Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹3.9 LAdmitted-Finance | ₹3.9 L | H1 | Admitted-Finance |
| 2 | H2₹3.9 L−₹2,220.09 (0.57%)Admitted-Finance | ₹3.9 L−₹2,220.09 (0.57%) | H2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | kalimuthu H2 | M.BUVANESWARI H1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub soils exceipt hard rock requiring blasting with intial lead and lift including re-filling the sides of foundation in layers of 15cm thick watering, ramming, depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. | 13 | m3 | 246.52 ₹3,205.65 Lowest | 246.52 ₹3,205.65 Lowest |
| 2.00 | Cement concrete 1:4:8 mix (one cement four sand eight aggregate) using 40mm ISS gauge HBG metal for foundation including cost and conveyance of all materials and all labour charges for mixing, laying, ramming, curing concrete etc., complete as per standard | 2 | m3 | 5,262.68 ₹10,523.25 Lowest | 5,262.68 ₹10,523.25 Lowest |
| 3.00 | Reinforced Cement Concrete 1:1 ½ :3 mix (One cement one and half sand and three aggregate) using 20mm size ISS gauge HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying, ramming, curing concrete etc. | 9 | m3 | 8,254.7 ₹74,253.01 Lowest | 8,254.7 ₹74,253.01 Lowest |
| 4.00 | Supplying and fabrication of steel for all RCC works including cost of steel, binding wire and labour charges and fabrication and placing in position etc., complete as per standard specification. | 900 | kg | 87.5 ₹78,750 Lowest | 89.88 ₹80,892 |
| 5.00Centering charges for all RCC items including cost and conveyance and all other labour charges as per standard specification. | |||||
| 5.01 | Square column | 38 | m2 | 950.4 ₹36,117.1 Lowest | 950.4 ₹36,117.1 Lowest |
| 5.02 | Plain surface | 59 | m2 | 1,132 ₹66,784.6 Lowest | 1,133.31 ₹66,861.89 |
| 6.00 | Brick work in Cement mortar 1:5 mix using country bricks of size 8.3/4" X 41/4" X 2" including all cost and convayance of all Materials to site and all labour charges etc complete. | 2 | m3 | 7,155 ₹14,335.61 Lowest | 7,155.4 ₹14,336.42 |
| 7.00 | Special ceeling Plastering with CM 1:3 10mm thinck including cost and conveyance of all materials and all labour charges etc., complete. | 31 | m2 | 309.73 ₹9,600.08 Lowest | 309.73 ₹9,600.08 Lowest |
| 8.00 | Plastering with CM 1:5 12mm thinck including cost and conveyance of all materials and all labour charges etc., complete. | 41 | m2 | 269 ₹11,030.08 Lowest | 269 ₹11,030.08 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
29 Aug 2025, 3:00 pmClosed
Executive Officer Kombai Town Panchayat
Executive Officer Kombai Town Panchayat
Construction of Burning shed at Ward 13 Chettiyar Mayanam in Kombai Town Panchayat
2025_DTP_596292_1
118-2025
Open Tender
Civil Works
Works
Construction of Burning shed at Ward 13 Chettiyar
Pls refer to tender Documents
3 documents required · 3 mandatory
₹0
₹4,700
Yes
Executive Officer Kombai Town Panchayat
27 Apr 2026
22 Aug 2025
29 Aug 2025
22 Aug 2025
29 Aug 2025
22 Aug 2025
25 Aug 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .