| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 LRejected-Finance | ₹4.9 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Navaneethakrishnan L1 | Thangaraj S L2 |
|---|---|---|---|---|---|
| 1.001.Providing Cement Concrete Road,Drainage,Small Culvert Arrangement at Manthiramoorthykovil Front side in Keelambur Village in Keelambur Panchayat. | |||||
| 2.00 | Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete. | 2.16 | Cum | 197 ₹425.52 | 198 ₹427.68 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 23.81 | Cum | 5,353 ₹1.3 L | 5,354 ₹1.3 L |
| 4.00 | Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete. | 27.69 | Sqm | 547 ₹15,146.43 | 548 ₹15,174.12 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 5.66 | Cum | 6,104 ₹34,548.64 | 6,105 ₹34,554.30 |
| 6.00 | Collection and supply of Red gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 21.63 | Cum | 367 ₹7,938.21 | 368 ₹7,959.84 |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including top Finish using Trowel Machine with necessary Genset Arrangements including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 29.46 | Cum | 7,362 ₹2.2 L | 7,363 ₹2.2 L |
| 8.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm. | 20.61 | Sqm | 282 ₹5,812.02 | 283 ₹5,832.63 |
| 9.00 | Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm | 1.35 | Sqm | 422 ₹569.70 | 423 ₹571.05 |
| 10.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 47.09 | Kg | 91 ₹4,285.19 | 92 ₹4,332.28 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
5 Mar 2026, 4:00 pmClosed
Block Development officer,B.Pt
Block Development officer,B.Pt,Kadayam
Providing Cement Concrete Road,Drainage,Small Culvert Arrangement at Manthiramoorthykovil Front side in Keelambur Village in Keelambur Panchayat.
2026_RDTN_667720_1
BDKDM/347/2025-A2
Open Tender
Civil Works
90 days
Kadayam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
21 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
1.Providing Cement Concrete Road,Drainage,Small Culvert Arrangement at Manthiramoorthykovil Front side in Keelambur Village in Keelambur Panchayat.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Collection and supply of Red gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:2:4 mix using 20mm ISS metal including top Finish using Trowel Machine with necessary Genset Arrangements including all cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_802155.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.91 MB
BOQ_802155.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid