Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical B 4 32 VAISHALI NAGAR CHITRAKOOT NAGAR NEAR PHOENIX DENTAL CARE JAIPUR RAJASTHAN 302021 | JAIPUR | RAJASTHAN | 302021 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹99.7 L
EMD Value
₹1 L
Closing Date
24 May 2024, 2:00 pmClosed
SE ESWC BANDA
SE ESWC BANDA
Construction of new 33 kv line (25km) from 220 kv sub-station Tindwari road banda to 33/11 kv sub-station tindwari, banda (Semi Turn-key)
2024_DVVNL_921107_3
SE/ESWC/BANDA/16/2023-24
Open Tender
Electrical Works
Turn-key
120 days
BANDA
Construction of new 33 kv line (25km) from 220 kv sub-station Tindwari road banda to 33/11 kv sub-station tindwari, banda (Semi Turn-key)
2 documents required · 2 mandatory
₹3,540
DVVNL
₹1 L
4 Jun 2024
18 May 2024
24 May 2024
18 May 2024
24 May 2024
18 May 2024
33 KV line for 33/11 S/s Tindwari
M.S. Angle Iron 65x65x6 mm (Bracing With 4 Clamp)
Top Channel 125x65x6 mm,3200 mm (10.7 kg/m) With Clamp
33 KV V-Type X-Arm
Cross Arm Holding Clamp With Nut & bolts
F-Bracket With N & B/ Top Hambler
Earth Wire Clamp With N & B
Armour Rod With Ferrules
Stone Pad (300x300x75 mm)
P.G. Clamp For Dog To Dog Conductor
E Bracket For 33 KV
33 KV Number Plate With Clamp And N & B
33 KV Danger Board With Clamp And N & B
G.I. Barbed Wire
Alluminium Tape
Nut, Bolt & Washers
Alluminium Paint
Red Oxide Paint
Stay Set Complete
Alluminium Binding Wire
Earthing Complete
M.S. Angle 75x75x6 mm 2.5 m Long WITH Holding Clamp, N & B
G.I. Wire 6 SWG
G.I. Wire 10 SWG
Eye Bolt
Turn Buckle
33 KV Cable Joiting Kit
G.I.Pipe 6" Dia With Holding Clamp
S.T.P. Pole 11 Mtr. Long
S.T.P. Pole 13 Mtr. Long
* 33 KV Polymer Disc Insulator With Fitting
33 KV Composite Polymer Pin Insulator
33 KV XLPE Cable 3x300 SQMM
A.C.S.R. Dog Conductor (25*3=75+3.03%=77.48)
Concreting of the support is to done as per relevant drawing enclosed, by a mixture of 1:4:8 (by volume). The size of the pole plinth is kept as 450x450 mm and height 300 mm above ground level (Muffing) as per drawing. The top 100 mm is kept tapered so that no rainwater gets accumulated on the top. The underground portion of the concreting shall be 450 mm x 450 mm x depth of plantation of support.
Concreting of Stay
Digging Of Trench By Exacavation Of Earth Laying Of Bricks To Cover The Cable With Laying Of 33 KV Cable
Tree Cutting With Chopping Of Tree Braches
M/s APOORWA ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .