cement Mortor and i/e stacking of material as directed by Enigineer in charge within a distance of 60 m.
Excavation 0f Foundation in Mar, Kabar, Rankar and Kankar mixed soils including lead upto 30 meter and lift upto 1.5 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removel and disposal of surplus earth.
Laying P.C.C. M-10 (1:3:6) With cement , coarse sand of F.M not less then 2.5 and crused hard stone grit of size 4.75 to 20 mm size including all Material & Labour T&P etc.
Class-150 brick work in 1:4 With cement , coarse sand including cost of all Material, Labour T&P etc.
Centering & Shuttering for R.C.C. work in slab and bed block including all Material & Labour and T & P etc.
Laying R.C.C. M-20 (1:1.5:3 ) With cement , coarse sand and Stone grit 12 to 20 mm size including all Material & Labour and T&P etc.
Cutting, bending and placing TMT steel bar for Reinforcement with cost of binding wire with required for proper completion of work including cost of Materials , Labours, T&P, etc.
Struck Pointing with cement mortar (1:3) on bricks works including all Material & Labour and T&P etc.
Providing & Fixing of Wheel Guard
Providing and Laying Non Pressure NP-2 class (Light Duty) RCC Pipes with collarst jointed with stiff mixure of cement mortar in the propertion of 1:2 (1 cement:2 fine sand) including tasting of joint etc. complete.
Providing and Laying Non Pressure NP-3 class (Medium Duty) RCC Pipes with collarst jointed with stiff mixure of cement mortar in the propertion of 1:2 (1 cement:2 fine sand) including tasting of joint etc. complete.
Laying C.C. M-15 (1:2:4) With cement , coarse sand of F.M not less then 2.5 and crused hard stone grit of size 4.75 to 20 mm size including all Material & Labour T&P etc.
Providing and Fixing of 50 mm dia CPVC Drainage Pipe for Weep hole.
12.5 mm thick 1:4 cement plaster on brick masonary work including all Material & Labour and T&P etc.
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Painting of RCC Precast boundry piller size 250x250x1650 (mm) including cost of Material, Labour, T&P etc. proper completion of work as per direction of Engineer-in-Charge.
Supplying Stone Dust for laying below brick soling including all cost of Material,Labour and T&P etc.
Brick on Edge flooring (Dry)
Providing and Making vertical steel gate for H/R Including cost of MS plate, Channel, flate and other required cutting , welding ,as per required size etc. as per direction & Satisfaction of Engineer in Charge.
Casting of 1 piece C.I housing including cost of molding turning, boring and finishing proper size.
Provinding & Making Heliflex werm gear box complete with werm and werm shaft coupling, thirst bearing.
Casting of G.M Nut including cost of molding turning, boring and finishing proper size.
Providing & Making screw shaft 50 mm i/c cost of turning and threading proper 2500 mm mtr. Long.
Providing of bolt, nut and washer off size as per direction & satisfaction of Engineer in Charge.
Errection and Fitting charge of gate and head stock assembly, screw shaft and other required material and parts complete welding with cost of trained mechanical person from jhansi workshop to site cost of D.G sat, oxygen gas, electrod and required T&P and transportation charges at site as per direction & Satisfaction of Engineer in Charge.
TRISHIRA CONSTRUCTION PVT LTD
YUVRAJ CONSTRUCTION
M/S LODHI ENTERPRISES
M/s HARI CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .