| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹18.7 L+₹4,440.93 (0.24%)Admitted-Finance 02 | L2 | Admitted-Finance | |
| 3 | L3₹18.7 L+₹9,263.58 (0.50%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S NISAR CONSTRUCTION L1 | M/S BABA ENTERPRISES L3 | M/S DURGA ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.10Survey of Substations & WORK | ||||||
| 2.00 | Checking of incomming & outgoing VCB Panel working and parts on Quarterly basis( once in a three (03) month) | 39 | Yearly per Substation | 1,55,922 ₹1,55,922 Lowest | 1,59,900 ₹1,59,900 | 1,56,000 ₹1,56,000 |
| 3.00 | Complete overhauling of Panel, insulation of bus bar with HT Tape, Empire Tape and cleaning of spouts | 12 | JOB | 47,976 ₹47,976 Lowest | 48,300 ₹48,300 | 48,120 ₹48,120 |
| 4.00 | Complete Overhauling of Trolley and Manual and Motorised charging mechanism. | 12 | JOB | 23,988 ₹23,988 Lowest | 24,216 ₹24,216 | 24,000 ₹24,000 |
| 5.00 | Repairing and adjusting of Tripping Assembly and circuit. | 12 | JOB | 23,988 ₹23,988 Lowest | 24,216 ₹24,216 | 24,000 ₹24,000 |
| 6.00 | Repairing and adjusting of Closing Assembly and circuit. | 12 | JOB | 23,988 ₹23,988 Lowest | 24,216 ₹24,216 | 24,000 ₹24,000 |
| 7.00 | Adjusting of tripping and closing timing of breaker by checking contact resistance of Vacuum Interrupter of VCB. | 12 | JOB | 17,991 ₹17,991 Lowest | 18,120 ₹18,120 | 18,120 ₹18,120 |
| 8.00 | Replacement and Adjustment of Vacuum Interrupter | 12 | JOB | 17,991 ₹17,991 Lowest | 18,120 ₹18,120 | 18,120 ₹18,120 |
| 9.00 | Repairing and Adjusting of shutter Assembly | 12 | JOB | 29,985 ₹29,985 Lowest | 30,120 ₹30,120 | 29,985 ₹29,985 Lowest |
| 10.00 | Repairing and Adjusting of Interlocks | 12 | JOB | 23,988 ₹23,988 Lowest | 24,300 ₹24,300 | 24,120 ₹24,120 |
Tender Value
Refer Docs
EMD Value
₹19,000
Closing Date
3 Feb 2026, 2:00 pmClosed
SE EDC BASTI
SE EDC BASTI
Annual maintenance work of 33/11 KV VCB/Control Panel installed at 33/11 substations under Electricity Distribution Circle -Basti
2026_PVVNV_1105676_2
52/EDC(B)/2025-26
Open Tender
Electrical Works
Lump-sum
BASTI
AS PER TENDER
2 documents required · 2 mandatory
₹3,540
SE EDC
₹19,000
7 Feb 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
Survey of Substations & WORK
Checking of incomming & outgoing VCB Panel working and parts on Quarterly basis( once in a three (03) month)
Complete overhauling of Panel, insulation of bus bar with HT Tape, Empire Tape and cleaning of spouts
Complete Overhauling of Trolley and Manual and Motorised charging mechanism.
Repairing and adjusting of Tripping Assembly and circuit.
Repairing and adjusting of Closing Assembly and circuit.
Adjusting of tripping and closing timing of breaker by checking contact resistance of Vacuum Interrupter of VCB.
Replacement and Adjustment of Vacuum Interrupter
Repairing and Adjusting of shutter Assembly
Repairing and Adjusting of Interlocks
Servicing and adjusting of Spring charging Motor
Repairing of spouts with complete cleaning and adjusting
Complete cleaning of trench, tightening of cable boxes with rerouting of cable
Complete wiring of Pannels with checking of fuse and indicators
Complete testing of Tripping system of Breaker for successful Tripping
Replacement of Damage CT/PT Including Wiring
Spare+Sundry Cost (Provided By Contractor)
Cam Shaft Assembly
Charging Motor Rectifier
Charging Spring
HRC Fuse 3.15 Amp
Indicators
Flexible Connections
Charging Gear Big with Bearing
Charging Gear Small with Bearing
Insulated Housing Assembly for VI
Tulip contact
Upper Terminal Assembly
Lower Terminal Assembly
Rack In Gear
Tripping Coil 24V
Tripping Plate
Rack out Gear
Copper Wire 1.5 mm
Crank Assembly
Drive Shaft
Charging Handle
I/O Spout Set Busbar Side
I/O Spout Set CT Side
Closing Assembly
Closing Coil (24 V DC)
TNC Switch
Pla Relay
Terminals
Limit Switches
HRC Fuse 2A, 6A
Charging Motor
Vacuum Interrupter of different make
Support Insulator
Copper Strip Busbar (3 Phase for 1 Meter)
Auxiliary Switch
MCB 32AMP, 3P
SPACE HETER
THERMOSTATE
Ampere Meter
Volt Meter
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_2050683.xls
BOQ • 0.27 MB
52t.pdf
Additional Documents • 0.36 MB
TD52.rar
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .