Tender Value
₹17.5 L
EMD Value
₹18,000
Closing Date
27 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
O/o Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Rejuvenation of water bodies works at S.Pudur Block in Sivagangai District - Package No.56
2022_RDTN_243328_1
56_Pack_AGAMT II 21-22/SPR
Open Tender
Civil Works
Item Rate
90 days
Sivagangai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,000
13 Aug 2022
22 Jul 2022
27 Jul 2022
22 Jul 2022
27 Jul 2022
22 Jul 2022
Amount
Improvements of Pancha Ayyanar Kovil Oorani @ Musundapatti Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Construction of Lining wall
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Improvements of Manthai Oorani @ Musundapatti Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Renovation of Bathing Ghat
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Construction of Lining wall
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Improvements of Ammapatti Village Kallukatti Oorani @ Valasaipatti Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Construction of Bathing Ghat
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
RCC 1:1.5:3 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Construction of Inlet
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Improvements of Pillampatti village Vilaa Oorani @ Valasaipatti Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Construction of Bathing Ghat
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
RCC 1:1.5:3 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Construction of Retaining wall
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Improvements of Pallar Chettikurichy Kallu Oorani @ Chettikurichy Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Construction of Lining wall
Earthwork excavation and depositing on bank in all classes of soil with initial lead & lift as per SS 20B for foundation etc complete
Collection and filling with good river sand including all cost & conveyance of all materials to site & all labour charges etc complete
CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete for Below ground
CC 1:3:6 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N RAMACHANDRAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .