Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.6 LAdmitted-Finance | -16.38% | ₹19.6 L | L1 | Admitted-Finance |
| 2 | L2₹23.1 L+₹3.5 L (17.8%)Admitted-Finance | -1.50% | ₹23.1 L+₹3.5 L (17.8%) | L2 | Admitted-Finance |
| 3 | L3₹23.2 L+₹3.6 L (18.4%)Admitted-Finance | -1.00% | ₹23.2 L+₹3.6 L (18.4%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 534 ASHIRVAD MAL GODAM ROAD SULTANPUR 228001 | SULTANPUR | SULTANPUR | UTTAR PRADESH | 228001 | - | - | - | Rejected-Technical as per docs |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical as per docs |
Tender Value
₹23.5 L
EMD Value
₹46,920
Closing Date
12 May 2026, 1:00 pmClosed
project officer
PRAYAGRAJ
Construction of CC road and drain work Babban Tiwari house to VC house in Gangotri Nagar Naini
2026_SUDA_1142096_9
Nirman_NN_9
Open Tender
Civil Works
Fixed-rate
45 days
prayagraj
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,768
as per docs
₹46,920
3 Jun 2026
27 Apr 2026
12 May 2026
27 Apr 2026
12 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work as in Excavation in foundation in ordinary soil 1.50metre at lift and 30Mtr lead including all complete the work | 1 | cum | 160 | ₹159.98 |
| 2 | Plain Cement concrete 1:6:12 with cement fine sand 40mm gauge Brick ballast including all complete the work | - | cum | - | - |
| 3 | Earth work in cutting or filling in ordinary 1.50metre lift and 30mt. including all complete the work | 1 | cum | 1 | ₹1 |
| 4 | M-150 class Brick work in foundation with 12q cement fine sand mortar including all complete the work | - | cum | - | - |
| 5 | 12mm Thick cement plastar with 1:4 cement fine Sand mortar including all complete the work | - | Sqm | - | - |
| 6 | Construction of grandor subbase 905mt. by providing graded material existing in mix by place mathed including all complete the work | 1 | cum | 1 | ₹1 |
| 7 | Laying off 100 Micron Polythene under the foundationn & floor ffor anti saltpeter treatment including ffor properr completionn of the work | - | Sqm | 1 | - |
| 8 | C.C. work in slab in 1:1.5:3 with cement, coarse sand and 20mm gauge stone grit including all complete the work | - | cum | - | - |
| 9 | R.C.C. work with Cement approved coarse sand and 2cm. Guage in 1:1.5:3 with cement, coarse sand and 20mm gauge stone grit including all complete the work | - | cum | - | - |
| 11 | Mild Steel(plain/tor) for slab including cutting bending etc.All complete the work | 1 | Qtl | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.15 MB
BOQ_2134173.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .