Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-AOC VILL P O CHINCHURIA DIST PASCHIM BARDHAMAN PIN 713378 W B | CHINCHURIA | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | ₹1.8 L | 1 | Accepted-AOC Eligible L-1 bidder. |
| 2 | 2₹1.8 L+₹3,658 (2.02%)Rejected-Finance HARIPUR COLLIERY P O HARIPUR DIST PASCHIM BARDHAMAN PIN 713378 W B | HARIPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | ₹1.8 L+₹3,658 (2.02%) | 2 | Rejected-Finance Quoted more than L--1 bidder. |
| 3 | Rejected-Technical VILL CHINCHURIA PO CHINCHURIA JAMURIA PASCHIM BARDHAMAN WB 713378 | JAMURIA | PASCHIM BARDHAMAN | WB | 713378 | - | - | Rejected-Technical Technically not eligible |
| Sl No | Description | Qty | Unit | CHAKRABORTY AND COMPANY L1 | SANJAY YADAV L2 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 1.01Material Cost | |||||
| 1.02 | Supply of bearing NU 220-C3 | 2 | no. | 30,500 ₹61,000 Lowest | 31,500 ₹63,000 |
| 1.03 | Supply of bearing 6220-C3 | 2 | no | 20,700 ₹41,400 Lowest | 21,000 ₹42,000 |
| 1.04 | Supply of missing nut & bolt of above motor | 1 | LS | 5,500 ₹5,500 Lowest | 6,000 ₹6,000 |
| 1.05Labour Cost: | |||||
| 1.06 | 1). Dismantling of Motor(removal of Fan & other accessories) & refitting. 2). Replacement of defective bearing with new one with grease etc. 3). Dismantling of terminal box and refitting after repairing. 4). Repairing of terminal box. | 2 | Jobs | 16,910 ₹33,820 Lowest | 16,910 ₹33,820 Lowest |
| 1.07 | Transportation Charges Up & Down | 1 | LS | 7,500 ₹7,500 Lowest | 7,500 ₹7,500 Lowest |
| 1.08 | P. F. amount for labour cost | 1 | no. | 4,180.15 ₹4,180.15 Lowest | 4,180.15 ₹4,180.15 Lowest |
| 1.09 | Total impact of GST for the purpose of CTC | 1 | nos | 27,612.03 ₹27,612.03 Lowest | 28,170.03 ₹28,170.03 |
Tender Value
₹1.8 L
EMD Value
₹2,300
Closing Date
28 May 2026, 5:00 pmClosed
AE EnM
S.B.AREA
Repairing of 02 nos of 250KW, 6.6KV Motors (Make Marathon Electric Motors (India) Limited) of S. B. Project.
2026_ECL_359681_1
GM/SBA/EnM/Tender/26-27/01
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
S.B.Project
Please refer tender document.
4 documents required · 4 mandatory
₹2,300
10 Aug 2026
18 May 2026
30 May 2026
18 May 2026
28 May 2026
18 May 2026
18 May 2026 - 21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item Description/ Heading | - | - | - | - |
| - | Material Cost | - | - | - | - |
| - | Supply of bearing NU 220-C3 | 2 | no. | 29,209 | ₹58,418 |
| - | Supply of bearing 6220-C3 | 2 | no | 19,950 | ₹39,900 |
| - | Supply of missing nut & bolt of above motor | 1 | LS | 5,370 | ₹5,370 |
| - | Labour Cost: | - | - | - | - |
| - | 1). Dismantling of Motor(removal of Fan & other accessories) & refitting. 2). Replacement of defective bearing with new one with grease etc. 3). Dismantling of terminal box and refitting after repairing. 4). Repairing of terminal box. | 2 | Jobs | 16,910 | ₹33,820 |
| - | Transportation Charges Up & Down | 1 | LS | 7,500 | ₹7,500 |
| - | P. F. amount for labour cost | - | no. | - | - |
| - | Total impact of GST for the purpose of CTC | - | nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 1.67 MB
Tendernotice_3.pdf
PDF • 1.29 MB
BOQ_372686.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .