| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹31.9 LAccepted-AOC | 1 | Accepted-AOC L1 Accepted | |
| 2 | 2₹33.4 L+₹1.5 L (4.66%)Rejected-Finance | 2 | Rejected-Finance L2 Rejected |
| Sl No | Description | Qty | Unit | K MANIKANDAN L1 | M SANTHI L2 |
|---|---|---|---|---|---|
| 1.10Package No. 38 Upgradation / Strengthening of 2 No.of roads | |||||
| 1.20Renewal Road from Karur Melakottai via- Thiruvirunthanvayal Periyakottur Road KM 0/0-0/700 in Karur Panchayat. | |||||
| 1.30Advance patchwork to an average thickness upto 50mm using premixed 45mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501. | |||||
| 1.40 | KM 0/0-0/700 | 7.75 | Cum | 4,787.61 ₹37,103.98 Lowest | 5,000 ₹38,750 |
| 1.50Advance patchwork to an average thickness upto 25mm using premixed 13.2mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501. | |||||
| 1.60 | KM 0/0-0/700 | 2.3 | Sqm | 5,338.11 ₹12,277.65 Lowest | 5,800 ₹13,340 |
| 1.70Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | |||||
| 1.80 | KM 0/0-0/700 | 2,625 | Sqm | 19.42 ₹50,977.5 Lowest | 35 ₹91,875 |
| 1.90BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | |||||
| 2.00 | KM 0/0-0/700 | 65.63 | Sqm | 11,797.2 ₹7,74,250.24 Lowest | 13,000 ₹8,53,190 |
Tender Value
₹37.7 L
EMD Value
₹38,000
Closing Date
26 May 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (DEVELOPMENT)
DRDA PUDUKKOTTAI
Package No. 38 Upgradation / Strengthening of 2 No.of roads Under MGSMT-2025-26 (Phase-II) in Avudaiyarkoil Panchayat Union, Pudukkottai District
2025_RDTN_553896_1
PDKT/MGSMT2025-26/AVKL38
Open Tender
Civil Works - Roads
Item Rate
180 days
Avudaiyarkoil
Pls Refer Tender Documents
4 documents required · 4 mandatory
₹0
₹38,000
DRDA PUDUKKOTTAI
7 Aug 2025
3 May 2025
26 May 2025
3 May 2025
26 May 2025
3 May 2025
13 May 2025
Amount
Package No. 38 Upgradation / Strengthening of 2 No.of roads
Renewal Road from Karur Melakottai via- Thiruvirunthanvayal Periyakottur Road KM 0/0-0/700 in Karur Panchayat.
Advance patchwork to an average thickness upto 50mm using premixed 45mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501.
Advance patchwork to an average thickness upto 25mm using premixed 13.2mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Hectameterstone
Provision for Kilometerstone
Provision for Name Board cum Citizen Board
Renewal Road from Karur Kannangudi Road KM 0/0-1/450 in Karur Panchayat.
Advance patchwork to an average thickness upto 50mm using premixed 45mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501.
Advance patchwork to an average thickness upto 25mm using premixed 13.2mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of Bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved sources to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable, which will be supplied by department as specified in the special condition appended including cost and conveyance of 60/70 grade bitumen to work site and all incidental charges such as storage, handling charges etc, including heating the Bitumen for Premixing all labour charges and T & P charges for patching the surface and all other incidental charges etc complete as per M.O.R.T.H specification No 501.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Hectameterstone
Provision for Kilometerstone
Provision for Name Board cum Citizen Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M SANTHI (BID ID -1349013)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .