| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC Out of Two tenders received, The Lowest Rate Quoted by Thiru. S. Natarajan, Contractor, Pasupathikovil at 0.14 percentage Less Estimate may be approved. |
| 2 | L2₹3.0 LRejected-Finance | ₹3.0 L | L2 | Rejected-Finance Above Rate Quoted |
| Sl No | Description | Qty | Unit | S.NATARAJAN L1 | KANDASAMY THIRUNEELAKANDAN L2 |
|---|---|---|---|---|---|
| 1.00Construction of BG Shed @ Vaiyacheri AD Street in Vaiyacheri Panchayat | |||||
| 2.00 | Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 11.12 | Cu.m | 263.7 ₹2,932.34 | 263.7 ₹2,932.34 |
| 3.00 | Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications | 1.85 | Cu.m | 2,295.7 ₹4,247.05 | 2,400 ₹4,440 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 1.08 | Cu.m | 6,228 ₹6,726.24 | 6,400 ₹6,912 |
| 5.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4"and conveyance of all materials to site and all labour charges etc complete | 2.63 | Cu.m | 6,313.7 ₹16,605.03 | 6,500 ₹17,095 |
| 6.00 | Supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 557.59 | Kg | 91.5 ₹51,019.49 | 91.5 ₹51,019.49 |
| 7.00 | Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etccomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete.. | 47.04 | Sq.m | 1,095 ₹51,508.80 | 1,095 ₹51,508.80 |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum | 6.33 | Sq.m | 10,163.7 ₹64,336.22 | 12,000 ₹75,960 |
| 9.00 | Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc | 20.67 | Sq.m | 293.4 ₹6,064.58 | 293.4 ₹6,064.58 |
| 10.00 | Plastering with cement mortar 1:3 mix to 10 mm thick includingcost and conveyance of all materials to site and all labourcharges etc complete for 10 Sqm | 62.04 | Sq.m | 334.2 ₹20,733.77 | 334.2 ₹20,733.77 |
Tender Value
₹3.1 L
EMD Value
₹3,100
Closing Date
23 Dec 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (B.PT)
Panchayat Union office , Ammapettai.
4.Construction of BG Shed at Vaiyacheri AD Street in Vaiyacheri Panchayat of Ammapettai Block under PMAGY 2025-2026-Tranche.
2025_RDTN_632543_4
1500/2025/A2 Dt 10.12.2025
Open Tender
Civil Works
Panchayat Union office, Ammapettai.
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹3,100
17 Feb 2026
15 Dec 2025
23 Dec 2025
15 Dec 2025
23 Dec 2025
15 Dec 2025
Earth work excavation and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4"and conveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etccomplete complying with standard specifications and as directed by departmentalofficers including conveyance of all materials to site and proper centering etc complete..
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum
Plastering with cement mortar 1:5 mix to 12mm thick includingcost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10 mm thick includingcost and conveyance of all materials to site and all labourcharges etc complete for 10 Sqm
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
TechnicalbitV2.pdf
Tender Documents • 0.97 MB
PriceBitV2.pdf
Tender Documents • 0.62 MB
BOQ_756787.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid