Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | ₹1.6 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S. BABU ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00Scope of Work: Repairing and Rewinding of 02 Nos. DC Trip Motors 2HP for BE-195 & Marion and 02 Nos. 1KVA CVT (Constant Voltage Transformer) for 182 Merion Shovels at Nigahi Project. Maximum likely manpower to be deployed per shift: 03 Nos. ( 01 No. Skilled and 02nos semi-skilled). | ||||
| 2.00Repairing and Rewinding of 02 Nos. DC Trip Motors 2HP Capacity : | ||||
| 2.01 | Cost/Charges of Super Enameled copper wire SWG-22 for repairing of main pole and inter poles ( 17 Kg each Motor ). Total 02 Nos. DC Trip Motor. | 34 | kg. | 980 ₹33,320 |
| 2.02 | Cost/Charges of Super Enameled copper wire SWG-16.5 for repairing of armature ( 13 Kg each Motor ). Total 02 Nos. DC Trip Motor. | 26 | kg. | 980 ₹25,480 |
| 2.03 | Cost/Charges of Nomex paper 3mill for repairing work ( 1.5 Kg each Motor ) Total 02 Nos. DC Trip Motor. | 3 | kg. | 2,500 ₹7,500 |
| 2.04 | Cost/Charges of glass tape 3/4inch x 50 mtr for repairing work ( 10 rolls each Motor) Total 02 Nos. DC Trip Motor. | 20 | Roll | 150 ₹3,000 |
| 2.05 | Cost /Charges of glass fiber wedge for repairing work ( 24 Nos. each Motor ) Total 02 Nos. DC Trip Motor | 48 | Nos. | 30 ₹1,440 |
| 2.06 | Cost/Charges of glass fiber sleeve 2mm for repairing work ( 30 Nos. each Motor ) Total 02 Nos. DC Trip Motor. | 60 | Nos. | 10 ₹600 |
| 2.07 | Cost/Charges of Araidite 180ML pack for repairing work ( 10 Pkts each Motor ) Total 02 Nos. DC Trip Motor. | 20 | Pkts | 450 ₹9,000 |
| 2.08 | Cost/Charges of soldering material for repairing work ( 01 Job each Motor ) Total 02 Nos. DC Trip Motor. | 2 | job | 200 ₹400 |
Updated dates
Tender Value
₹1.9 L
EMD Value
₹2,500
Closing Date
6 Mar 2026, 11:00 amClosed
GM(EXCV)NCL, NIGAHI PROJECT
OFFICE OF GENERAL MANAGER (EXCV)NCL, NIGAHI PROJECT, PO-NIGAHI, DISTT-SINGRAULI (MP)
Repairing and Rewinding of 02 Nos. DC Trip Motors 2HP for BE-195 and Marion and 02 Nos. 1KVA CVT (Constant Voltage Transformer) for 182 Merion Shovels at Nigahi Project.
2026_NCL_353313_1
NGH/EXCV/TENDERS/25-26/093
Open Tender
Excavation Department Work
25 days
NCL NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹2,500
18 Apr 2026
16 Feb 2026
7 Mar 2026
16 Feb 2026
6 Mar 2026
17 Feb 2026
16 Feb 2026 - 23 Feb 2026
Scope of Work: Repairing and Rewinding of 02 Nos. DC Trip Motors 2HP for BE-195 & Marion and 02 Nos. 1KVA CVT (Constant Voltage Transformer) for 182 Merion Shovels at Nigahi Project. Maximum likely manpower to be deployed per shift: 03 Nos. ( 01 No. Skilled and 02nos semi-skilled).
Repairing and Rewinding of 02 Nos. DC Trip Motors 2HP Capacity :
Cost/Charges of Super Enameled copper wire SWG-22 for repairing of main pole and inter poles ( 17 Kg each Motor ). Total 02 Nos. DC Trip Motor.
Cost/Charges of Super Enameled copper wire SWG-16.5 for repairing of armature ( 13 Kg each Motor ). Total 02 Nos. DC Trip Motor.
Cost/Charges of Nomex paper 3mill for repairing work ( 1.5 Kg each Motor ) Total 02 Nos. DC Trip Motor.
Cost/Charges of glass tape 3/4inch x 50 mtr for repairing work ( 10 rolls each Motor) Total 02 Nos. DC Trip Motor.
Cost /Charges of glass fiber wedge for repairing work ( 24 Nos. each Motor ) Total 02 Nos. DC Trip Motor
Cost/Charges of glass fiber sleeve 2mm for repairing work ( 30 Nos. each Motor ) Total 02 Nos. DC Trip Motor.
Cost/Charges of Araidite 180ML pack for repairing work ( 10 Pkts each Motor ) Total 02 Nos. DC Trip Motor.
Cost/Charges of soldering material for repairing work ( 01 Job each Motor ) Total 02 Nos. DC Trip Motor.
Cost/Charges of Insulating varnish for repairing work ( 2 Ltrs. each Motor ) Total 02 Nos. DC Trip Motor.
Cost/Charges for repair of Commutotor assembly (1 job each Motor) Total 02 Nos. DC Trip Motor
Cost/Charges for armature balancing ( 1 job each Motor) Total 02 Nos. DC Trip Motor
Cost/Charges of HT bolt with washer M16 x 80mm for fitting in motor ( 10 Nos. each Motor) Total 02 Nos. DC Trip Motor.
Charges/cost for commutator turning and polising on Lathe machine ( 1 job each Motor) Total 02 Nos. DC Trip Motor
Charges/cost for bearing housing sheet repairing with sleeving ( 2 job each Motor) Total 02 Nos. DC Trip Motor
Cost/Charges for Heating ( 20 hrs. each Motor) Total 02 Nos. DC Trip Motor
Cost /Charges for repairing and rewinding of DC Trip Motor 2 HP DC Trip Motor including labour cost , contractor profit etc. ( required Skilled winder and Semi-skilled manpower to be deployed as per job requirement.) Total 02 Nos. DC Trip Motor
less of scrap material ( 30 kg each Motor ) Total 02 Nos. DC Trip Motor
Repairing and rewinding of 02 No. 1 KVA, Constant Voltage Transformer ( CVT) :
Cost of Super Enamelled copper wire 16.5 SWG ( 8.5 kg each Transformer ) for repairing work for 02 Nos. 1 KVA CVT Transformer.
Cost of Nomex paper 3 mil ( 0.5 kg each Transformer ) for repairing work for 02 Nos. 1 KVA CVT Transformer.
Charges for Core and coil removal and fitting by Hydraulic Press for 02 Nos. 1 KVA CVT Transformer. Job of 2 nos. CVT Transformer
Cost of soldering wire 60/40 16 SWG (0.5 kg each Transformer ) for repair work for 02 Nos. 1 KVA CVT Transformer.
Cost of Insulating varnish ( 1kg each Transformer ) for repairing work for 02 Nos. CVT Transformer.
Cost of Araldite ( 0.25 kg each Transformer ) for repair work for 02 Nos. CVT Transformer.
Cost of replacement of Capacitor (60 MFD, 380V) ( 02 Nos each Transformer ) fitment for 02 Nos. CVT Transformer.
Cost of DGC wire (8 sqmm) ( 10 mtrs. each Transformer ) for lead repair for 02 Nos. CVT Transformer.
Cost of Glass tape 3/4" x 50 Mtrs. Roll ( 05 roll each Transformer ) for repair work for 02 Nos. CVT Transformer.
Cost of HT bolts with washer ( 10 Nos. each Transformer ) replacement work for 02 Nos. CVT Transformer.
Heating charge of rewinded Transformer ( 20 Hrs. each Transformer ) for 02 Nos. 1 KVA CVT Transformer.
Labour Charges / Cost for repair rewinding of 02 Nos. 1 KVA Constant Voltage Transformer including contractor profit etc. ( required Skilled winder and Semi-skilled manpower to be deployed as per job requirement.) Job of o2 nos. CVT Trasformer repair work.
less of scrap material ( 8.5 kg each Transformer ) Total 02 Nos.CVT Transformer
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
techsummary_366099.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.94 MB
ANNEXURESANDOTHERIMPORTENTDOCUMENT.pdf
Tender Documents • 0.27 MB
UNDERTAKINGASPERANNEXURE-II.pdf
Tender Documents • 0.08 MB
BOQ_366099.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid