Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-AOC NO 22 KUNNIJI NAGAR 1ST STREET EAST TAMBARAM CHENNAI 600 059 TAMIL NADU | CHENNAI | CHENNAI | TAMIL NADU | 600059 | ₹20.4 L | L1 | Accepted-AOC Lowest Bid |
| 2 | L2₹20.6 L+₹13,750 (0.67%)Rejected-AOC NEIKUPPI VILLAGE VENGAPAKKAM POST KALPAKKAM 603 102 KANCHEEPURAM DIST | KALPAKKAM | KANCHEEPURAM | TAMIL NADU | 603102 | ₹20.6 L+₹13,750 (0.67%) | L2 | Rejected-AOC Not L1 |
| 3 | L3₹22.3 L+₹1.8 L (8.94%)Rejected-AOC NO 03 45 NEIKUPPI VILLAGE VENGAPAKKAM POST KALPAKKAM CHENGALPATTU DISTRICT 603 102 | KALPAKKAM | CHENGALPATTU | TAMIL NADU | 603102 | ₹22.3 L+₹1.8 L (8.94%) | L3 | Rejected-AOC Not L1 |
| 4 | L4₹24.5 L+₹4.0 L (19.8%)Rejected-AOC 88 30 RAMASAMY GARDEN ADYAR ARUNACHALAPURAM ADYAR CHENNAI TAMIL NADU 600020 | CHENNAI | TAMIL NADU | 600020 | ₹24.5 L+₹4.0 L (19.8%) | L4 | Rejected-AOC Not L1 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
18 Jul 2026, 6:00 pmClosed
GE NAVY CHENNAI
GE Navy Chennai Military Engineer Services Fort St George Rajaji Salai Chennai 600 009
TERM CONTRACT FOR ARTIFICERS WORKS FOR NAVY BUILDINGS OTM MD ACCN INCL MISC WORKS IN ZONE C INS PALLAVA AREA UNDER GE NAVY CHENNAI
2026_MES_773964_1
8813/E8
Open Tender
Civil Works
Item Rate
365 days
CHENNAI
AS PER NIT
8 documents required · 8 mandatory
₹500
GE Navy Chennai
₹50,000
Yes
22 Aug 2026
22 Jun 2026
20 Jul 2026
22 Jun 2026
18 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule of Works | |||||
| 1.01 | Term Contract for Artificers works to perform such services and execute such works upon the terms and condition contained or referred to in the tender documents and upon the conditions as per tender documents contained as may be demanded and as enumerated in the MES standard Schedule of rates Part-I,2009 (specifications) and Part-II (Rates) of 2020 as amended upto bid submission end date (hereinafter and in IAFW-2249 referred to as the MES schedules) together with amendment Nos 01 to 03 for Part-I and as applicable to the above said schedules forming part of tender document during the period of ONE YEAR from the date of acceptance of performance security at the rates contained in the aforesaid MES Schedule.
NOTE:
(i) Tenderer shall insert percentage at the 16 th row and 4th & 5th column of this BOQ excel sheet.
(ii) Tenderer shall refer and select the option excess(+) or less(-) sheet to quote the percentage above or below MES standard Schedule of rates Part-II, 2020 as amended upto bid submission end date.
(iii) Amount inserted by the MES under rate column and the total amount reflected in this page is approximate and for reference only being Term Contract Separate orders as per requirement of work will be ordered. The work order is to be priced at rates given in SSR and adjusted by the percentage quoted by the contractor.
(iv) Irrespective of quoted amount generated by the system in the BOQ, Acceptance of Contract shall be made for the total estimated amount and percentage (Excess/Less) thereto quoted by the tenderer. However, the total contract sum shall not exceed total estimated amount shown in BOQ. | - | Year | 25,00,000 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_866639.xls
BOQ • 0.28 MB
8813Tender.pdf
Tender Documents • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .