| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹21.8 L+₹1.4 L (6.64%)Rejected-Finance NO 577 5TH MAIN D GROUP LAYOUT 60 FEET ROAD SRI GANDHAKAVAL BANGALORE 560 091 | BANGALORE | BANGALORE | KARNATAKA | 560091 | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹30.5 L+₹10.0 L (48.9%)Rejected-Finance | L3 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | Suneetha Engineers and Contractors L3 | PATEL CONSTRUCTION L2 | SMLP ASPHALTS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavating over areas, not exceeding 1.5 m deep and getting out in any type of soil, complete all as specified and directed | 165 | CUM | 300 ₹49,500 | 350 ₹57,750 | 250 ₹41,250 Lowest |
| 2.00 | Material & Labour for Removing excavated material exceeding 250 mtr but not exceeding 500 mtr and depositing at a point not exceeding 1.5 mtr above the starting point, complete all as specified and directed. | 165 | CUM | 300 ₹49,500 | 500 ₹82,500 | 150 ₹24,750 Lowest |
| 3.00 | Material & Labour for 100mm thick moorum filling in berms, spread, rolled and consolidated to gradient and camber to required thickness complete all as specified and directed. | 550 | 10 SQM | 2,000 ₹11,00,000 | 350 ₹1,92,500 Lowest | 420 ₹2,31,000 |
| 4.00 | Proving and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3(1 cement :3 course sand) including making joints with or without grooves (thickness of joints except at sharp curve shall not more than 5mm) including making drainage opening wherever required, complete all as specified. | 9 | CUM | 10,000 ₹90,000 Lowest | 13,000 ₹1,17,000 | 10,000 ₹90,000 Lowest |
| 5.00 | Material and Labour for soling of 150mm thick (spread thickness) with broken boulders or quarried stone of size 50 mm to 100mm deposited spread and levelled in a single layer, interstices filled, surface formed, complete all as specified and directed. | 50 | 10 SQM | 2,550 ₹1,27,500 | 3,000 ₹1,50,000 | 2,500 ₹1,25,000 Lowest |
| 6.00 | Rolling and consolidating formation surfaces with 8-12 ton power roller including filling in soft spots , hollows and depressions etc which occurs during rolling to required level gradient and camber etc including watering as necessary during rolling etc complete all as speceified & directed. | 50 | 10 SQM | 500 ₹25,000 | 800 ₹40,000 | 150 ₹7,500 Lowest |
| 7.00 | Preparing surface of unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with air compressor to remove all loose dirt etc, complete all as specified and as directed. | 50 | 10 SQM | 2,000 ₹1,00,000 | 250 ₹12,500 Lowest | 2,400 ₹1,20,000 |
| 8.00 | Material & Labour for preparation of old black top surfaces by brushing with wire brushes/ coir brushes and removing caked mud, foreign particles, rbber deposits, silt, etc, sweeping clean with brooms and finally fanning the cleaned surfaces using suitable air blowers to remove all such deposits, complete all as specified and directed. | 115 | 10 SQM | 100 ₹11,500 Lowest | 100 ₹11,500 Lowest | 140 ₹16,100 |
| 9.00 | Material & Labour for Repairs to potholes, any depth not exceeding 1 Sqm each including sweeping free from dust and mud, or scoring sunken surfaces in road, paths etc, cutting around edges to at least 25mm in depth making road around by filling in screened a graded road metal) watering and well ramming (including supply of road metal) using power roller of 8-12 tonne capacity and applying evenly a priming / tack coat with bituminous primer @ 6kg per 10sqm using paving bitumen grade VG-10 on top surface, all as specified and as directed. | 15 | 10 SQM | 2,000 ₹30,000 | 500 ₹7,500 | 450 ₹6,750 Lowest |
| 10.00 | Material and Labour for premix bituminous macadam, (consolidated thickness 75mm or less) by using 4% bitumen content using paving bitumen any panetration of grade VG-30 (confirming to IS-73-2006) laid, rolled and compacted to required gradient and camber using 8 to 10 tonne capacity power road roller laid with mechanical paver etc complete all as specified and directed. | 50 | CUM | 2,000 ₹1,00,000 Lowest | 10,500 ₹5,25,000 | 6,500 ₹3,25,000 |
Tender Value
₹24.2 L
EMD Value
₹48,500
Closing Date
11 Oct 2025, 6:00 pmClosed
Ranjeet Kumar, IDSE, CWE
Commander Works Engineers AF South Gangamma Circle Opp Guard Room 410 AFS Jalahalli Bangalore 560013
WIDENING OF ROAD BEHIND URC AND MISCELLANEOUS PLACES AT AFTC UNDER GE(M) (AF) JALAHALLI
2025_MES_724894_2
85349/E8
Open Tender
Civil Works
Item Rate
120 days
GE (M) (AF) Jalahalli
As per Tender Document
7 documents required · 7 mandatory
₹500
GE (M) (AF) Jalahalli
₹48,500
Yes
29 Oct 2025
20 Sept 2025
18 Oct 2025
20 Sept 2025
11 Oct 2025
27 Sept 2025
20 Sept 2025 - 23 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .