Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 CrAdmitted-Finance THALIYAPATTY VELLIYANAI POST KARUR 639 118 | KARUR | TAMIL NADU | 639118 | L1 | Admitted-Finance | |
| 2 | L2₹14.3 Cr+₹81,621.44 (0.06%)Admitted-Finance ARUVANKATTUR KOOLTHAMPALAYAM POST KONGANAPURAM SANKARI TALUK SALEM 637102 | SALEM | SALEM | TAMIL NADU | 637102 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical PASUR ERODE | PASUR | ERODE | TAMIL NADU | - | Rejected-Technical Your Bid was rejected due to not satisfied in our Eligible criteria | |
| 4 | Rejected-Technical | - | Rejected-Technical Original EMD Not Enclosed |
| Sl No | Description | Qty | Unit | K.P.RANGARAJU L2 | SAKTHI ENGINEERING CONTRACTORS L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Light jungle in working spot as directed by the Departmental officers. At park area | 9,000 | Sqm | 5.5 ₹49,500 | 5 ₹45,000 Lowest |
| 1.10Dismantling clearing away and carefully stacking materials useful for re-use for any thickness of walls | |||||
| 1.20 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick / Stone Masonry in lime mortar walls under 3m high | 13.01 | Cum | 209.5 ₹2,725.6 | 209 ₹2,719.09 Lowest |
| 1.30 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Dismantling PCC | 8 | Cum | 439 ₹3,512 Lowest | 439 ₹3,512 Lowest |
| 1.40 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Removal of Cut Stone Slabs / RCC Cover Slab | 8 | Cum | 464 ₹3,712 Lowest | 464 ₹3,712 Lowest |
| 1.50 | Earth work in all soil except hard rock requiring blasting and conveying for Desilting and formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching ,formation of bund, breaking clods,sectioning etc., complete DATA 1 (lead of 5 KM) | 1,73,239.99 | Cum | 102 ₹1,76,70,478.98 | 101 ₹1,74,97,238.99 Lowest |
| 1.60 | HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B | 40,656.53 | Cum | 115 ₹46,75,500.95 | 111 ₹45,12,874.83 Lowest |
| 1.70Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete | |||||
| 1.80 | having width up to 3m | 1,143 | Cum | 32 ₹36,576 | 31 ₹35,433 Lowest |
| 1.90 | having width of 3m -10m | 3,602.1 | Cum | 40 ₹1,44,084 | 39 ₹1,40,481.9 Lowest |
Tender Value
₹19 Cr
EMD Value
₹19 L
Closing Date
11 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commissioner
Salem City Municipal Corporation, Fort Main road, Salem
REJUVENATION AND REDEVELOPMENT OF BODINAYAKANPATTI LAKE IN SALEM CORPORATION
2023_MAWS_298609_1
E2/10910/2021(Bodinayakanpatty Lake)
Open Tender
Civil Works
Lump-sum
548 days
Salem City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹19 L
Yes
30 May 2023
31 Mar 2023
12 May 2023
31 Mar 2023
11 May 2023
31 Mar 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing the Light jungle in working spot as directed by the Departmental officers. At park area | 9,000 | Sqm | - | - |
| 1.1 | Dismantling clearing away and carefully stacking materials useful for re-use for any thickness of walls | - | - | - | - |
| 1.2 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick / Stone Masonry in lime mortar walls under 3m high | 13.01 | Cum | - | - |
| 1.3 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Dismantling PCC | 8 | Cum | - | - |
| 1.4 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Removal of Cut Stone Slabs / RCC Cover Slab | 8 | Cum | - | - |
| 1.5 | Earth work in all soil except hard rock requiring blasting and conveying for Desilting and formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching ,formation of bund, breaking clods,sectioning etc., complete DATA 1 (lead of 5 KM) | 1,73,239.99 | Cum | - | - |
| 1.6 | HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B | 40,656.53 | Cum | - | - |
| 1.7 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete | - | - | - | - |
| 1.8 | having width up to 3m | 1,143 | Cum | - | - |
| 1.9 | having width of 3m -10m | 3,602.1 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
Tendernotice_2.pdf
PDF • 2.24 MB
BOQ_354362.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .