Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance GRAM DEVRADA TARABGANJ DISTRICT GONDA UTTAR PRADESH | GONDA | UTTAR PRADESH | 271001 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
18 Apr 2022, 12:00 pmClosed
Superintenging Engineer
EDC Ayodhya
Bifurcation of 11 KV SE Feeder Emaniting from 33/11 KV Sub-Station Mangari and Construction of 11 KV line for load Share for 11 KV SW Feeder from 33/11 KV Sub-Station Bikapur Under Electricity Distribution Division-IInd, Ayodhya
2022_MVVNL_686828_1
13 H(F)(W)/2022-23
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
As Per Tender Specification
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹4,000
20 Apr 2022
11 Apr 2022
18 Apr 2022
11 Apr 2022
18 Apr 2022
11 Apr 2022
Amount
Carriage including loading, unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 50 Kms. (distance approx)
PCC Pole 8.5 Mtr. Long
S.T. Pole 11 Mtr. Long
11KV XLPE cable 3x185 sq.mm
11 KV Cable Jointing Kit 3x185 sq mm outdoor
ACSR Weasel Conductor
Other matching Materials
Dragging of PCC/ST Pole from dump site to pit site
Fabrication and Errection of Double Pole Support on PCC Pole 8.5 Mtr. long including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Single Pole Support on PCC Pole 8.5 Mtr. long including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Single Pole Support on ST Pole 11 Mtr long including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Earthing of Poles as per RESPO Norms
Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Laying of underground 11 KV 3x185 sq mm XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Hanaging Hosting & clamping and G.I. Pipe channel nut & Bolt 3x185 mm2 XLPE 11 KV cable (cost of all accessories will be borne by contractor) as per RESSPO Norms
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x185 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any.
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
M/S ALOK CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .