| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC | ₹14.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.4 LRejected-Finance | ₹14.4 L | L2 | Rejected-Finance L2 |
Updated dates
Tender Value
₹15.0 L
EMD Value
₹30,000
Closing Date
29 Dec 2025, 12:00 pmClosed
EE
RED GZB
Construction of boundary wall in the State Tax Department at Mohan Nagar.
2025_REDUP_1100654_7
NIT - 1413 dt 11.11.2025 Tender 14
Open Tender
Civil Works
120 days
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹30,000
Ghaziabad
2 Feb 2026
22 Dec 2025
30 Dec 2025
22 Dec 2025
29 Dec 2025
22 Dec 2025
22 Dec 2025
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. As Per DSR-2023 Item-2.8.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) complete as per DSR-2023 Item-4.1.8
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Above Plinth Lvl As DSR-2023 Item-5.2.2
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. As Per DSR-2023 Item-5.22.6
Centering and shuttering including strutting, propping etc. and removal of form forLintels, beams, plinth beams, girders, bressumers and cantilevers as per DSR-2023 Item-5.9.5
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts as per DSR-2023 Item-5.9.6
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) as per DSR-2023 Item-6.1.1
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) as per DSR-2023 Item-6.4.1
12 mm cement plaster of mix 1:4 (1 cement: 4 coarse sand) as per DSR-2023 Item-13.4.1
Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per DSR-2023 Item-13.46.1 Two Coats
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. As per DSR-2023 Item-13.80
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required as per DSR-2023 Item-10.25.2
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shadeTwo or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture as per DSR-2023 Item-13.62.1
Supply and fixing of M.S sign board.of prescribed size 1.20m *2.75 m with angle 40*40*6 mm iron angle and 1 mm thick ms iron sheet including painting and letter writing complete. Approved Rate As Per SE RED Meerut
Deduction-5% for Competitive Price Efficiency
Add GST 18% Rs
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_2028463.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid