Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 16 PRATAP NAGAR CHARBHUJA RAWATBHATA CHITTORGARH RAJASTHAN 323307 | RAWATBHATA | CHITTORGARH | RAJASTHAN | 323307 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
7 Feb 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Shahjahanpur
Electy. Trans. Circle Shahjahanpur
Diversion, Modification, Height raising of 132KV Sandila- bangarmau LILO of Mallawan line towers 27 to 29 under ETD Hardoi
2021_UPTCL_658126_3
Short Term E. Tender no. 57ETC(S)/2021-22
Open Tender
Electrical Works
Fixed-rate
180 days
Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
A/c No. 0423002100107147 IFSC Code No. PUNB0042300
₹46,000
27 May 2022
29 Jan 2022
7 Feb 2022
29 Jan 2022
7 Feb 2022
29 Jan 2022
29 Jan 2022 - 5 Feb 2022
180 days
Amount
Q-1 WORK
Survey including making of Location Route, Preparation of Profile, Tower Schedule, Schedule of Materials for 132KV D.C. Towers & Gantries.
Check Survey & Peg marking of Tower / Gantry Locations.
Excavation of Foundation Pits for 132KV Towers / Gantries including all Earth work, Back filling, Levelling etc.
Setting of Stubs of 132KV D.C. Towers including all Foundation Work but excluding the Cost of Concerting & Excavation as per details below :
'A+0'/+5 type Tower
'B+0/5' type Tower
'C+0/5' type Tower
Concreting of Foundations using M15 Grade Cement - Concrete - Coarse Sand mixture in the Ratio of 1:2:4 with 20 mm Stone Metal for Towers & Gantries including Cost of Materials, De-watering, Shoring, Shuttering, Framing, Curing etc.
Installation of Steel Reinforcement Bars in R.C.C. Foundation for Towers & Gantries including Cost of Steel Reinforcement Bars with due Cutting, Bending, Placing, Binding etc.
Erection of Super Structures of above 132KV Towers, their Extensions wherever required and Gantries including all work above Ground Level with proper Fixing & Tightening of all Tower Parts including Fitting of Danger Plate, Phase Plate, Number Plate, Bird Guard etc. but excluding the Hoisting of Insulators, Fixing of Hardware Fittings, Conductor / Earth Wire Fittings / Accessories etc.
Laying, Stringing, Tensioning, Clamping, Jointing including Fittings of of all necessary hardware and accessories of OPGW with Installation of joint box of OPGW-OPGW etc.
Laying, Stringing, Tensioning, Clamping of ACSR Panther Conductor in all 6 Phases including Hoisting of Tension / Suspension Insulator Strings, Double / Single Tension Fittings, Single Suspension Fittings, Vibration Dampers etc.
Tack Welding of all the Bolts - Nuts upto 2nd Section of the Towers & upto 5 Meter height of Gantries from Ground Level with 3 Tacks of 10 mm thickness & finally, applying of Zinc Rich Aluminium Paint on the affected surface.
Earthing work including Earth Work etc. for Pipe type Earthing of new Section Towers / Gantries including cost of Coke, Salt etc.
Carriage of stub & cleats (2.7MT) through private truck from EFU Naini, Allahabad to 132kv s/s sandila (Approx. distance-350 Km.) alongwith sorting, shifting and loading at Naini and unloading and stacking at 132 kv s/s sandila
Carriage of 120 KN Disc Insulator (1100 Nos.) through private vehicle from 220 KV Sub-station, Shahjahanpur to 132 KV Sub-station, Sandila (Approx. distance 130 Km.) alongwith loading at 220 KV Sub-station, Shahjahanpur & unloading at 132 kv s/s sandila
Dismantling related work of existing line
Destringing of ACSR Panther Conductor from existing line in 6 Phases including lowering down of Tension / Suspension Insulator Strings, Double / Single Tension Fittings, Single Suspension Fittings, Vibration Dampers etc.
Destringing of OPGW from existing line including lowering down of Tension / Suspension clamps, Vibration Dampers etc.
Cutting of tack-welding nuts and bolts of existing tower.
Cutting of stubs and taking out chimney(1.3 mtr) by excavating the earth , removal of concrete from site and levelling of earth.
Dismanteling of superstructure of total tower 5 number (2no.-A Type, 2no.-A+5 Type, 1no. -C type,) with t&p,rope, pulley, and pulling arrangements etc.
Shifting of tower, and old ACSR Panther Conductor to 132 kv s/s sandila including -Tension / Suspension Insulator Strings etc.
Q-2 SUPPLY
SUPPLY OF DIVERSION OF 132 KV SANDILA-BANGERMAU LILO MALLAWAN LINE DUE TO GANGA EXPRESSWAY CROSSING
Tower Accsssories :
Number Plate
Danger Plate
Phase Plate
Bird Guard
Pipe Type Earthing Material for Tower
Hardwares and insulators
Single Suspension Fitting
Single Tension Fitting
Double Tension Fitting
Conductor Accessories :
Vibration Damper
Mid Span Compression Joint
Repair Sleeve
Performed Armour Rod
OPGW & Hardware fittings
48 Fibr (DWSM) OPGW Fibre Optic Cable
Supply and installation of hardware set for 48 Fibre (DWSM) OPGW
Joint box( 48 Fibre)
Gupta Construction Co.
Shiam and sons
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .