Tender Value
₹61.9 L
EMD Value
₹1.2 L
Closing Date
30 Sept 2026, 4:00 pm4d left
Executive Engineer PWD RnB Division Banihal
Executive Engineer PWD RnB Division Banihal
Refer to BOQ
2026_PWDJK_325089_1
NIT 49 of 2026-27 Dated 17-09-2026
Open Tender
Civil Works
Percentage
180 days
Executive Engineer PWD RnB Division Banihal
Refer to SBD
2 documents required · 2 mandatory
₹1,600
Executive Engineer PWD RnB Division Banihal
₹1.2 L
Executive Engineer PWD RnB Division Banihal
18 Sept 2026
18 Sept 2026
1 Oct 2026
18 Sept 2026
30 Sept 2026
18 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of G.S. Sheet | 163.57 | sqm | 125.35 | ₹20,503.5 |
| 2 | Dismantling wood work in frames, trusses, purlins and rafters upto 10 meters span and 5 meters height including stacking the material within 50 meters lead Of sectional area 40 sqcm. and above. | 4.89 | cum | 3,488.65 | ₹17,059.5 |
| 3 | Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional span of one meter or part thereof beyond 10 meters Of sectional area 40 sqcm and above. | 4.89 | Cum | 463.15 | ₹2,264.8 |
| 4 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead | 60.02 | Cum | 1,740.45 | ₹1,04,461.81 |
| 5 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead : Of area of 3 sqm. and below | 8 | No | 285.25 | ₹2,282 |
| 6 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil : | 237.9 | cum | 592.9 | ₹1,41,050.91 |
| 7 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 175.42 | Cum | 479.3 | ₹84,078.81 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 22.88 | cum | 5,202.9 | ₹1,19,042.35 |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 77.3 | Cum | 5,733.6 | ₹4,43,207.28 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 31.6 | Cum | 7,788.4 | ₹2,46,113.44 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1097446.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .