| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-AOC | ₹10.0 L | 1 | Accepted-AOC Bid Accepted |
| 2 | 2₹10.1 LRejected-Finance | ₹10.1 L | 2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | P.Krishnakumar L2 | P KANNUCHAMY L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 178 | M3 | 190 ₹33,820 | 184 ₹32,752 |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 21 | M3 | 5,200 ₹1.1 L | 5,199 ₹1.1 L |
| 3.00 | Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification
For side wall | 483 | M2 | 470 ₹2.3 L | 459 ₹2.2 L |
| 3.01 | for culvert | 12 | M2 | 1,050 ₹12,600 | 1,023 ₹12,276 |
| 4.00 | Plain Cement Concrete 1:2:4 mix (One Cement, Two Fine Aggregate and Four Coarse Aggregate) Using 20mm ISS HBG Metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 85 | M3 | 6,590 ₹5.6 L | 6,570 ₹5.6 L |
| 5.00 | Granolithic Floor finishing with Cement Concrete 1:2:4 (One part of cement, two parts of sand and four parts of ISS HBG metal) mix using 10mm to 12mm ISS size HBG metal to 25mm thick including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:39-F | 73 | M2 | 175 ₹12,775 | 160 ₹11,680 |
| 6.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard . | 3 | M3 | 8,205 ₹24,615 | 8,195 ₹24,585 |
| 7.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 300 | kg | 93 ₹27,900 | 89 ₹26,700 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
17 Oct 2025, 3:00 pmClosed
EO
Odaipatti Town Panchayat
Construction Strom Water Drainage in Ward.2 Sukkangalpatti in Odaipatti Town Panchayat
2025_DTP_614543_1
185-1/2025
Open Tender
Civil Works
180 days
Odaipatti Town Panchayat
asper tender notice
3 documents required · 3 mandatory
₹0
₹12,000
18 May 2026
15 Oct 2025
17 Oct 2025
15 Oct 2025
17 Oct 2025
15 Oct 2025
15 Oct 2025 - 17 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tendernotice_2.pdf
PDF • 0.32 MB
BOQ_734228.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid