Tender Value
₹14.4 Cr
EMD Value
₹28.8 L
Closing Date
4 Jun 2026, 3:00 pmClosed
Design, Supply, Erection, Testing & Commissioning of 25 KV, 50 Hz Single Phase AC OHE in connection with the following works over Lucknow Division of Northern Railway: (i) 3rd line between Dilkusha to Malhour, (ii) Creation of shed capacity for pit line examination for Vande bharat (16 coach) in Lucknow (Charbagh Workshop) (iii) Provision of Additional Loop line work at Utratia adjacent to line no 7. (iv) Conversion of Achalganj Halt into Crossing station
151-Dy-CEE-C-LKO-2026-27
151-Dy-CEE-C-LKO-2026-27
Open
18 Months
Lucknow, Uttar Pradesh
₹0
₹28.8 L
9 May 2026
9 May 2026
21 May 2026
4-OHE SOR SECTION-IV (NON-FERROUS) 7423504.58 Below/Pa
Item Breakup - 1-OHE SOR SECTION-I (GENERAL)
Each Supply without insulator and erection of material for termination of Single conductor of Over head equipment or terminating wire.
Each Supply without Insulator and erection of material for termination of all aluminium 25KV Feeder / return conductor (Single SPIDER)
Each Supply without insulator and erection of materials for termination of copper cross feeder with gantries.
Set Supply without Insulator and erection of cut-in(9Tonne) Insulator
Each Supply without Insulator and erection of a suspension (9Tonne) Insulator
Each Supply without Insulator and erection of 25 KV Post Insulator
Each Suuply & Erection of 25kV Vacuum type Interrupter
Each DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY Supply and Erection of 25kV Potential Transformers Type-I
Each Supply and Erection of 42KV Lightning Arrestors (station class)
Each Supply and Erection of Terminal Boards in control cubicles.
Each Supply and Erection of an Iron clad 110 V.D.C Fuse Box.
Each Supply and erection of an Iron clad 230 V.A.C Fuse Box.
Each Supply & Installation of cables for Control and indication circuit
Metre Supply & Installation of cables for Heater supply
Metre Supply & Installation of cables for Catenary indication
Metre Supply & Installation of cables for L.T. Power supply
Metre Supply & Installation of cables for 110V D.C. supply
Metre Supply, Erection, oil- filtration, testing and commissioning of L.T. supply transformers (10 kVA).
Each Supply and Erection, oil- filtration, testing and commissioning of L.T. supply transformers (25 kVA).
Each Supply without Insulator & erection of 25 kV D.O. fuse switch.
Each Modification to erected equipments :Transfer of equipment from one mast or support to another.
Each Modification to erected equipments :Dismantling of a Section Insulator Assembly
Each Total 2966083.00 Item- 2 Erection S No. Item No Description of Item Unit Qty Rate Amount Preparation of designs and drawings for overhead equipment and verification of purchaser's pegging plan.
Per Track Erection KM Preparation of designs and drawings for switching stations (FP/SP/SSP)
Each Supply without insulator and erection of mounting arrangements for span wire. DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY
Each Marking/painting of temperature & 'Y'- Measurement of OHE mast at BWA locations
Each Supply without insulator and erection of material for termination of Single conductor of Over head equipment or terminating wire.
Each Supply without Insulator and erection of material for termination of all aluminium 25KV Feeder / return conductor (Single SPIDER)
Each Supply without insulator and erection of materials for termination of copper cross feeder with gantries.
Set Supply without Insulator and erection of cut-in(9Tonne) Insulator
Each Supply without Insulator and erection of a suspension (9Tonne) Insulator
Each Supply without Insulator and erection of 25 KV Post Insulator
Each Extra for special embedment of earth electrode.
Each Suuply & Erection of 25kV Vacuum type Interrupter
Each Supply and Erection of 25kV Potential Transformers Type-I
Each Supply and Erection of 42KV Lightning Arrestors (station class)
Each Supply and Erection of Terminal Boards in control cubicles.
Each Supply and Erection of an Iron clad 110 V.D.C Fuse Box.
Each Supply and erection of an Iron clad 230 V.A.C Fuse Box.
Each Supply & Installation of cables for Control and indication circuit
Metre Supply & Installation of cables for Heater supply
Metre Supply & Installation of cables for Catenary indication
Metre Supply & Installation of cables for L.T. Power supply
Metre Supply & Installation of cables for 110V D.C. supply DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY
Metre Supply, Erection, oil- filtration, testing and commissioning of L.T. supply transformers (10 kVA).
Each Supply and Erection, oil- filtration, testing and commissioning of L.T. supply transformers (25 kVA).
Each Supply without Insulator & erection of 25 kV D.O. fuse switch.
Each Modification to erected equipments :Transfer of equipment from one mast or support to another.
Each Modification to erected equipments :Dismantling of overhead equipment.
Kilometre Modification to erected equipments :Dismantling of Feeder/ Return Conductor
Kilometre Modification to erected equipments :Splicing & extension of an anchored overhead equipment.
Each Modification to erected equipments :Dismantling of a Section Insulator Assembly
Each Modification to erected equipments :Slewing and putting back of OHE in original shape
Each Span Modification to erected equipments :Dismantling of an Isolator
Each Modification to erected equipments :Dismantling of a Post/ Pedestal Insulator.
Each Modification to erected equipments :Manning of Switching stations (SP/SSP)
Each/month Supply and erection of materials for internal wiring and external lighting of Switching Station building(SP/SSP)
Each Extra on erection rates (Items of sub- section - I) for work under a power block @ 100%
10.00 mounting arrangement of span wire
6.00 material for termination of Single conductor of Over head equipment or terminating wire.
16.00 material for termination of all aluminium 25KV Feeder / return conductor (Single SPIDER)
10.00 materials for termination of copper cross feeder with gantries. DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY
62.00 cut-in(9Tonne) Insulator
36.00 suspension (9Tonne) Insulator
34.00 KV Post Insulator
20.00 electrode.
7.00 commissioning of L.T. supply transformers (10 kVA).
1.00 and commissioning of L.T. supply transformers (25 kVA).
7.00 kV D.O. fuse switch.
184.00 support to another.
& extension overhead equipment.
Each Total 1229071.40
Item Breakup - 2-OHE SOR SECTION-II (CONCRETE)
cum Reinforced concrete
cum Supply & Spreading of Ballast/Gravel in the Switch Yard.
Sqm Total 5649260.00 Item- 2 Erection S No. Item No Description of Item Unit Qty Rate Amount Concrete for foundation and plinth In other than hard soil and rock
cum Reinforced concrete
cum Supply of materials and costruction of Super Structure of SP/SSP building (Control cubicles)
Each Brick work for foundation plinth & retaining wall
cum Excavation of pile of 100 mm to 200 mm dia upto 3.5M deep.
Metre Plastering of retaining wall with 1:4 cement & sand mortar.
Sqm DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY Supply & Spreading of Ballast/Gravel in the Switch Yard.
Item Breakup - 3-OHE SOR SECTION-III (FERROUS)
MT S u p p l y and erection of fabricated and galvanised structures (O,N & R type portals) with necessary components other than masts.
MT Supply and erection of Structure steel(traction masts) fabricated and galvanised Type : B-Series Mast
MT Supply & Erection of special fabricated and galvanised steel structures other than Portals & traction- Masts not covered under items 3(b)(i) &3(b)(ii)
MT Supply only of fabricated steel other than masts
MT Supply and erection of a Guy Rod Assembly
Each Supply and erection of 25KV Caution Boards including staff caution Board
Each Supply without insulator and erection of Single bracket assembly.
Each Supply without Insulator and erection of a pull off arrangement for one OHE.
Each Supply and erection of Regulating Equipment (3-Pulley type) with counter weight assembly for conventional/ composite OHE.
Each Supply without Insulator and erection of materials for termination of Double overhead equipment conductor.
Each Supply without Insulator and erection of anticreep with galvanized steel wire.
Each Supply and erection of a structure bond.
Each Supply and erection of a longitudinal bond
Each Supply & erection of a transverse and special bond.
Each Supply & erection of a single earth electrode. DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY
Each Supply and erection of earth bus
Metre Supply and erection of 8 SWG G.I. wire for earthing
Metre Supply and erection of fencing panels at switching stations.
Metre Supply and erection of fencing uprights
MT Supply and erection of anticlimbing device for Switching stations
Metre Supply and erection of anticlimbing device for L.T. Supply Transformer Stations.
Each Supply and erection of Danger Plate on a Height Gauge Structure
Each Total 29752946.50 Item- 2 Erection S No. Item No Description of Item Unit Qty Rate Amount Supply & Erection of traction masts, main masts of switching stations, Booster transformer station, fabricated from Rolled mild steel joist (RSJ) of size 203mm x 152 mm x 52.0 Kg/m and galvanised in various lengths .
MT S u p p l y and erection of fabricated and galvanised structures (O,N & R type portals) with necessary components other than masts.
MT Supply and erection of Structure steel(traction masts) fabricated and galvanised Type : B-Series Mast
MT Supply & Erection of special fabricated and galvanised steel structures other than Portals & traction- Masts not covered under items 3(b)(i) &3(b)(ii)
MT Supply and erection of a Guy Rod Assembly
Each Supply and erection of 25KV Caution Boards including staff caution Board
Each Supply without insulator and erection of Single bracket assembly.
Each Supply without Insulator and erection of a pull off arrangement for one OHE.
Each Supply and erection of Regulating Equipment (3-Pulley type) with counter weight assembly for conventional/ composite OHE.
Each Supply without Insulator and erection of materials for termination of Double overhead equipment conductor. DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY
Each Supply without Insulator and erection of anticreep with galvanized steel wire.
Each Supply and erection of a structure bond.
Each Supply and erection of a longitudinal bond
Each Supply & erection of a transverse and special bond.
Each Supply & erection of a single earth electrode.
Each Supply and erection of earth bus
Metre Supply and erection of 8 SWG G.I. wire for earthing
Metre Supply and erection of fencing panels at switching stations.
Metre Supply and erection of fencing uprights
MT Supply and erection of anticlimbing device for Switching stations
Metre Supply and erection of anticlimbing device for L.T. Supply Transformer Stations.
Each Supply and erection of Danger Plate on a Height Gauge Structure
Each Extra on erection rates(Items of sub- section - III) for work under a power block @ 100%
8.50 masts of switching stations, Booster transformer station, fabricated from Rolled mild steel joist (RSJ) of size 203mm x 152 mm x 52.0 Kg/m and galvanised in various lengths .
85.00 galvanised structures (O,N & R type portals & Special Portals ) with necessary components other than masts.
and steel(traction masts) fabricated and galvanised Type : B-Series Mast
50.00 galvanised steel structures other than Portals & traction- Masts not covered under items 3(b)(i) &3(b)(ii)
10.00 Boards including staff caution Board
230.00 Single bracket assembly.
1.00 pull off arrangement for one OHE.
and Equipment (3-Pulley type) with counter weight assembly for conventional / composite OHE. DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY
24.00 materials for termination of Double overhead equipment conductor.
8.00 anticreep with galvanized steel wire. Extra on erection rates for steel work manually under item 3(a)(i), 3(a)(ii), 3(b) (i),3(b)(ii) &3(b)(iii) @ 50%.
14.50 masts of switching stations, Booster transformer station, fabricated from Rolled mild steel joist (RSJ) of size 203mm x 152 mm x 52.0 Kg/m and galvanised in various lengths .
185.00 galvanised structures (O,N & R type portals & Special Portals ) with necessary components other than masts.
and steel(traction masts) fabricated and galvanised Type : B-Series Mast
148.00 galvanised steel structures other than Portals & traction- Masts not covered under items 3(b)(i) &3(b)(ii) Total 3432632.75
Item Breakup - 4-OHE SOR SECTION-IV (NON-FERROUS)
Each Supply & Erection of contact wire only
Kilometre Supply and erection of earth wire.
Kilometre Extra on item 6(az) for supply and erection of additional fittings at a turn-out, diamond crossing or overlap
Each Extra on item 6(bz) for supply and erection of additional fittings required at a turnout, diamond crossing or overlap.
Each Supply & erection of a double wire section insulator assembly without insulators.
Each Supply without Insulator and erection of a 25 KV single pole isolator without earth contact assembly.
Each Supply without Insulators & erection of two 25 kV Single Pole Isolator gang operated without earth contact assembly.
Each Extra for supply & erection of an earth contact assembly in an Isolator.
Each Supply & erection of large copper jumpers
Each Supply & erection of small copper jumpers
Each Supply & erection of copper jumpers DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY
Each Supply & erection of a copper jumper for drop out fuse switch
Each Supply and erection of an aluminum jumper.
Each Supply of materials and erection of Large copper jumper 160 Sq. mm between cross feeder and OHE
Each Supply and erection of copper strips for equipment earthing.
Metre Supply & erection of : Aluminum bus-bars 36mm x 28mm.
Metre Supply & erection of Solid copper bus-bars 18mm.:
Metre Supply and erection of Aluminum bus-bar connectors:- Bus terminal (6480)
Each Supply and erection of Aluminum bus-bar connectors:- Bus splice (6490)
Each Supply and erection of Aluminum bus-bar connectors:- Bus tee connector (6500)
Each Supply and erection of Aluminum bus-bar connectors:- Terminal connector 36/20 (6530)
Each Supply and erection of Aluminum bus-bar connectors:- Tap connector (6520)
Each Supply and erection of Aluminum bus-bar connectors:- Flexible bus splice (6550)
Each Supply and erection of Aluminum bus-bar connectors:- Terminal connector Bolted Type (6830-1)
Each Supply & erection of solid copper bus-bar connectors: Bus splice (6320)
Each Supply & erection of solid copper bus-bar connectors: Bus tee joint (6330)
Each Supply & erection of solid copper bus-bar connectors: Bus terminating tee (6351)
Each Total 2288401.90 Item- 2 Erection S No. Item No Description of Item Unit Qty Rate Amount Supply without insulator and erection of Suspension/ registration of contact wire only.
Each Supply & Erection of contact wire only
Kilometre Supply and erection of earth wire. DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY
Kilometre Extra on item 6(az) for supply and erection of additional fittings at a turn-out, diamond crossing or overlap
Each Extra on item 6(bz) for supply and erection of additional fittings required at a turnout, diamond crossing or overlap.
Each Supply & erection of a double wire section insulator assembly without insulators.
Each Supply without Insulator and erection of a 25 KV single pole isolator without earth contact assembly.
Each Supply without Insulators & erection of two 25 kV Single Pole Isolator gang operated without earth contact assembly.
Each Extra for supply & erection of an earth contact assembly in an Isolator.
Each Supply & erection of large copper jumpers
Each Supply & erection of small copper jumpers
Each Supply & erection of copper jumpers
Each Supply & erection of a copper jumper for drop out fuse switch
Each Supply and erection of an aluminum jumper.
Each Supply of materials and erection of Large copper jumper 160 Sq. mm between cross feeder and OHE
Each Supply and erection of copper strips for equipment earthing.
Metre Supply & erection of : Aluminum bus-bars 36mm x 28mm.
Metre Supply & erection of Solid copper bus-bars 18mm.:
Metre Supply and erection of Aluminum bus-bar connectors:- Bus terminal (6480)
Each Supply and erection of Aluminum bus-bar connectors:- Bus splice (6490)
Each Supply and erection of Aluminum bus-bar connectors:- Bus tee connector (6500)
Each Supply and erection of Aluminum bus-bar connectors:- Terminal connector 36/20 (6530)
Each DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY Supply and erection of Aluminum bus-bar connectors:- Tap connector (6520)
Each Supply and erection of Aluminum bus-bar connectors:- Flexible bus splice (6550)
Each Supply and erection of Aluminum bus-bar connectors:- Terminal connector Bolted Type (6830-1)
Each Supply & erection of solid copper bus-bar connectors: Bus splice (6320)
Each Supply & erection of solid copper bus-bar connectors: Bus tee joint (6330)
Each Supply & erection of solid copper bus-bar connectors: Bus terminating tee (6351)
Each Extra on erection rates (Items of sub- section - IV) for work under a power block @ 100%
of equipment only
1.50 Feeder/ Return conductor (Single Spider)
0.40 wires (37/2.25 mm HDBC) across the track at SP/SSP/FP/BT locations
42.00 of additional fittings at a turn-out, diamond crossing or overlap
12.00 section insulator assembly
1.00 Glass Fibre type (PTFE) Short Neutral section assembly
6.00 25 KV single pole isolator without earth contact assembly.
3.00 drop out fuse switch
12.00 copper jumper 160 Sq. mm between cross feeder and OHE
8.00 equipment earthing.
22.00 connectors: Bus terminal (6310)
8.00 connectors: Bus splice (6320)
4.00 connectors: Bus tee joint (6330)
4.00 connectors: Bus terminating tee (6351) Extra on erection rates for stinging work manually under item 6(a),(b),(c)&(d) @ 50%. DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY
of equipment only Total 559598.25
Item Breakup - 5-OHE SOR SECTION-V (INSULATOR)
Each Supply of 9- Tonne insulators for item 5(a) (i), 5(b) & 5(c)
Set Supply of 9- Tonne insulators for item 8(b) (i),(ii),(iii), (iv),(vi),(vii), (viii)&(ix)
Each Supply of 9- Tonne insulators for item 9(a), (b), (c), (d) & (e)
Each Supply of 9- Tonne insulator for item 11(a) (i) &11(a)(ii)
62.00 11(b) Supply of 9 - Tonne and Sectioning Insulators for item No.12(a)
mm) Sectioning Insulator Supply of 9 - Tonne and Sectioning Insulators for item No.12(b)
16.00 item 13(a)
20.00 item 13(c)
Set Total 3281637.04
Item Breakup - 6-OHE NS ITEMS
Numbers NS-1 (B):-Supply and erection of OHE caution board with supply of fixing material (Clamp, back flat strip & fasteners) for- Signal Board at neutral section for Electric Engine to SWITCH ON/OFF size 800mm x 400mm x 2mm(Retro reflevtive type) as per RDSO specification no ETI/OHE/33 a (12/97) rev-8 (11/2012) or latest and Drg no RE/33/348,349 rev-B or latest as per scope of work and explanatory note
Numbers DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY NS-1 (C)Supply and erection of OHE caution board with supply of fixing material (Clamp, back flat strip & fasteners) for-'caution unwired turnout' board size 900x600x2mm as per RDSO specification no ETI/OHE/33 (8/85) or latest as per RDSO drawing no ETI/OHE/P/7573 Rev-A or latest as per scope of work and Explanatory Note
Numbers NS-1 (D): Supply and erection of OHE caution board with supply of fixing material (Clamp, back flat strip & fasteners) for- E l e c t r i c Engine stop board size 900x600x2mm as per RDSO specification no ETI/OHE/33 (8/85) or latest as per RDSO Drawing no ETI/OHE/P/7572 Rev-B or latest as per Scope of work and explanatory note
Numbers NS-1 (E)Supply and erection of "caution clearance to OHE nearby restricted board" size 400 x 270 x 2 mm as per RDSO specification no ETI/OHE/33 (8/85) or latest as per RDSO Drawing no RE/33/436, Rev-C or latest as per scope of work and explanatory note
Numbers NS-1 (F)Supply and erection of "Dead section caution board" (Power block working limit board) Size 400 x 400 x 2 mm as per RDSO specifiaction no ETI/OHE/33 (8/85) or latest as per RDSO drawing no ETI/OHE/P/7574 or latest as per scope of work and explanatory note
Numbers NS-1 (G):-Supply and erection of enamled type caution live wire board size 450 X 225 x 2 mm as per RDSO specification no ETI/OHE/33 (8/85) or latest as per RDSO drawing no ETI/OHE/T/7574 Rev-A or latest as per scope of work and explanatory note
Numbers NS-1 (I):-Supply and erection of Shock treatment chart (glass framed) size 22x 18 " complete with aluminium angle beading 1/4" x 3/4 "all around
Numbers NS-1 (J):-Supply and erection of Gate man/station master instruction board (glass framed) size 11.6" x 8.2 " complete with aluminium angle beading all around
Numbers NS-1 (K):-Fabrication and supply of pre compressed particle laminated borads white in colour with aluminium beading 1/2" x 1/2" all around and an arrangement of fixing /hanging on wall of adequate strengh on top of boards required in size
Square Material + Erection Foot NS-1 (L) Development the sectioning diagram schematic diagram and TSWR diagram with computerised digital printing on adhesive vinyl of adequate size as per annexure -A and colour of as per provided in drawing
Square Material + Erection Foot DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY NS-1 (M):-Modificaiton in already developed diagram in different size with computerised digital printing on adhesive vinyl of adequate size and color as provided in Drawing
Square Material + Erection Foot NS-1 (O)Supply and erection of telephone box wooden size 18" x 12 " x 8 "
Numbers NS-1 (P):-Supply and erection of OHE wooden key box size 15"x10"x4.5"
Numbers NS-1 (Q)Replacement of enamaled type number plate and supply & erection of retro reflective number plate in place of replaced enameled number plate as per RDSO Drg no ETI/OHE/P/7053 or latest along with fixing arrangement and stenciling on mast.
Numbers NS-1 (R):-Supply and erection of fire bucket stand as per drg no RE/UMB/FB/SK/07 mod A (Approx wt 51 kg) legs will be grouted with cement concrete (1:3:6 mix) size 12"x12"x18" along with four no fire bucket 09 ltr capacity (approx weight 1.4 kg) per stand filled with dry flowing stand
Numbers NS-1 (S)Supply and erection of fire extinguisher 6 kg capacity suitable for ABC class of fire dry chemical powder ISI make stored pressure type initially charged with discharge hose & nozzle including fixing clamp.
Numbers NS-2 |(A):-Design Manufacturing supply of retro reflective type sigma board as per RDSO drawing no TI/DRG/OHE/PLTBRD/RDSO/00036/12/0(Size 450mmx60mm) and RDSO specification no ETI/OHE/33A(12/97) Rev.8
Numbers NS-2 (B) Cost of GI clamp for mounting arrangement suitable for sigma board (4 nos ) including transportation.
Each NS-2 (C) Erection of GI clamps (4 nos ) including 4 nos 12 mm dia GI nuts & bolts 300 mm long (fully threaded) with necesssary washer spring wahser including retro reflective type sigma board on non reflective back gound at different OHE mast and portals including transportation
Each Total 777288.00 Item- 2 SECTION-6B S No. Item No Description of Item Unit Qty Rate Amount NS-11:Dismantling of Mast
MT NS-11 (A):-Extra on erection rates (for work under power block) for item no NS-11 @ 100% of erection rate
MT NS-12:Dismantling of Portal DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY
MT NS-12(A):-Extra on erection rates (for work under power block) for item no NS-12 @ 100% of erection rate
MT NS-13:Dismantling of a Copper/ Aluminium jumper.
Each NS-13 (A):-Extra on erection rates (for work under power block) for item no NS-13 @ 100% of Erection rate
Each NS-14:Shifting of OHE termination (Regulated) from one mast or support to another
Each NS-14(A):-Extra on erection rates (for work under power block) for item no NS-14 @ 100% of erection rate
Each NS-15:Adjustment on bracket assemblies for lowering/raising the height of contact and catenary wires where Encumbrance is changed.
Each NS-15 (A):-Extra on erection rates (for work under power block) for item no NS-15 @ 100% of erection rate
Each NS-16:Adjustment on bracket assemblies for lowering/raising the height of contact and catenary wires where Encumbrance is not changed.
Each NS-16(A):-Extra on erection rates (for work under power block) for item no NS- 16 @ 100% of erection rate
Each NS-17:Shifting of OHE termination (Fixed ) from one mast or support to another
Each NS-17 (A)Extra on erection rates (for work under power block) for item no NS-17 @ 100% of erection rate
Each NS-19:Loading, leading, transportation, unloading and stacking of steel structures & Conductors etc. from TRD stores to site and released material from site to the store
MT NS-22 Supply and erection of earthing station as per special maintenance instruction no TI/SMI/0032 rev 2
Each NS-28:Dismantling of Foundation of RCC/MCC cement concrete anywhere in Yard/Block section upto required level for all heights
cum DYCEE-C-LKO-ELECTRICAL/NORTHERN RLY NS-29:Hiring and operating multi utility vehicle (maximum 03 vehicle in a month) of loading capacity one MT with sitting capacity of 4-6 persons, 4 strokes, 4 cylinder engine, facorty built metal body, cargo box type passenger cabin type or bith (with 24 hours availability) including cost of fuel lubricants operating and maintenance including on pucca kucha road along the track the contractor shall arrange road permit for vehicle for all the states of opeation as per instruction of engineer in charge and vehicle shall not be more than three years old
Each/month NS-30: Extra on NS 29 for every additional Km or part thereof over 1200 Km
Vehicle Km 15000.00 NS-31: Route Mapping of OHE mast by OLIVER-G Kit with use of GPS system in 25 KV AC OHE System between section of Lucknow Division
Kilometre NS@45"58@Provision of double contact wire under ROB/FOB complete with supply of cactenary wire & contact wire excluding supply of contact wire
Each NS-35:-Extra on erection rates (for work under power block) for item no NS- 34 @ 100% of erection rate
Each NS 42 : Provision 3:1 type modified ATD with counter weight assembly for conventional OHE (regulated)2400kgf as per explanatory note.
Each NS 36:- Supply and erection of large copper jumper of 160 sqmm size
Each NS-37:- Extra On erection Rates (for work under power block) for item no NS 36@ 100% of the erection Rates
Each NS 38:-- Provision of light weight section insulators assebmbly as per RDSO specification no TI/SPC/OHE/LWTSI/0060 Rev-1 with A&C slip no , STR: TI STR 024 rev 3 (Accepted make Arthur Flurry)
Each NS 39 :-Supply of battery Charger for 110 V 150 AH low maintenance lead acid batteries as per RDSO specification no TI/SPC/PSI/40-150/CHGR/1210 or latest.
Each NS-40:-Supply of LOW maintenance lead acid battery 110 V, 150 AH as per RDSO specification no RDSO/PE/SPEC/TL/0040 rev
Each Total 6362913.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
technicalbidforirepsupload.pdf Tender document Part I
ATTACHMENT
Financialbidforirepsupload.pdf tender document part II
ATTACHMENT
Download all tender documents and submit your bid