Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.2 L+₹20,001.60 (4.99%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.5 L+₹45,228.84 (11.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.5 L+₹50,034.03 (12.5%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.6 L+₹56,581.09 (14.1%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
5 Oct 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_326329_3
e-NIT No. 197 REW UDHAMPUR of 2026-27 Dated 28-09-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹12,000
6 Oct 2026
29 Sept 2026
6 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part 1 Provision for Sign Board (To be paid as per actual) | 1 | no | 2,000 | ₹2,000 |
| 2 | Earth work in trench excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 75.72 | cum | 256.95 | ₹19,456.25 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level,Including all lead and lift. | 3.24 | cum | 4,826.5 | ₹15,637.86 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% plum. | 19.44 | cum | 4,774.47 | ₹92,815.7 |
| 5 | Cetring and shuttering including strutting, propping etc and removal of the formwork. For foundation | 16.2 | sqm | 286.35 | ₹4,638.87 |
| 6 | Hand packing stones in wire crates including cost of wire crates and binding of crates | 120.96 | cum | 1,649.86 | ₹1,99,567.07 |
| 7 | Providing and Laying river bed material not exceeding 20 cmm in depth | 292 | cum | 650 | ₹1,89,800 |
| 8 | Carrige of sand 60 km by MT | 8.83 | cum | 851.54 | ₹7,519.1 |
| 9 | Carrige of aggregate 1 km by MT | 308 | cum | 128.75 | ₹39,655 |
| 10 | Carriage of stone 100mtr by AT | 102.82 | cum | 287.48 | ₹29,558.69 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_1103566.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .