Tender Value
₹53.1 L
EMD Value
₹4.7 L
Closing Date
15 Jun 2026, 3:00 pmClosed
Nagar Ayukt, Nagar Nigam Shahjahanpur
Nagar Nigam Shahjahanpur
Hathithan me abid cement wale se subbe ke makan tak va hathithan masjid ke pas se hote huye shakir ke makan tak nali evan C.C. sadak nirman kary.
2026_DOLBU_1157414_1
767-nv-nnspn-26...03-06-26...2
Open Tender
Civil Works
Percentage
90 days
shahjahanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,784
A/C No-50200017927485 IFSC-HDFC0000869, HDFC Bank
₹4.7 L
3 Jul 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old c.c/ interlocking tiles flooring including stacking of materials as directed by the Engineer in charge with in a distance of 60 metre.(sor no=20.16 3) | - | sqm | 75 | - |
| 2 | Dismantling of old brick work with cement mortar and including stacking of materials as directed by the Engineer in charge with in a distance of 60 metre.(sor no=17.01-692) | 0.4 | cum | 660 | ₹263.93 |
| 3 | Disposal of excavation surplus earth material and cartage up to 5 km only.(231a 5) | 0.44 | cum | 183.5 | ₹80.74 |
| 4 | P.C.C 1:6:12 cement fine sand and Brick Ballast in foundation and under floors including supply of all materials labour tools and plants etc. required for proper completion of the work..(sor no=273) | - | cum | 3,705 | - |
| 5 | M-150 Brick work in one cement and four corse sand (1:4 ) in foundation and plinth including supply of all materials labour, T&Petc. Reqd. for proper completion of the work.(sor no=6.03=305a) | 0.6 | cum | 5,580 | ₹3,348 |
| 6 | 12 mm thick cement plaster with cement and core sand mortar 1:5 over brick work thickness not less than ` cm including supply of all materials labour Tools & Plants etc. reqd. fpr proper completion of the work.(sor no=584new) | - | sqm | 217 | - |
| 7 | PCC in 1:2:4 with 2 cm gauge app. Stone grits including of all work complete.(sor no=279) | - | cum | 8,298 | - |
| 8 | Supply and laying with consolidation 22.4-53 mm gauge stone Ballast and screening material by hand rammer including supply of all materials labour tools and plants etc. required for proper completion of the work..(anly) | - | cum | 3,965 | - |
| 9 | Cement concrete with 4 cm gauge approved stone ballast approved coarse sand and cement in the proparation of (1:2:4) pavement (C.C.ROAD) .including supply of all materials labour and T&P etc required for proper completion of all work complete. (sor no=279 (i) | - | cum | 8,303 | - |
| 10 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in slabs. (sor no=284) | - | cum | 8,920 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.21 MB
BOQ_2168806.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .