Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹16 L
EMD Value
₹32,000
Closing Date
1 Jun 2020, 4:00 pmClosed
Executive Engineer
Executive Engineer Jal Shakti PHE Mechanical Division (South) Awantipora
Fixing of rate contract for repairs to HT Distribution Transformers installed at different WSSs of PHE Mechanical Sub-Division PAMPORE, BIJBEHARA, SHOPIAN, Qazigund (District Anantnag, Kulgam, Pulwama and Shopian) for the financial year 2020-21
2020_PHE_97023_10
JSD/PHE/MDSA OF 01 2020-21
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
2 days
shopian
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer
₹32,000
23 Jun 2020
19 May 2020
3 Jun 2020
19 May 2020
1 Jun 2020
19 May 2020
Repairs to 25KVA HT transformers including following series of works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Released scrap Iron /MS
Repairs to 63KVA HT transformers including following series of works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Released scrap Iron /MS
Repairs to 100KVA HT transformers including following series of works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Released scrap Iron /MS
Repairs to 250KVA (Aluminium wound) HT transformers including following series of works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Released scrap Iron /MS
Repairs to 250KVA (Copper Wound) HT transformers including following series of works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding Copper)
Providing / Fitting of LV Winding (Copper)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (Copper)
Damaged brass parts
Released scrap Iron /MS
Repairs to 400KVA HT transformers including following series of works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Copper)
Providing / Fitting of LV Winding (Copper)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (Copper)
Damaged brass parts
Released scrap Iron /MS
Repairs to 25KVA HT transformers including following series of works (6.6 KV/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Released scrap Iron /MS
Repairs to 63KVA HT transformers including following series of works(6.6 KV/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Released scrap Iron /MS
Repairs to 100KVA HT transformers including following series of works(6.6 KV/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Released scrap Iron /MS
Repairs to 250KVA (Aluminium wound) HT transformers including following series of works(6.6 KV/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Released scrap Iron /MS
Repairs to 250KVA (Copper Wound) HT transformers including following series of works(6.6 KV/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding Copper)
Providing / Fitting of LV Winding (Copper)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve with Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Gun metal valves
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 11 KVA grade dielectric strength of 5 KV at 4mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (Copper)
Damaged brass parts
Released scrap Iron /MS
Note: The Scrap Value mentioned above shall be deducted from the total valve of BOQ to arrive at value without scrap. The value thus attained shall be again deducted by total scrap value to get the effective amount on BOQ for ascertaining overall L1. Unless specified, the old material shall be returned to divisional/sub divisional store
North Sun Enterprises
North Sun Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .