Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
25 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
5 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As detailed in Para 10.2 of Tender Form (Second sheet) of Part 1 of attached GCC-2022.
The tenderer shall submit certificates regarding status of firm i.e. sole proprietorship, partnership, Company, Society/Trust etc. and should submit supporting documents e.g. notarized affidavit, MOA/AOA, Certificate of Incorporation, Partnership deed, power of attorney etc. (as applicable) to comply Para no. 10, 14, 15, 16 & 18 of Tender Form (Second Sheet) of Part I of attached GCC-2022.
The contractor should have a valid Electrical contractor license issued by Govt. and submit along with tender documents. If tenderer fails to submit a valid electrical contractor license, then offer from the tenderer will be summarily rejected.
14 conditions
Tender document and all the uploaded supporting documents must be digitally signed by the authorized signatory for tender, in token of their acceptance.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
OHE work in c/w proposed extension of L-4 as common long loop at ARNA yard in BKI-JP Section of Jaipur Division.
EL-TRD-JP-2026-27-02R~NWR
EL-TRD-JP-2026-27-02R
Open
Works - General
12 Months
Jaipur, Rajasthan
₹0
₹2.7 L
3 Nov 2026
3 Nov 2026
11 Nov 2026
18 items across 1 schedule · ₹4,06,487.98 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Erection, testing & commissioning ofrolled or fabricated and galvanized steelfor traction mast, TTC, Portals (boom &uprights), AT masts, feeder mast, supermasts,bridge masts, steel gantries,supporting structures, Drop arm, SPS etc | MT | 8.00 | 9,841.54 | 78,732.32 |
| 2 | Erection, testing & commissioning ofmaterial for complete Guy rod assemblyas per latest RDSO drg., spec &explanatory notes | Numbers | 3.00 | 1,689.2 | 5,067.6 |
| 3 | Erection, testing & commissioning ofmaterial for complete Single bracketassembly including ST, BT Insulators asper latest RDSO drg., spec &explanatory notes | Numbers | 25.00 | 2,406.42 | 60,160.5 |
| 4 | Erection, testing & commissioning ofmaterial for complete regulatedequipment (3 pulley type) with counterweight assembly for Regulated OHEtension as per latest RDSO drg., spec &explanatory notes | Numbers | 3.00 | 7,072.31 | 21,216.93 |
| 5 | Erection, testing & commissioning ofmaterial for complete termination ofSingle/ Double conductor of overheadequipment with 9-ton insulators as perlatest RDSO drg., spec & explanatorynotes | Numbers | 3.00 | 2,707.03 | 8,121.09 |
| 6 | Erection, testing & commissioning ofmaterial for complete anti creep withgalvanized steel wire including cut-ininsulators and complete termination asper latest RDSO drg., spec &explanatory notes. | Numbers | 1.00 | 4,611.29 | 4,611.29 |
| 7 | Erection, testing & commissioning ofmaterial for overhead equipment withcomplete fitting. (With Contact &catenary wire) | Kilometre | 1.00 | 56,681.57 | 56,681.57 |
| 8 | Erection, testing & commissioning ofmaterial for New dropper and readjustmentof dropper | Each Span | 18.00 | 539.02 | 9,702.36 |
| 9 | Erection, testing & commissioning ofmaterial complete for section insulatorassembly as per latest RDSO drg., spec& explanatory notes | Numbers | 1.00 | 4,744.85 | 4,744.85 |
| 10 | Erection, testing & commissioning ofmaterial complete for single pole isolatorwithout earth assembly with postinsulators as per latest RDSO drg., spec& explanatory notes | Numbers | 1.00 | 4,677.82 | 4,677.82 |
| 11 | Erection, testing & commissioning ofmaterial complete for solid core cut ininsulator | Numbers | 1.00 | 902.26 | 902.26 |
| 12 | Dismantling of existing complete anticreepassemblies with anti-creep wire,insulators, adjusters etc. andtransportation to TRD Depot | Numbers | 1.00 | 2,013.63 | 2,013.63 |
| 13 | Dismantling of existing cantileverassembly | Numbers | 34.00 | 1,499.35 | 50,977.9 |
| 14 | Dismantling of ATD (Regulatingequipment) with counter weights. | Numbers | 5.00 | 7,789.65 | 38,948.25 |
| 15 | Dismantling of guy rod withtermination. | Numbers | 6.00 | 1,264.31 | 7,585.86 |
| 16 | Dismantling of Portal, fabricated steelother than Mast/Upright | MT | 2.00 | 9,987.18 | 19,974.36 |
| 17 | Dismantling of Mast / Upright by gascutting | Numbers | 21.00 | 1,358.03 | 28,518.63 |
| 18 | Dismantling & removal of isolatorcomplete | Numbers | 1.00 | 3,850.76 | 3,850.76 |
| Schedule total | ₹4,06,487.98 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
2026-04-24SpecialconditionofcontractARNAlongloop.pdf
ATTACHMENT
WorksGCC2022.pdf
ATTACHMENT
ACSofGCCupto11.pdf
ATTACHMENT
2026_08_12IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_12_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .