Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹54.7 LAccepted-AOC | ₹54.7 L | 1 | Accepted-AOC 1 |
| 2 | 2₹61.7 LRejected-Finance 383 TURKMANPUR BEHIND RAWAT PATHSHALA JAYNAGAR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹61.7 L | 2 | Rejected-Finance 2 |
| 3 | 2₹61.7 LRejected-Finance | ₹61.7 L | 2 | Rejected-Finance 2 |
| 4 | 3₹63.6 LRejected-Finance SOHGAURA CHAUK BAZAR MAHARAJGANJ UTTAR PRADESH | MAHARAJGANJ | MAHARAJGANJ | UTTAR PRADESH | ₹63.6 L | 3 | Rejected-Finance 3 |
| 5 | 4₹64.3 LRejected-Finance GRAM KHEMPIPRA POST SAVAREJI THANA KOTWALI JANPAD MAHARAJGANJ UTTAR PRADESH | MAHARAJGANJ | MAHARAJGANJ | UTTAR PRADESH | ₹64.3 L | 4 | Rejected-Finance 4 |
Tender Value
₹90.9 L
EMD Value
₹6.5 L
Closing Date
30 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Construction of Kevlapur Khurd me Jinwa tola link road under CM Gram Yojana Year 2025-26 in District Mahrajganj 5 Year Maintenance Lot No-05 of 05
2026_CEGKP_1128897_5
2183/33Com-Gkp Circle/2026 Dated 20-03-2026
Open Tender
Civil Works
180 days
Mahrajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.5 L
26 May 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Construction of Embankment with approved Material Obtained from Borrow Pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 As per MORD Specification & Sr. No. 301.5, 3.4 complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) | ||||||
| 2Granular Sub-base with Well Graded Material (Table 400.1) (A)By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete. As per MORD Specification & Sr. No. 401, 4.1(A)(i) for Grading-I Material, complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) | ||||||
| 3WBM Grading-2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2. As per MORD Specification & Sr. No. 405, 4.7(2)(A) By Manual Means, complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) | ||||||
| 4WBM Grading-3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3. As per MORD Specification & Sr. No. 405(A), 4.7(3)(A) By Manual Means, complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) | ||||||
| 5Brick edging on both sides of the road of first class bricks 8cm. (3") wide and 12cm. (4.5") deep laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing ramming the excavated earth. As per PWD Specification & S.I.No. 765. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) | ||||||
| 6Prime Coat Providing and applying primer coat with Emulsion Himcole SS-1 Bulk on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per MORD Specification & Sr. No. 502, 5.1(i) complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Emulsion but GST will be paid extra as applicable) | ||||||
| 7Tack Coat Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom, as per MORD Sr. No. 5.2(ii) and Technical Specification Clause 503 Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) | ||||||
| 820mm. Thick open-graded premix carpet 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per MORD Sr.No. 5.9 Case I(I) and Technical Specification & Sr. 508. Case - I By Manual Means (I) Bitumen (S-90) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) | ||||||
| 9Seal Coat Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per MORD Sr.No. 5.12 By Manual Case-III-Type c(I) and Technical Specification & Sr. 510 A. By Manual Means Bitumen (S-90) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) | ||||||
| 10Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2. As per MORD Specification & Sr. No. 301.1, 3.14 complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) | ||||||
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.78 MB
T22183.pdf
Tender Documents • 0.66 MB
BOQ_2105630.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid