| Sl No | Description | Qty | Unit | Pankaj Trading Company L1 | M/S NEW MAA KALYANI TRADERS L3 | Riya Electricals L2 |
|---|---|---|---|---|---|---|
| 1.00Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. | ||||||
| 1.01 | PCC Pole 8.5 mtr long | 94 | Nos | 500 ₹47,000 Lowest | 500 ₹47,000 Lowest | 650 ₹61,100 |
| 1.02 | 33 KV VCB 800A, 750 MVA | 1 | Nos | 2,000 ₹2,000 | 2,000 ₹2,000 | 150 ₹150 Lowest |
| 1.03 | 33 KV CT, 400/200/1-1-1A | 3 | Nos | 1,000 ₹3,000 | 1,000 ₹3,000 | 150 ₹450 Lowest |
| 1.04 | 33 KV Control Panel for double transformer | 1 | Nos | 500 ₹500 | 500 ₹500 | 125 ₹125 Lowest |
| 1.05 | 33 KV Line Isolator, 800 A | 1 | Nos | 500 ₹500 | 500 ₹500 | 125 ₹125 Lowest |
| 1.06 | 33 KV Bus Isolator, 800 A | 1 | Nos | 500 ₹500 | 500 ₹500 | 125 ₹125 Lowest |
| 1.07 | 33 KV Post Isolator | 6 | Nos | 500 ₹3,000 | 500 ₹3,000 | 150 ₹900 Lowest |
| 1.08 | 33 KV lightning arrestors | 1 | Nos | 500 ₹500 | 500 ₹500 | 70 ₹70 Lowest |
| 1.09 | Control Cable 4x2.5 sq mm | 200 | Mtr | 8 ₹1,600 Lowest | 8 ₹1,600 Lowest | 25 ₹5,000 |
Tender Value
₹8.5 L
EMD Value
₹8,530
Closing Date
13 Sept 2025, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle-Unnao
QUANTUM OF WORKS INVOLVED IN PROVIDING ADDITIONAL POLE TO REDUCE LONG SPAN LENGTH OF BETWEEN POLES OF 11 KV LINE AND CONSTRUCTION OF NEW LT LINE AT DIFF. SITES AND PROVIDING NEW 33 KV VCB WITH STRUCTURE AND ISOLATOR FOR TAPPING NEW 33 KV LINE KABBA
2025_MVVNL_1070984_1
85/E.D.C./Unnao/2025-26
Open Tender
Electrical Works
Fixed-rate
180 days
Unnao
as per tender document
2 documents required · 2 mandatory
₹1,180
A/C-No.3355002101008374,IFSCCode- PUNB0335500
₹8,530
26 Sept 2025
3 Sept 2025
15 Sept 2025
3 Sept 2025
13 Sept 2025
3 Sept 2025
Amount
Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking.
PCC Pole 8.5 mtr long
33 KV VCB 800A, 750 MVA
33 KV CT, 400/200/1-1-1A
33 KV Control Panel for double transformer
33 KV Line Isolator, 800 A
33 KV Bus Isolator, 800 A
33 KV Post Isolator
33 KV lightning arrestors
Control Cable 4x2.5 sq mm
Control Cable 2x2.5 sq mm
11 KV XLPE Cable 3x120 sq mm
O/D Cable Jointing Kit 11 KV 3x185 sq mm
Other loose line materials with including conductor, Single and double Pole accessories, complete stay & earthing, insulator, diff. Channel & Angle, distribution box, x-arm, etc. from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking.
A.C.S.R. Rabbit Conductor
ACSR Panthar Conductor
Three Phase A.B. Cable of diff. size
Dismantling of existing old O/H 11 KV Line including rolling back its conductor/G.I. wire from work site to dump site.
Erection of PCC Single Pole (11 KV) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site.
Supply & Fixing of following materials for above job-
11 KV F-Clamp with N&B
Cross Arm Holding Clamps
Erection of PCC Pole (LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site.
Supply & Fixing of following materials for above job-
Suspension Clamp for ABC
Dead End Clamp for ABC
L.T. Clamp with Nuts & Bolts
Eye Hook
Piercing Connector
Making T-off arrangement including fabrication & fitting of accessories.
Supply & Fixing of following materials for above job-
Holding clamp for T-off Channel with N&B
Grouting of ST/PCC Pole as per RESPO Norms with grouting materials.
Earthing as per RESPO Norms.
Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials.
Supply & Fixing of following materials for above job-
Stay Clamp with N&B
Stay Insulator
Laying stringing and sagging of O/H 11 KV Line Three Phase by Conductor including all associated work with joint/jumpers and binding of insulator as required.
Supply & Fixing of following materials for above job-
P.G. Clamp
Laying of underground 11 KV XLPE Cable of size 3x120 sq mm by conventional method with digging, bricks & sand as per RESPO Norms with complete all work as required. (All the required materials for above job shall be provided by contractor except 11 KV XLPE Cable size 3x120 sq mm)
Fixing of O/D Jointing Kit for 11 KV XLPE Cable size 3x120 sq mm with complete all work as required.
Commissioning of 11 KV XLPE Cable of size 3x120 sq mm including jumpering with the system. (All the required materials for above job shall be provided by contractor)
11 KV Cable Hosting including jumpering etc. complete work with help of G.I. Pipe as per RESPO Norms (G.I. Pipe and other required material shall be provided by the contractor)
Laying stringing and sagging of O/H Three Phase L.T. Line by ABC of diff. size including all associated work with joint/jumpers and binding of insulator as required.
Fixing of 3-Ph. Distribution Box with clamp, N&B with complete all work as required. (All the required materials as DB Box Clamps, Piercing Connectors, Nut & bolts etc for this job shall be provided by the contractor except Distribution Box)
Supply & Fixing of following materials for above job-
Clamp for Distribution Box with nut & bolt
Piercing Connector
Chopping of Tree Branches falling on the line
Re-sagging of existing loose conductor of 11 KV Line.
Repositioning of existing tilted PCC/ST pole with grouting
Safe Carriage of old and jarjar conductor from dump site to ESC Unnao with loading, unloading and proper stacking.
Construction of plinth & foundation for 33 KV VCB and 33 KV CT as per RESPO norms. (All the material will be arranged by the contractor)
Installation & Commissioning of 33 KV VCB as per RESPO Norms
Installation & Commissioning of 33 KV C.T. as per RESPO Norms
Erection of Structure for 33 KV Line and Bus Isolator as per RESPO norms. (All the material will be arranged by the contractor)
Installation & Commissioning of 33 KV Line Isolator as per RESPO Norms
Installation & Commissioning of 33 KV Bus Isolator as per RESPO Norms
Erection of Structure for 33 KV Post Insulator as per RESPO norms. (All the material will be arranged by the contractor)
Installation & Commissioning of 33 KV Post Insulator as per RESPO Norms
Erection of Structure for 33 KV lightning arrestors as per RESPO norms. (All the material will be arranged by the contractor)
Installation & Commissioning of 33 KV lightning arrestors as per RESPO Norms
Laying stringing and sagging of ACSR Panthar Conductor including all associated work with joint/jumpers and binding of insulator as required.
Laying of new control cable of size 4x2.5 sq mm as per RESPO Norms with complete all work as required. (Only Control Cable Provided By Department)
Laying of new control cable of size 2x2.5 sq mm as per RESPO Norms with complete all work as required. (Only Control Cable Provided By Department)
Riya Electricals (BID ID -5531233)
M/S NEW MAA KALYANI TRADERS (BID ID -5532485)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .