| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.5 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹28.8 L+₹5.4 L (22.9%)Rejected-AOC | 2 | Rejected-AOC Reject | |
| 3 | 3₹32.0 L+₹8.6 L (36.5%)Rejected-AOC VILLAGE P O BARIN MANDIR TEHSIL TOUNI DEVI DISTT HAMIRPUR H P | 3 | Rejected-AOC Reject | |
| 4 | 4₹32.5 L+₹9.0 L (38.6%)Rejected-AOC | 4 | Rejected-AOC Reject | |
| 5 | 5₹34.8 L+₹11.3 L (48.3%)Rejected-AOC | 5 | Rejected-AOC Reject |
Tender Value
₹27.5 L
EMD Value
₹48,700
Closing Date
30 Nov 2019, 6:00 pmClosed
Executive Engineer
Kumarsain Division HPPWD Kumarsain
C/O Kachinghatti Aur Galani Kalmu road Km.0/0 to 2/300 SH Formation Cutting in Km 1/000 to 2/300 C/O PCC R/Wal and B/Wall and C/O 90mm dia Hume Pipe Culvert at various Rd
2019_PWD_32671_1
PW-KMS-AB-NIT/2019-7939-40 dt.07.11.2019
Open Tender
Civil Works
Item Rate
180 days
Kumarsain
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
EE Kumarsain
₹48,700
30 Sept 2020
18 Nov 2019
2 Dec 2019
18 Nov 2019
30 Nov 2019
18 Nov 2019
Amount
5/7 meters wide (5 meters wide in straigth and 7 meters on curves) Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposal of excavated earth in all height and depths in all kinds of soil, including saturated soil comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock where blasting is prohibited and their intermediate classification of soils including dewatering wherever required, setting out true to the required lines, grades, side, slopes, trimming of bottom and levels as shown on the drawing and as directed by the Engineer.-in Charge. at site according to the HP.PWD specification of 1990 volume-I and sorting out useful and un-useful material and stacking the same in all leads and lifts and transportation of the un serviceable materials for filling in roadways, embankment s for grade improvement and leveling to required grades and then disposing of all surplus excavated materials in acquired width of the road or on approved dumping site /sites through all labours machineries materials, tools, equipments and safety measures and other incidental necessary to complete the work by mechanical means and or labour if any required .All usefull materials, such as stone shingles, aggregates and slates etc. shall be sorted out and stacked along road side which shall not be less than one third blasting work(hard rock) one sixth of blasting work(soft rock) or 1150.02cum. which ever is higher in all cases failing which recovery @ Rs.170/- per cubic metre shall be effected. Any loss to the Public and Private property during the course of execution and disposal of serviceable/un-serviceable materials shall be the absolute responsibility of the Contractor which shall have to be duly compensated to the full extent him in all respect and in all cases.
Earth work in excavation for structures by manual means in all depths as per drawing and Technical specifications Clause 305.1 incuding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal in all leads and lifts incuding dressing of sides and bottom and back filling in trenches with excavated suitable material, all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil errosion, damage to hill side, water pollution etc., and to protect stability of hill side. Rock shall be excavated with chiselling & wedging out of rock (where blasting is prohibited) as directed by the Engineer-in-Charge, all useful material such as stones, singles, aggregates and slates etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property during the course execution shall be the absolute responsiblity of the contractor which shall have to the dully compensated by him in all cases.
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203) P.C.C nominal mix 1:5:10 (40mm aggregates) including carriage of materials through all modes of transportation with in all leads and lifts as per direction of Engineer-in-Charge.
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 P.C.C nominal mix 1:4:8 (40mm aggregates) including entire carriage of materials in all leads and lifts.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802,803,1202 & 1203 P.C.C. grade M 10 nominal mix 1:3:6 (1 cement :3 sand : 6 graded stone aggregate 25mm nominal sze) mechanical mixed and compacted the concrete with vibrator and curing complete including carriage of materials through all modes of transportations with in all leads and lifts and as per HP.PWD., specifications of 1990 volume-1 and as per direction of Engineer-in-Charge
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonry work in head walls and parapets clause 1108, 900mm including entire carriage of materials in all leads and lifts.
Providing weapholes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm dia PVC pie extending through the full with of the structures with slop of 1 (v):20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7 incuding carriage of materials through all modes of transportation with in all leads and lifts and as per direction of Engineer-in-Charge.
Back filling behind retaining wall/breast wall incuding carriage of materials through all modes of transportation with in all leads and lifts and as per direction of Engineer-in-Charge.
LOK CHAND
Anil Chauhan
MITLESH BISHT
parveen
M/s Pardeep Sublaik
HAKEEM CHAND CONTRACTOR
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .