| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-Finance | ₹19.4 L | L1 | Accepted-Finance LER |
| 2 | L2₹19.7 LRejected-Finance | ₹19.7 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Venkatesan S L2 | Sivagurunathan L1 |
|---|---|---|---|---|---|
| 1.00Part:1 Construction of 30000 Lit OHT 12.00 Meter Height Staging and Extension of pipe line works and Allied works at Gnanam nagar 6th street East in Mariyammankovil panchayat of Thanjavur Union. | |||||
| 2.00Earth work excavation in all class of Soil except hard rock requiring blasting with initial lead and lift etc. Complete for foundation as per SS 20B | |||||
| 3.00 | First depth of 2m | 38.88 | Cu.m | 267.6 ₹10,404.29 | 263.62 ₹10,249.55 |
| 4.00 | Second depth of 1m | 6.78 | Cu.m | 279.38 ₹1,894.20 | 275.22 ₹1,865.99 |
| 5.00 | Sand filling with M.Sand filling including cost & conveyance of all materials and all Labour charges etc, Complete.,. | 2.09 | Cu.m | 2,287.75 ₹4,781.40 | 2,253.7 ₹4,710.23 |
| 6.00 | CC 1:4:8 mix uisng 40 mm ISS HBG Metal including cost & conveyance of all materials and all Labour charges etc, Complete.,. | 3.38 | Cu.m | 6,131.89 ₹20,725.79 | 6,040.62 ₹20,417.30 |
| 7.00 | CC 1:4:8 mix uisng 40 mm ISS HBG Metal including cost & conveyance of all materials and all Labour charges etc, Complete.,. | 0.22 | Cu.m | 6,131.89 ₹1,349.02 | 6,040.62 ₹1,328.94 |
| 8.00Reinforced Cement concrete ( M30) using graded aggregates excluding cost of Reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | |||||
| 9.00 | For footing below GL ( 1.50-4.50)below GL | 5.65 | Cu.m | 7,931.61 ₹44,813.60 | 7,813.56 ₹44,146.61 |
| 10.00 | For Column and brace upto ground level ( 0-1.50)below GL | 1.75 | Cu.m | 7,790.83 ₹13,633.95 | 7,674.87 ₹13,431.02 |
Tender Value
₹19.7 L
EMD Value
₹19,710
Closing Date
4 Feb 2026, 3:00 pmClosed
Block Development Officer (BP), Thanjavur
Block Development Office, Thanjavur
Thanjavur District ThanjavurBlock Construction of 30000 Lit OHT 12.00Meter Height Staging and Extension of pipe line works and Allied works at Gnanam nagar 6th street East in Mariyammankovil panchayat of under 15th Finance Commission -BP-2025-2026
2026_RDTN_646314_1
Rc.No.5950/2025/ A2/dated 20.01.2026
Open Tender
Civil Works
6 days
Thanjavur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹19,710
21 Mar 2026
23 Jan 2026
4 Feb 2026
23 Jan 2026
4 Feb 2026
23 Jan 2026
First depth of 2m
Second depth of 1m
Sand filling with M.Sand filling including cost & conveyance of all materials and all Labour charges etc, Complete.,.
CC 1:4:8 mix uisng 40 mm ISS HBG Metal including cost & conveyance of all materials and all Labour charges etc, Complete.,.
CC 1:4:8 mix uisng 40 mm ISS HBG Metal including cost & conveyance of all materials and all Labour charges etc, Complete.,.
For footing below GL ( 1.50-4.50)below GL
For Column and brace upto ground level ( 0-1.50)below GL
For Column and middle brace ( 0-4.50) from GL
For coloum beam floor slab and side wall from 4.51-7.32m from GL.
For side wall, haunch & Roof slab from (7.32to10.98m ) from GL.
For side wall, haunch & Roof slab from (10.98to14.64m ) from GL.
For side wall, haunch & Roof slab from 14.64m & up to 18.30m from GL
For column footing and GL brace
For middle brace and roof slab
For floor slab (Plain surface 9.30to10.30m)
For floor slab (Plain surface 8.30 to 9.30m
For floor slab (Plain surface 11.31 m to 12.30m
For column GL 0.00 to 3.30 m
Below GL
For column GL 3.30 m
For column 3.31 to 4.30 m
For column 4.30 to 5.30 m
For column 5.31 to 6.30 m
For column 6.31-7.30m
For column 7.31-8.30m
For Column 8.31 - 9.30m
For Column 9.31 to 10.30m
For Column 10.31 to 11.30m
For Column 11.31 to 12.30m
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cost and conveyance of all labour charges etc completed.
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Fabrication,Supply , delivery and fixing of outside MS ladder of 45cm wide 50x50x6mm MS angle for side stepsin 16mm MS plain rods fixed at 30mmc/c welded, joinded etc.
Providing Hand rails over the Roof slab by using 32 mm GI pipe with 40mm x6mm Ms Flat and fixied with 12 mm dia including cost and conveyance and all labour charges etc complete.
Providing and fixing of RCC access inner ladder in RCC 1:1:5:3 mix using 20mm HBG metel including cost and conveyance and all labour charges etc complete.
Providing GI ventilating arrangements, mosquito proof nylon net with 65mm GI Pipes and cowl etc complete.
Providing Cut Stone Slab in CM 1:3 and as directed by TWAD Board officers
Providing manhole cover of size 0.60x0.60m in RCC 1: 1:5:3mix with suitable reinforcement and 50x50x6mm MS along edges etc. comple.
65mm dia GI pipes for tank connection
65mm dia GI pipes for tank connection
50mm GI pipes for scour pipe
65mm dia GI pipes for tank connection
90mm pvc Threaded coupler
65 mm dia PVc threaded coupler
65 mm dia GI Tee
65mm dia GI 900 bend
65mm dia GI coupler
65mm dia GI Union
65mm dia GI Reducer
65x50mm dia GI Reducer
75mmx63mm Pvc Reducer
75 mm PVC Threaded coupler
75x90 PVC Reducer
75x63 PVC Reducer
65mm dia GM Gate Valve
50mm dia GM Gate Valve
Labour charges for fixing of GI pipes & specials for OHT pipe connections
Refilling with excavated soil complying with standard specification in layers of 15 cm thick well rammed and consolidated after pipes and specials are laid and tested.
Provision for supply and fixing of Chlorinated charges
Provision for Water meter with Dirt Box and fixing charges
Earthwork excavation and depositing on bank with an initial lead of 10M and initial lift of 2M in hard stiff clay stiff blockcotton soil hard red earth shells, murrams, gravel stoney earth and earth mixed with 50% fair sized boulders and hard gravelly soil etc., complete
Supplying and filling with good M-Sand filling including watering ramming and consolidation etc.,complete
Cement concrete works 1:4:8(one part of cement, four part of sand and eight part of aggregate), using broken stone 40mm size for levelling course for foundation,Basement including mixing, placing, finishing, curing etc., complete.
For platform
Cement concrete 1:2:4 Mix using 20mm ISS & HBG metal including cost & conveyance & labour charges etc., completed.
Dismantling for the cement plastering including cost and coveyance of all labour charges etc., completed.
Plastering with Cement Mortar 1:5 (one part of cement and five part of sand) 12mm thk. Including labour charges for mixing,finishing, curing etc.complete
Special ceiling plastering for RCC slab with Cement Mortar 1:3(one part of cement and three parts of sand) 10mm thick including labour charges etc.complete
White washing two coats of including cost and conveyance off all labour charges etc., completed.
Distembering two coats of including cost and conveyance off all labour charges etc., completed.
Cost and supply of new steel door
Supply and delivery of following pipes
90 mm OD PVC Pipe 4 KSC
63 mm OD PVC Pipe 4 KSC
90 mm OD PVC Pipe 4 KSC
63 mm OD PVC Pipe 4 KSC
90 mm OD PVC Pipe 4 KSC
63 mm OD PVC Pipe 4 KSC
90 mm OD PVC Pipe 4 KSC
63 mm OD PVC Pipe 4 KSC
Supply and delivery of following pvc/GI Specials
90 mm dia PVC Bend
90 mm dia PVC T Coupler
90 mm dia PVC Tee
Provision for soak pit
90 mm dia PVC end cap
90 mm dia PVC Elbow
63 mm Pvc Coupler
63 mm Pvc Tee
63 mm Pvc Elbow
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_774740.xls
BOQ • 0.33 MB
TechnicalBidmariyaGnanam6th.pdf
Additional Documents • 0.50 MB
PriceBidMariyaGnanam6th.pdf
Additional Documents • 0.36 MB
Download all tender documents and submit your bid