Cosntruction of Byepass Road on Mehatpur Parjian Road (with take of RD 5.00 Kms Near Gurdwara Bulandpuri) with 2.038 Km. Length in Distt. Jalandhar including 1 year defect liabiltity period and 4 year maintenance
2026_CEPW_166364_1
Bid no 25 Dt 03.03.2026 byepass road on Mehatpur
Open Tender
Civil Works - Roads
Percentage
180 days
JALANDHAR cantt
attached
12 documents required · 12 mandatory
₹20,000
Yes
₹6.9 L
Yes
17 Apr 2026
17 Apr 2026
1 May 2026
17 Apr 2026
1 May 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with good quality earth obtained from borrow pits including compensation of earth, loading, unloading, carriage to site of work, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per technical clause305 of MORT&H specifications | - | Cum | - | - |
| 2 | Granular Sub-Base (Table 400-1)
Construction of granular sub-base by providing material as per grading-III ( Table 400-I of MORT&H 5th revision), mixing in a mechanical mix plant at OMC, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORT&H specifications | - | Cum | - | - |
| 3 | Providing, laying, spreading and compacting stone aggregates of Grading I to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical specifications | - | Cum | - | - |
| 4 | Providing, laying, spreading and compacting stone aggregates of Grading II to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical specifications | - | Cum | - | - |
| 5 | Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications | - | Rmt | - | - |
| 6 | Providing and laying surface dressing in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG-10 @ 1kg per sqm laid on prepared surface after cleaning the road surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications | - | Sqm | - | - |
| 7 | Providing and applying tack coat with penetration grade bitumen VG-10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical specifications | - | Sqm | - | - |
| 8 | Dense Graded Bituminous Macadam 50mm to 75mm thickness (Grading II) Providing and laying dense graded bituminous macadam 50mm to 75mm thick with Continuous type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5%, laying with a Paver Finisher Mechanical to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 505 of MORT&H specifications
NOTES : -
(i) Job mix formula for the dense bituminous macadam shall be provided by the agency and shall be got approved from Punjab PWD, B&R Research Laboratory Patiala before adoption at site for execution..
(ii) The specification of this item for analytic purpose is kept with bitumen content @ 4.50% weight of mix variation as compared with job mix formula shall be paid / deducted accordingly. The limits of variation shall be worked out with the approved formula.
TECHNICAL NOTE : -
(i) Apart from the confirmity with the grading and quantity requirement of invidual ingredients exhibited above the mix aggregate i.e.coarse and fine aggregate for dense bituminous concrete shall meet all requirements set forth clause 505 of MORT & H specifications.
(ii) The final grading for the aggregates required for dense bituminous macadam confirming to table 500.10 of MORT & H specifications shall be determined after getting the dense bituminous macadam designed from Punjab PWD, B&R Research Laboratory Patiala after obtaining 60 % of material. The design mix so finally approved shall be termed as the approved mix. The aggregates shall be hydrophobic and of low porosity. The aggregates shall satisfy the physical requirement set fourth in table 500-6 (addendum to latest revision).
(iii) The approved mix shall exhibit the following details, source and location of all material: -
(a) Binder expressed as percentage by weight of total mix.
(b) Course expressed as percentage by weight of total mix.
(c) Crushed bajri expressed as percentage by weight of total mix.
(d) Fine aggregate expressed as percentage by weight of total mix
(e) A single definite percentage passing each sieve for mixed aggregates.
(f) Density of dense bituminous macadam after compaction will be not less than 2.30 gm/CC | - | Cum | - | - |
| 9 | Bituminous Concrete 30mm to 45mm thickness (Grading II) Providing and laying bituminous concrete 30mm to 45mm thick with continuous type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4%, carriage of mixed material to site of work, laying with paver finisher mechanical the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of MORT&H specifications
NOTES:-
(i) Job mix formula for the bituminous concrete shall be provided by the agency and shall be got approved from Punjab PWD, B&R Research laboratory Patiala before adoption at site for execution.
(ii) The specifications of this item for analytic purpose is kept with bitumen content @ 5.4% weight of mix variation as compared with job mix formula shall be paid/ deducted accordingly. The limits of variations shall be worked out with the approved formula.
TECHNICAL NOTE:-
i.) Apart from the conformity with the grading and quantity requirement of individual ingredients exhibited above the mix aggregate i.e. coarse and fine aggregate for bituminous concrete shall meet all requirements set forth clause 507 of MORT&H specifications.
ii.) The final grading for the aggregates required for bituminous concrete confirming to table 500.17 of MORT&H specifications shall be determined after getting the bituminous concrete designed from Punjab PWD, B&R Research Laboratory Patiala after obtaining 60% of material. The design mix so finally approved shall be termed as the approved mix. The aggregates shall be hydrophobic and of low porosity. The aggregates shall satisfy the physical requirement set forth in table 500-6 (addendum to latest revision).
iii.) The approved mix shall exhibit the following details, source and location of all material:-
(a) Binder expressed as percentage by weight of total mix.
(b) Course expressed as percentage by weight of total mix.
(c) Crushed bajri expressed as percentage by weight of total mix.
(d) Fine aggregate expressed as percentage by weight of total mix.
(e) A single definite percentage passing each sieve for mixed aggregates
(f) Density of bituminous concrete after compaction will be not less than 2.35 gm/CC. | - | Cum | - | - |
| 10 | CONSTRUCTION OF 5'-0" SPAN SLAB TYPE CULVERT COMPLETE | - | No. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
SBD.pdf
Tender Documents • 8.42 MB
BOQ_337577.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .