| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.6 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹28.0 Cr+₹45.3 L (1.65%)Rejected-Finance AT GIRISH TAKIES KALYANPUR DIST JAMUI PIN 811307 | JAMUI | BIHAR | 811307 | L2 | Rejected-Finance HIGHEST QUOTED RATE | |
| 3 | L3₹28.1 Cr+₹58.6 L (2.13%)Rejected-Finance | L3 | Rejected-Finance HIGHEST QUOTED RATE | |
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | SATISH KUMAR L2 | PREETI CONSTRUCTION & DEVELOPERS PVT LTD L1 | H N CHOUDHARY CONSTRUCTION PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing Road Land. (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.) SOR NO - 2.03 (i) A | 7.84 | Hec. | 93,366.97 ₹7,31,997.04 | 92,000 ₹7,21,280 Lowest | 93,809.47 ₹7,35,466.24 |
| 2.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 300 mm to 600 mm SOR NO - 2.01 (A+B) (i) | 27 | NO. | 646.4 ₹17,452.8 | 635 ₹17,145 Lowest | 649.46 ₹17,535.42 |
| 3.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 600 mm to 900 mm SOR NO - 2.01 (A+B) (i) | 45 | NO. | 976.41 ₹43,938.45 | 960 ₹43,200 Lowest | 981.14 ₹44,151.3 |
| 4.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth from 900 mm to 1800 mm SOR NO - 2.01 (A+B) (iii) | 89 | NO. | 1,513.71 ₹1,34,720.19 | 1,490 ₹1,32,610 Lowest | 1,520.89 ₹1,35,359.21 |
| 5.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth from 900 mm to 1800 mm SOR NO - 2.01 (A+B) (iii) | 21 | NO. | 2,683.6 ₹56,355.6 | 2,645 ₹55,545 Lowest | 2,696.32 ₹56,622.72 |
| 6.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) B) Cement Concrete Grade M-15 & M-20 SOR NO - 2.04 (I) B | 16.2 | cu.m | 477.28 ₹7,731.94 | 470 ₹7,614 Lowest | 479.54 ₹7,768.55 |
| 7.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) ii) (A) Dismantling Brick / Tile work in cement mortar SOR NO - 2.04 (II) B | 60.94 | cu.m | 935.79 ₹57,027.04 | 920 ₹56,064.8 Lowest | 940.22 ₹57,297.01 |
| 8.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) ii) (A) Dismantling Brick / Tile work in cement mortar SOR NO - 2.04 (III) B | 940.05 | cu.m | 302.05 ₹2,83,942.1 | 300 ₹2,82,015 Lowest | 303.48 ₹2,85,286.37 |
| 9.00 | Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works. (c) Above 900 mm SOR NO - 2.04(ix) A | 22.5 | m | 731.85 ₹16,466.63 | 720 ₹16,200 Lowest | 735.32 ₹16,544.7 |
| 10.00 | Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately) SOR NO - 2.06 | 108 | cu.m | 466.94 ₹50,429.52 | 460 ₹49,680 Lowest | 469.16 ₹50,669.28 |
Tender Value
₹26.5 Cr
EMD Value
₹26.6 L
Closing Date
9 Mar 2026, 12:00 pmClosed
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, DUMKA
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, DUMKA
Widening and Strengthening/Reconstruction of Barmasia PWD Road to Saharghati Road (Total Length-8.130 Km) under Road Division Dumka for the year 2025-26.
2026_CECOM_110207_1
RCD/DUMKA/27
Open Tender
Civil Works
Item Rate
210 days
DUMKA
AS PER SBD
3 documents required · 3 mandatory
₹10,000
₹26.6 L
CE COMM RCD JHARKHAND RANCHI
9 May 2026
11 Feb 2026
10 Mar 2026
11 Feb 2026
9 Mar 2026
17 Feb 2026
16 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land. (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.) SOR NO - 2.03 (i) A | 7.84 | Hec. | - | - |
| 2 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 300 mm to 600 mm SOR NO - 2.01 (A+B) (i) | 27 | NO. | - | - |
| 3 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 600 mm to 900 mm SOR NO - 2.01 (A+B) (i) | 45 | NO. | - | - |
| 4 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth from 900 mm to 1800 mm SOR NO - 2.01 (A+B) (iii) | 89 | NO. | - | - |
| 5 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth from 900 mm to 1800 mm SOR NO - 2.01 (A+B) (iii) | 21 | NO. | - | - |
| 6 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) B) Cement Concrete Grade M-15 & M-20 SOR NO - 2.04 (I) B | 16.2 | cu.m | - | - |
| 7 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) ii) (A) Dismantling Brick / Tile work in cement mortar SOR NO - 2.04 (II) B | 60.94 | cu.m | - | - |
| 8 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) ii) (A) Dismantling Brick / Tile work in cement mortar SOR NO - 2.04 (III) B | 940.05 | cu.m | - | - |
| 9 | Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works. (c) Above 900 mm SOR NO - 2.04(ix) A | 22.5 | m | - | - |
| 10 | Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately) SOR NO - 2.06 | 108 | cu.m | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_148999.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 5.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .