Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st lowest₹2.8 CrAccepted-AOC | 1st lowest | Accepted-AOC Award of contract to Sri Chandan Kumar Bisoi, A Class Contractor | |
| 2 | 2nd lowest₹3.2 Cr+₹38.3 L (13.8%)Rejected-AOC NIRUPAMA NILAYAM KUMBHAR SAHI JEYPORE JEYPORE KORAPUT ODISHA 764003 | KORAPUT | ODISHA | 764003 | 2nd lowest | Rejected-AOC REJECT | |
| 3 | 3rd lowest₹3.7 Cr+₹94.2 L (33.9%)Rejected-AOC CHANDANBADA STREET WARD NO 25 PO PS JEYPORE DIST KORAPUT PIN 764001 | JEYPORE | KORAPUT | ODISHA | 764001 | 3rd lowest | Rejected-AOC REJECT | |
| 4 | 3rd lowest₹3.7 Cr+₹94.2 L (33.9%)Rejected-AOC AT CHARANGUL PO PS SEMILIGUDA DIST KORAPUT PIN NO 764036 | KORAPUT | ODISHA | 764036 | 3rd lowest | Rejected-AOC REJECT |
Tender Value
₹3.7 Cr
EMD Value
₹3.7 L
Closing Date
17 Jun 2026, 5:00 pmClosed
Chief Construction Engineer
Rural Works Circle, Sunabeda, At-Sunabeda-1, Near Jagannath Temple, PIN-763001, Dist-Koraput.
Construction of RD Road to Charampi in the District of Koraput under Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27.
2026_CERWI_130776_1
CCERWCSBD ONLINE 20 2026 27
National Competitive Bid
Civil Works - Roads
Percentage
270 days
SUNABEDA
4 documents required · 4 mandatory
₹10,000
₹3.7 L
Yes
16 Oct 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
17 Jun 2026
3 Jun 2026
3 Jun 2026 - 16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 but excluding the charges of GST etc. complete & as per direction of the Engineer-in-Charge. | 13,665 | sqm | 8.63 | ₹1,17,928.95 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 | 350 | sqm | 877.16 | ₹3,07,006 |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoRTH specifications for Road & Bridge works (4th revision) but excluding the charges of GST etc complete as per specification & direction of Engineer-in-Charge.. | 9,622.07 | cum | 271.82 | ₹26,15,471.07 |
| 4 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 14,289.57 | cum | 50.46 | ₹7,21,051.7 |
| 5 | Excavation in ordinary rock using Hydraulic Excavator of 0.9 cum bucket capacity including cutting and loading in tippers,transporting to embankment site with a lift upto 1000m,trimming bottom and side slopes in accordance with requirements of lines,grades and cross-section as per Techinal Specification clause 302.3.5. | 13,192.68 | cum | 86.12 | ₹11,36,153.6 |
| 6 | Excavation in Hard Rock (blasting prohibited by mechanical means) as per technical specificaation clause 302 | 2,827 | cum | 422.16 | ₹11,93,446.32 |
| 7 | Cutting in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing materials within 50m initial lead and 1.5m initial lift including rough dressing as per direction and specification of the department including stacking the useful materials separately as ordered. | 2,827 | cum | 629.51 | ₹17,79,624.77 |
| 8 | Fine dressing and turfing including transportation by mechanical means with all leads and lifts and placing of turfs in position and ramming with thapies including watering and cost of labour and all materials but excluding the charges of GST etc. complete as per the direction of the Engineer-in-Charge. | 20,227.36 | sqm | 29.17 | ₹5,90,032.09 |
| 9 | Providing & laying Granular Sub-Base in layers not exceding 225 mm watering and compacting to required density in O.M.C with Vibratory Roller including hire and running charges of VRR etc complete. | 2,540.26 | cum | 854.04 | ₹21,69,483.65 |
| 10 | Collecting,Supplying and Spreading moorum in shoulder of 150mm thick complete including cost carriage of material and hire charges of PRR but excluding the charges of GST etc. complete as per the direction of Engineer-In-Charge | 614.93 | cum | 539.44 | ₹3,31,717.84 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.67 MB
Tendernotice_1.pdf
PDF • 3.57 MB
BOQ_594198.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .