Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.4 LAccepted-AOC 159 NEW BASTI STATION ROAD MURSAN DISTRICT HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | ₹60.4 L Quoted ₹62.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹63.6 LRejected-Finance BARANTI BAG ALIGARH ROAD HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | ₹63.6 L | L2 | Rejected-Finance rejected |
| 3 | L3₹65.4 LRejected-Finance MATHURA ROAD SUNDARVAN HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | ₹65.4 L | L3 | Rejected-Finance rejected |
| 4 | L4₹77.5 LRejected-Finance 69 DAMADA GA SAVA BAG AGRA | AGRA | AGRA | UTTAR PRADESH | ₹77.5 L | L4 | Rejected-Finance rejected |
Tender Value
₹1.1 Cr
EMD Value
₹7.4 L
Closing Date
23 Mar 2026, 12:00 pmClosed
S.E Aligarh
SE Aligarh Circle Aligarh
New Construction of Sukha to Khutipuri Road
2026_CEALG_1125660_4
1294/Cashier(PDH)-AC/2025 Dated 06.03.2026
Open Tender
Civil Works
180 days
Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.4 L
Yes
Aligarh
4 Jun 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
19 Mar 2026
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5(Excluding Cost of GST)
Cement Treated Subbase with 2% Cement Providing, Laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base.(Excluding Cost of GST)
Cement Treated base with 4% Cement Providing, Laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base.(Excluding Cost of GST)
Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.70 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Machanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work. As per MORD specification No. 502(Including Cost of Bitumen/Emulsion But Excluding Cost of GST)
Providing & applying Tack Coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.35Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Machanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work, as per MORD specification No. 503(Including Cost of Bitumen/Emulsion But Excluding Cost of GST)
Providing, laying & rolling of open graded Premix Carpet of 20mm thickness composed of 13.2mm to 5.60mm aggregates including mixing in a suitalbe plant, laying & rolling iwth a three wheeled 80-100KN static roller capacity, finished to required level & grades bitumen @ 14.6Kg./10Sqm. area for premixing including all material, Labour and T&P etc required for proper completion of the work, as per MORD Specification No. 508(Including Cost of Bitumen/Emulsion But Excluding Cost of GST)
Providing and laying seal coat type "C" scaling the voids in a bituminous surfsce PC. surface laid to specified levels grade and cross fall using with 67 mm nominal size grit of Approved quarry @0.09 cum per 10sqm with Bitumen @ 6.50 kg/10sqm including heating of Bitumen to the required temperature and including all material, Labour & T&P ete as per Clouse 510 of MORD Specification.(Including Cost of Bitumen/Emulsion But Excluding Cost of GST)
Construction of Subgrade and earthen shoulders of embankment with approved material obtained from borrow pits with a lift upto 1.5m transporting to site, spreading, grading to required slope and compacting to meet requirement of as per Technical specification clause 303.1 (Excluding Cost of GST)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (Kilometre Stone)(Excluding Cost of GST)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (Hectometer Stone)(Excluding Cost of GST)
Direction and place Identification signs with size more than 0.90 sqm size Board Providing and erecting direction and place identification retro-reflectorised sign as per IRC-67 made of high intensity grade sheeting The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retro reflection, daytime colour and luminance, shrinkage, flexibility, liner removal, adhesion, impact resistance, specular gloss and fungus resistance, 3 years outdoor weathering and its having passed these tests shall be obtained from international/Government Laboratory/ Institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D 4956-09) on artificial accelerated weathering requirements from a reputed laboratory in india can be accepted provisionally. In such a situation, the Employer/Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67:2012. Legends, letters, numerals and borders etc should be as per MORTH specification No-801.3.7. Sheet fixed over aluminium sheeting 2 mm thick with area exceeding 0.9 sqm. Supported on a mild steel single angle iron post 75×75×6 mm firmly fixed to the ground by means of property designed foundation with M-15 grade cement concrete 45×45×60 cm., below ground level as per approved drawing, complete. As Per SOR(Excluding Cost of GST)
Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3(Excluding Cost of GST)
Plain cement concrete 1:3:6 nominal mix in foundation Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203days.(Excluding Cost of GST)
Providing and laying of 40 mm gauge B/B under Hume pipe culvert foundation in road work including all materials, labours, T&P etc. required for completion of the work. As per SOR Ch. 1(2.1.1)(Excluding Cost of GST)
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203(Excluding Cost of GST)
Supply, laying and fixing of NP-4 class hume pipes in proper position in culvert includin all materials, Labour, T&P etc. complete as per requirements of Site. As Per Direction of E/I. foundation below HP Level (For 350mm)(Excluding Cost of GST)
Supply, laying and fixing of NP-4 class hume pipes in proper position in culvert includin all materials, Labour, T&P etc. complete as per requirements of Site. As Per Direction of E/I. foundation below HP Level (For 600mm)(Excluding Cost of GST)
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204(Excluding Cost of GST)
Plastering with cement mortar (1:3), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204(Excluding Cost of GST)
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915(Excluding Cost of GST)
Part-A (Bituminous Work) 05 Year Maintenance Charge @ 7.50%) Routine Maitenance of road for 05 Years after the completion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year @ Nill
2nd Year @ 0.75%
3rd Year @ 1.50%
4th Year @ 2.25%
5th Year @ 3.00%
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5(Excluding Cost of GST)
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i)For Grading I Material(Excluding Cost of GST)
CEMENT CONCRETE PAVEMENT (CC ROAD) Construction of un-reinforcement plain cement concrete pavement thickness as per design, over a parepared sab base with 43 grade coment or any other type as per clause 1501 1.2M 30(grade) coarse and fine ggregate conforming to IS 383 maximum size of coarse aggregate not exceeding 25mm mised in a concrete mixer of not less then 0.2 Cum capacity and appropriate weight batcher Josing approved mix design, laid in approved fixed side from work (Steel channel laying and faxing of 125 micron thick plastic sheet, wedges steel plates including levelling the form unk as per drawing) spreading the concrete with shovels, rakes compacted using needle arved and plate vibrators and finished in continuous operation including provision of traction and expansation construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (Where pecified) and water finishing to lines and grade as per drawing and technical specification approved Quarry grit Clause 1501.(Excluding Cost of GST)
Construction of Subgrade and earthen shoulders of embankment with approved material obtained from borrow pits with a lift upto 1.5m transporting to site, spreading, grading to required slope and compacting to meet requirement of as per Technical specification clause 303.1 (Excluding Cost of GST)
Part-A (Bituminous Work) 05 Year Maintenance Charge @ 2.50%) Routine Maitenance of road for 05 Years after the completion of work (Vide shasanadesh No. 17/2024/सा0-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & letter No. 36890C/RMC/Mool-23-24 Dated 17.02.2024 of ENC PWD. Rate Excluding of G.S.T.) 1-1st Year @ Nill
2nd Year @ 0.25%
3rd Year @ 0.50%
4th Year @ 0.75%
5th Year @ 1.00%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.93 MB
BOQ_2098533.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid