Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC | ₹3.5 Cr | L1 | Accepted-AOC Low Rate |
| 2 | L2₹3.6 CrRejected-Finance 687 DAMODAR NAGAR BARRA KANPUR NAGAR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹3.6 Cr | L2 | Rejected-Finance High Rate |
| 3 | L3₹3.6 CrRejected-Finance 111 NEW COLONY CHOUGURJI ETAWAH | ETAWAH | UTTAR PRADESH | 206001 | ₹3.6 Cr | L3 | Rejected-Finance High Rate |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
Tender Value
Refer Docs
EMD Value
₹21.2 L
Closing Date
17 Feb 2026, 12:00 pmClosed
SE Kanpur Circle PWD Kanpur
SE Kanpur Circle PWD Kanpur
Ramaipur Sadh Jahanabad road (By Departmental Hot Mix Plant)
2026_CEKNP_1114579_2
607C/131C-KV/2025-26 Dt. 30.01.2026
Open Tender
Civil Works - Roads
150 days
Kanpur Nagar
Please Refer tender Documents
2 documents required · 2 mandatory
₹6,785
₹21.2 L
Yes
SE Kanpur Circle PWD Kanpur
6 Apr 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
13 Feb 2026
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP 120 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Gr II(Bitumen VG-30)
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Clause 503. MORD
Providing and laying bituminous concrete with higher capacity batch type hot mix plant 120 TPH using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Construction of Subgrade and Earthen Shoulders With approved material obtained from distance borrow pits with all lifts & Leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300.2 .
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_2067070.pdf
BOQ Comparative Chart
xlsx
finsummary_2067070.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
Tendernotice_2.pdf
PDF • 1.29 MB
BOQ_2067070.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid