| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Fee/PreQual/Technical/Finance | -32.23% | ₹10.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.5 L+₹43,220.08 (4.31%)Admitted-Fee/PreQual/Technical/Finance | -29.31% | ₹10.5 L+₹43,220.08 (4.31%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.8 L+₹80,578.81 (8.03%)Admitted-Fee/PreQual/Technical/Finance | -26.79% | ₹10.8 L+₹80,578.81 (8.03%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹11.5 L+₹1.5 L (14.5%)Admitted-Fee/PreQual/Technical/Finance | -22.43% | ₹11.5 L+₹1.5 L (14.5%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹13.4 L+₹3.3 L (33.1%)Admitted-Fee/PreQual/Technical/Finance | -9.77% | ₹13.4 L+₹3.3 L (33.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.8 L
EMD Value
₹29,600
Closing Date
17 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER RRWD SMC
EXECUTIVE ENGINEER Right River Works Division SMC Regal Lane Lal Chowk
Development of link road BWO soling metling from the house of A.H. Malik onwards, along with construction of surface drain at Masjid Abu Bakkar Lane Shuperbagh Chatterhama
2026_HAUDD_317494_5
SHORT Term NOTICE INVITING ETENDER No. 21 of 2026-2027 Dated 23.07.2026
Open Tender
Civil Works
Percentage
90 days
Shuperbagh Chatterhama
Refer to Tender Document
2 documents required · 2 mandatory
₹602
FA/CAO AC No 0216010200000007
₹29,600
20 Aug 2026
23 Jul 2026
18 Aug 2026
24 Jul 2026
17 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. | 89.39 | Kl | 167.8 | ₹14,999.64 |
| - | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 7.93 | Cum | 1,725.2 | ₹13,680.84 |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 1 meter from cutting edge | 65.97 | Cum | 479.3 | ₹31,619.42 |
| - | Supplying and Laying of Ston Soling Hand packed tightly including ramming, watering and carriages complete | 13.43 | Cum | 850 | ₹11,415.5 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 12.7 | Cum | 5,202.9 | ₹66,076.83 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 59.69 | Cum | 6,591.25 | ₹3,93,431.71 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 8.94 | Cum | 9,821.85 | ₹87,807.34 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,610.55 | Kgs | 123.2 | ₹1,98,419.76 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 207.06 | Sqm | 286.35 | ₹59,291.63 |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 40.33 | Sqm | 628.95 | ₹25,365.55 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1040881.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .