Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -26.57% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.1 L+₹17,914.40 (6.22%)Admitted-Fee/PreQual/Technical/Finance | -22.00% | ₹3.1 L+₹17,914.40 (6.22%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.4 L+₹50,113.28 (17.4%)Admitted-Fee/PreQual/Technical/Finance | -13.79% | ₹3.4 L+₹50,113.28 (17.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.5 L+₹63,386.40 (22.0%)Admitted-Fee/PreQual/Technical/Finance | -10.40% | ₹3.5 L+₹63,386.40 (22.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.9 L+₹98,470.40 (34.2%)Admitted-Fee/PreQual/Technical/Finance | -1.45% | ₹3.9 L+₹98,470.40 (34.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
EMD Value
₹11,760
Closing Date
27 Aug 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRUCTION OF BOUNDARY WALL AT PRIMARY SCHOOL BAGPORA BATINGOO 1260
2026_RDPR_320196_20
e- NIT No. 62 OF REWK/PRI/2026-27 Dated 08-08-2026e- NIT No. 62 OF REWK/PRI/2026-27 Dated 08-08-2026
Open Tender
Civil Works
Percentage
45 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
EX ENGINEER REW KULGAM
₹11,760
8 Sept 2026
8 Aug 2026
29 Aug 2026
8 Aug 2026
27 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mannual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed in all kinds of soil. | 7.65 | cum | - | - |
| 2 | P/L dry stone solling hand packed including all carriages/ HL and including 20% plums. | 5.42 | cum | - | - |
| 3 | Demolishing concrete manually/mechanically (1:3:6)mix including disposal complete job. | 4.14 | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 11.55 | cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.35 | cum | 1 | ₹4.35 |
| 6 | Reinforcement for RCC work including cutting bending binding and placing in position all complete. | 332 | kgs | 1 | ₹331.67 |
| 7 | Form work of ordinary timber planks for in situ concrete work. | 53.65 | sqm | - | - |
| 8 | Structural steel work in built up sections, and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete. | 1,158 | kgs | 1 | ₹1,156.84 |
| 9 | P/F GI chain link fencing 50*50mm mesh size and 4mm dia.wire with all fixtures. | 74.35 | sqm | 1 | ₹74.28 |
| 10 | Painting with synthetic enamel paint of approved brand mannufacture two or more coats. | 74.35 | sqm | 1 | ₹74.28 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1063296.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .