Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | ₹1.8 L | L1 | Accepted-Finance BQR Conditions Satisfied |
| 2 | L2₹2.2 LAccepted-Finance 22A SOUTH BEACH ROAD TUTICORIN 01 | ₹2.2 L | L2 | Accepted-Finance BQR Conditions Satisfied |
| Sl No | Description | Qty | Unit | VEL ENGINEERING | SNS MECHATRONICS |
|---|---|---|---|---|---|
| 1.00 | Material Cost (Contractor Scope)
Ratchet Housing Storm Water Pump motor Model: BHR42-18 DEG- 4 | 2 | No. | 1,42,120 ₹1.7 L | 1,67,960 ₹2.0 L |
| 2.00 | Ratchet Pin Material: AISI-410(Storm water pump motor at Storm water pump house -I) | 20 | No. | 39,300 ₹46,374 | 46,400 ₹54,752 |
| 3.00 | Transporting charges | 1 | Ls. | 990 ₹1,168.20 | 1,170 ₹1,380.60 |
Tender Value
Refer Docs
EMD Value
₹1,800
Closing Date
4 Mar 2026, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle CAD Fabrication of oil chamber cover in 55 KW jyoti make storm water pump Motor Ratchet housing for oil chamber at storm water pump house unit I, II and III
2026_EB_660149_1
CE/SE/O/TTPS/Spec.No.306/25-26
Open Tender
Miscellaneous Works
30 days
TTPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1,800
Yes
6 Mar 2026
18 Feb 2026
5 Mar 2026
18 Feb 2026
4 Mar 2026
18 Feb 2026
Material Cost (Contractor Scope) Ratchet Housing Storm Water Pump motor Model: BHR42-18 DEG- 4
Ratchet Pin Material: AISI-410(Storm water pump motor at Storm water pump house -I)
Transporting charges
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_792074.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid