| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.2 LAccepted-AOC | ₹82.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹82.8 LRejected-Finance | ₹82.8 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SRI VALLI ENGINEERING WORKS L1 | Sri Aishwarya Construction L2 |
|---|---|---|---|---|---|
| 1.00Providing CC Road at Edankondanpattu School Street in Ayeekuppam Panchayat | |||||
| 2.00 | Earthwork excavation in all classes of soils except hadr rock in hard ORDINARY SOIL with initial lead and lift including all other labour charges etc. Complete as per SS 20 B. | 341.01 | Cum | 263.75 ₹89,941.39 | 269 ₹91,731.69 |
| 3.00 | Supply and Filling with sand from approved Quarry including all other labour charges etc. Complete | 115.53 | Cum | 2,181.65 ₹2,52,046.02 | 2,225.5 ₹2,57,112.02 |
| 4.00 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors . complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | 820.95 | Sqm | 547.45 ₹4,49,429.08 | 558.45 ₹4,58,459.53 |
| 5.00 | Cement Concrete 1:3:6 using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 87.15 | Cum | 6,717.15 ₹5,85,399.62 | 6,852.25 ₹5,97,173.59 |
| 6.00 | Cement Concrete 1:4:8 ( One Cement Four sand and Eight Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 115.53 | Cum | 5,960.85 ₹6,88,657 | 6,080.7 ₹7,02,503.27 |
| 7.00 | Wearing coat Cement Concrete 1:2:4 using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 118.41 | Cum | 7,267.8 ₹8,60,580.2 | 7,413.9 ₹8,77,879.9 |
| 8.00 | Provision for Tarpad | 23.63 | No | 234.25 ₹5,535.33 | 239 ₹5,647.57 |
| 9.00 | Provision for Name Board Charges | 1 | No | 4,499.55 ₹4,499.55 | 4,590 ₹4,590 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} | 1 | GST Amount | 52,85,550 ₹52,85,550 | 52,85,550 ₹52,85,550 |
Tender Value
₹35.0 L
EMD Value
₹35,000
Closing Date
7 Jan 2026, 3:00 pmClosed
BDO
Panchayat Union kurinjipadi
Providing CC Road with Drainage at Agaram Colony in Agaram Panchayat.
2025_RDTN_637727_1
A3/1162/2025
Open Tender
Civil Works - Roads
180 days
kurinjipadi
As per tender
2 documents required · 2 mandatory
₹0
₹35,000
31 Mar 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
Providing CC Road at Edankondanpattu School Street in Ayeekuppam Panchayat
Earthwork excavation in all classes of soils except hadr rock in hard ORDINARY SOIL with initial lead and lift including all other labour charges etc. Complete as per SS 20 B.
Supply and Filling with sand from approved Quarry including all other labour charges etc. Complete
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors . complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Cement Concrete 1:3:6 using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Cement Concrete 1:4:8 ( One Cement Four sand and Eight Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Wearing coat Cement Concrete 1:2:4 using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Provision for Tarpad
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_763214.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
BOQ_763214.xls
BOQ • 0.25 MB
Agaramcolony.pdf
Tender Documents • 0.45 MB
Download all tender documents and submit your bid