Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.9 LAccepted-AOC | ₹71.9 L | L1 | Accepted-AOC Lower Amount |
| 2 | L2₹73.5 LRejected-AOC | ₹73.5 L | L2 | Rejected-AOC Higher Amount |
| Sl No | Description | Qty | Unit | SHANMUGAM C L2 | S. CHANDRAN L1 |
|---|---|---|---|---|---|
| 1.00Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without demaging the vari vargams, racking out the joints, cleaning the surface with water, includinng all working in heights, hire charges for special tooks, brushes complete superficial area including all folds - 100sft. | |||||
| 1.01 | ( A) Kalkaram) | 2,265 | Sqft | 12 ₹27,180 | 10 ₹22,650 |
| 1.02 | Vimanams / Gopurams upto 50' 0" height (exculuding Kalkaram) | 820 | Sqft | 21 ₹17,220 | 20 ₹16,400 |
| 2.00Brick masonry lime mortar 1:1.5 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works. | |||||
| 2.01 | ( A) Kalkaram) | 760 | Cft | 300 ₹2.3 L | 300 ₹2.3 L |
| 3.00Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1:5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1:5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram. | |||||
| 3.01 | ( A) Kalkaram) | 2,443 | Sqft | 300 ₹7.3 L | 285 ₹7.0 L |
| 3.02 | Vimanams / Gopurams upto 50' 0" height (exculuding Kalkaram) | 820 | Sqft | 360 ₹3.0 L | 355 ₹2.9 L |
| 4.00 | Dismantling the existing flooring Chipping of concrete & roughening the surface etc.. | 71.5 | Sqm | 45 ₹3,217.50 | 40 ₹2,860 |
| 5.00 | Supplying and filling in foundation in basement with filling sand in layars of 150 mm thickness well watered rammed and consolidated complyiny with relevant std specification including cost of supplying filling sand. | 54.05 | Cum | 2,100 ₹1.1 L | 2,080 ₹1.1 L |
Tender Value
₹72.1 L
EMD Value
₹46,100
Closing Date
26 Sept 2025, 3:00 pmClosed
THE EXECUTIVE OFFICER GRII
EXECUTIVE OFFICER HRCE Arulmigu Brammapureshwarar Temple, Nedar Village, Thanjavur Taluk District.
Repair and Restoration Of Swamy Sannathi, Ambal Sannathi and Mahamandapam and new construction of compound wall and Madapalli.
2025_HRCE_602789_1
142/2025 Dt 03.09.2025
Open Tender
Civil Works - Others
Arulmigu Brammapureshwarar Temple, Nedar Village
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹46,100
11 Jan 2026
11 Sept 2025
26 Sept 2025
11 Sept 2025
26 Sept 2025
11 Sept 2025
Amount
Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without demaging the vari vargams, racking out the joints, cleaning the surface with water, includinng all working in heights, hire charges for special tooks, brushes complete superficial area including all folds - 100sft.
( A) Kalkaram)
Vimanams / Gopurams upto 50' 0" height (exculuding Kalkaram)
Brick masonry lime mortar 1:1.5 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.
( A) Kalkaram)
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1:5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1:5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram.
( A) Kalkaram)
Vimanams / Gopurams upto 50' 0" height (exculuding Kalkaram)
Dismantling the existing flooring Chipping of concrete & roughening the surface etc..
Supplying and filling in foundation in basement with filling sand in layars of 150 mm thickness well watered rammed and consolidated complyiny with relevant std specification including cost of supplying filling sand.
Supplying & Paving Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and Pointing With Lime Mortor1:1.5 etc complete.
Dome brick work in Lime Mortor1:5 using country brick of size 'country bricks of size 83/4" x 41/4" x 23/4"including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Clean removal of lime plaster from walls and racking out joints Clean removal of lime plaster from walls etc..
Plastering with Lime Mortor1:1.5 (One Lime and one and half sand ) ,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Plastering with Lime Mortor 1:1.5 (One Lime and one and half sand ) 20mm tk including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Scaffolding charges for Vimanams and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood plank for working, inspection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work
Vimanam /Gopuram upto 15'0" Height
Painting with multicolour (Panchavarnam) good exterior emulsion paint complete for the Vinamans/Gopurams, inculding cost and conveyence of all materials, lobour charges inculdinf Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings
Vimanam /Gopuram upto 15'0" Height
Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2
Providing New sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor 1:1.5 finishing the same with Lime Mortor 1:1.5 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder)
Sudhai size 1'0" upto 2'6"
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Supplying and fixing in postition of Teak wood frames incliding cost and conveyance of materials and matireals as per standard specifications.
A).For Frame
B) For Planks
Best varnish two coats for wood works etc, complete complying with standard specifications.
Earth work excavation for foundation with all leads and lifts in all soils and sub-soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of 150mm thick well consolidated, depositing the surplus earth in places shown and levelling the site with all leads and lifts etc. complete in all respects..
Cement concrete 1:5:10 (One cement, five crushed stone sand and ten aggregate) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed, watered etc., complete complying with standard specification
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
For RCC works in foundation and basement such as pile cap, grid beam, plinth beam, raft beam, & slab, column base & footing, stair case steps etc.
Centering for beams and slabs for up to 3m ht.
Curved surface ( Doom )
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).
Foundation & Basement
Ground floor
Supplying, fabricating and placing in position Mild steel or Ribbed tor steel in all size for all RCC works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specifications. (The contratctor will have to make his own arrangements for the supply of MS plain rod / RTS rod and binding wire)
Brick work in lime Mortor 1:2 using country brick of size 83/4"x41/4"x23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications.
Finishing the top of roof with one course of machine pressed tiles 20cmx 20cmx20mm of approved quality laid in ;LM 1:3,12mm thick mixed with water proofing compound 2% by weight of cement used etc, complete with standard specifications.
sub total
SHANMUGAM C (BID ID -1472543)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_720564.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid