Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Finance | ₹8.8 L | L1 | Admitted-Finance |
| 2 | L2₹8.8 L+₹1,248.44 (0.14%)Admitted-Finance 01 AGNI AUTOMATION AND SECURITY 01 KUNDAN BHAWAN SHIVAM VIHAR COLONY OPP KIET ENGG COLLEGE MURADNAGAR GHAZIABAD 201206 U P INDIA MURADNAGAR | GHAZIABAD | UTTAR PRADESH | 201206 | ₹8.8 L+₹1,248.44 (0.14%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K.L Enterprises L1 | AGNI AUTOMATION AND SECURITY L2 |
|---|---|---|---|---|---|
| 1.01 | Making of all safety arrangements i.e safety belt, gum boots, helmet, gloves etc to carry out the work.65+4op | 1 | Job | 4,400 ₹5,192 Lowest | 4,450 ₹5,251 |
| 1.02 | Work of Opening/Disconnection of the main incoming LT power supply from the LT panel , racking out the breaker to ensure the power is disconnected from all sources connected to FCMA Soft Starter Panels & arrangement of safety helmet etc to start the work in complete shut down condition. | 2 | Job | 18,500 ₹21,830 Lowest | 18,600 ₹21,948 |
| 1.03 | Rectification of wiring by replacement of faulty wires as per drawing of the panel & ensuring that the control circuit of the Starter Panel is working properly and Panel lights are giving signal as per drawing of the panel work includes tightness of all connections. | 2 | Job | 36,900 ₹43,542 | 36,888 ₹43,527.84 Lowest |
| 1.04 | Rectification of wiring of the Power circuit , connection of taps , incoming and outgoing of the Starter Panel & tightness of all connections by repir /replacement of faulty copper taps and wire. | 2 | Job | 50,000 ₹59,000 Lowest | 50,100 ₹59,118 |
| 1.05 | Supply and installation of main By Pass contactor of 110 Amp , Coil voltage 240 V AC with 2 NO + 2 NC work includes the dismantling of old contactor along with opening of incoming & outgoing connection of cable/busbar and opening the connection of Aux Block and tripping etc. | 2 | Job | 84,600 ₹99,828 Lowest | 84,700 ₹99,946 |
| 1.06 | Supply and installation of main incoming contactor 3TF52 motor starters - contactors, Coil voltage 240 V AC with 2 NO + 2 NC Conforms to IEC 60946 work includes the dismantling of old contactor along with opening of incoming & outgoing connection of cable/busbar and opening the connection of Aux Block and tripping etc. | 2 | Job | 1,34,000 ₹1,58,120 Lowest | 1,34,200 ₹1,58,356 |
| 1.07 | Work of providing and fixing of 3 pole MCCB 250 Amp rating as per OEM drawing & work includes dismantling of old MCCB along with opening of incoming & outgoing connection of cable/busbar and opening the connection of Aux Block and tripping etc. | 2 | Job | 76,600 ₹90,388 Lowest | 76,700 ₹90,506 |
| 1.08 | Providing and fixing of motor protection relay with connection of tripping terminal and adjustment of current for tripping. | 2 | Job | 44,800 ₹52,864 Lowest | 44,900 ₹52,982 |
| 1.09 | Manual functional testing of the Panel along by directly giving command from the terminal blocks with all required tools, manpower etc. | 2 | Job | 29,400 ₹34,692 Lowest | 29,500 ₹34,810 |
| 1.10 | Work of checking the current at Starting time and adjustment as per site requirement & as required by FCMA starter along with all required tools. | 2 | Job | 18,680 ₹22,042.4 | 18,600 ₹21,948 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,700
Closing Date
12 Aug 2026, 3:00 pmClosed
EE(SDW)VI
Delhi Jal board WSTP Keshopur
Servicing and maintenance of Innovative make FCMA based Soft Starter Set No-05 and 06 installed at Jeevan Park SPS
2026_DJB_296528_1
NIT NO. 10 (2026-2027) EE(SDW)VI
Open Tender
Miscellaneous Works
Works
60 days
Delhi Jal board WSTP Keshopur
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
As per NIT
₹17,700
Yes
25 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Making of all safety arrangements i.e safety belt, gum boots, helmet, gloves etc to carry out the work.65+4op | 1 | Job | - | - |
| 1.02 | Work of Opening/Disconnection of the main incoming LT power supply from the LT panel , racking out the breaker to ensure the power is disconnected from all sources connected to FCMA Soft Starter Panels & arrangement of safety helmet etc to start the work in complete shut down condition. | 2 | Job | - | - |
| 1.03 | Rectification of wiring by replacement of faulty wires as per drawing of the panel & ensuring that the control circuit of the Starter Panel is working properly and Panel lights are giving signal as per drawing of the panel work includes tightness of all connections. | 2 | Job | - | - |
| 1.04 | Rectification of wiring of the Power circuit , connection of taps , incoming and outgoing of the Starter Panel & tightness of all connections by repir /replacement of faulty copper taps and wire. | 2 | Job | - | - |
| 1.05 | Supply and installation of main By Pass contactor of 110 Amp , Coil voltage 240 V AC with 2 NO + 2 NC work includes the dismantling of old contactor along with opening of incoming & outgoing connection of cable/busbar and opening the connection of Aux Block and tripping etc. | 2 | Job | - | - |
| 1.06 | Supply and installation of main incoming contactor 3TF52 motor starters - contactors, Coil voltage 240 V AC with 2 NO + 2 NC Conforms to IEC 60946 work includes the dismantling of old contactor along with opening of incoming & outgoing connection of cable/busbar and opening the connection of Aux Block and tripping etc. | 2 | Job | - | - |
| 1.07 | Work of providing and fixing of 3 pole MCCB 250 Amp rating as per OEM drawing & work includes dismantling of old MCCB along with opening of incoming & outgoing connection of cable/busbar and opening the connection of Aux Block and tripping etc. | 2 | Job | - | - |
| 1.08 | Providing and fixing of motor protection relay with connection of tripping terminal and adjustment of current for tripping. | 2 | Job | - | - |
| 1.09 | Manual functional testing of the Panel along by directly giving command from the terminal blocks with all required tools, manpower etc. | 2 | Job | - | - |
| 1.1 | Work of checking the current at Starting time and adjustment as per site requirement & as required by FCMA starter along with all required tools. | 2 | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_394733.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .