| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹22.1 LAccepted-AOC | ₹22.1 L | L-1 | Accepted-AOC AOC |
| 2 | L-2₹24.2 L+₹2.1 L (9.51%)Rejected-Finance | ₹24.2 L+₹2.1 L (9.51%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹24.8 L+₹2.7 L (12.1%)Rejected-Finance | ₹24.8 L+₹2.7 L (12.1%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹25.5 L+₹3.4 L (15.4%)Rejected-Finance 785 SNEH MARRIAGE HALL KE SAMNE BASHARATPUR SHAHPUR GORAKHPUR | ₹25.5 L+₹3.4 L (15.4%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹26.3 L+₹4.3 L (19.3%)Rejected-Finance 101 KRISHNA VIHAR RAILWAY COLONY QUARSI RAMGHAT ROAD ALIGARH | ₹26.3 L+₹4.3 L (19.3%) | L-5 | Rejected-Finance L-5 |
Tender Value
₹33.2 L
EMD Value
₹66,400
Closing Date
21 Oct 2023, 1:00 pmClosed
EE, BDGC, BSR
EE, BDGC, BSR
Renewal and Repairs of Service Road of Bulandshahr Dy from km. 43.215 to km. 44.900
2023_UPIDC_851932_6
11/EE/2023-24
Open Tender
Civil Works
Fixed-rate
60 days
Bulandshahr
FEE/EMD/TECH
2 documents required · 2 mandatory
₹354
₹66,400
26 Feb 2024
16 Oct 2023
21 Oct 2023
16 Oct 2023
21 Oct 2023
16 Oct 2023
Amount
Cleaning thick bushes and thorny jungle with proper disposal including cost of all labour and T&P etc, completion of the work as per the direction of Engineer-in- charge.
Uprooting jhunds including dressing and proper disposal including cost of all labour and T&P etc, completion of the work as per the direction of Engineer-in-charge.
Earth work in cutting in Silt/ Soil from top of embankment top of road and top of brick work etc and its to be used in restoration dowla embankment etc with all lead and lift with proper compaction and dressing .
Earth work in restoration of embankment in ordinary soil in making profile, proper Compaction & dressing and lead upto 3 km and lift upto 1.50 m including dressing etc.
Scraping old painted surface including disposal of all scraped material to a distance of 30 meters (100 ft) as directed by Engineer-in-charge. (by nachanical)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable Mix plant, laying with paver machine and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades etc. as per Technical Specification Clause 508.
Providing and laying seal coat with VG-10 Grade Bitumen by suitable Mix plant, laying with paver machine and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades, sealing the voids in a bituminous in Type B as per Technical Specification Clause 510
Providing and laying of Hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 the fineshed surface to be level, uniform and free from streaks and holes rates are inclusive of all taxes, royality etc. all T&P/ machine material and labour required for proper completion of work.
Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joint filled with local sand including prepartion of base to prpper slope and its ramming spreading layer of 1 cm depth of local sand over the subgrade and including supply of all materials labour tools & plant etc required for proper completion of the work.
M/S PUSHPENDER KUMAR SHARMA
M/s Janpriya Singh Contractor
Aman Construction
M/S S K BUILDERS
M/s Kapil Kumar Sharma
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .