| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC accept |
| 2 | L2₹4.2 L+₹2,373.37 (0.56%)Rejected-AOC | ₹4.2 L+₹2,373.37 (0.56%) | L2 | Rejected-AOC Reeject |
| 3 | L3₹4.3 L+₹9,901.40 (2.35%)Rejected-AOC | ₹4.3 L+₹9,901.40 (2.35%) | L3 | Rejected-AOC Reeject |
| 4 | L4₹4.3 L+₹11,565.37 (2.75%)Rejected-AOC | ₹4.3 L+₹11,565.37 (2.75%) | L4 | Rejected-AOC Reeject |
| 5 | L5₹4.6 L+₹34,653.72 (8.24%)Rejected-AOC | ₹4.6 L+₹34,653.72 (8.24%) | L5 | Rejected-AOC Reeject |
| Sl No | Description | Qty | Unit | V BAGYAM L5 | ADHAV BUILDERSS L4 | RK INFRASTRUCURES L2 | MJ Infrastructures L1 | S.Sudhagar L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | 1. Dismantling the old damaged existing Cement concrete etc. complete as per direction of departmental officers etc. completed. (CBE DATA 2025-26 P-5) | 33 | m3 | 400.95 ₹13,231.35 Lowest | 1,500 ₹49,500 | 490 ₹16,170 | 486.41 ₹16,051.61 | 497.86 ₹16,429.3 |
| 2.00 | 2. Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum (CBE DATA 2025-26 P-3) | 47 | m3 | 80 ₹3,760 Lowest | 100 ₹4,700 | 94 ₹4,418 | 93.5 ₹4,394.5 | 95.7 ₹4,497.9 |
| 3.00 | 3. Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (CBE DATA 2025-26 P-4) | 47 | m3 | 5,000 ₹2,35,000 Lowest | 5,000 ₹2,35,000 Lowest | 5,097 ₹2,39,559 | 5,068.06 ₹2,38,198.68 | 5,187.31 ₹2,43,803.35 |
| 4.00 | 4.Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification (CBE DATA 2025-26 P-13) | 14 | m2 | 300 ₹4,200 Lowest | 300 ₹4,200 Lowest | 410 ₹5,740 | 407.15 ₹5,700.1 | 416.73 ₹5,834.22 |
| 5.00 | 5. Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification (CBE DATA 2025-26 P-5) | 24 | m3 | 7,900 ₹1,89,600 | 5,500 ₹1,32,000 Lowest | 6,213 ₹1,49,112 | 6,176.81 ₹1,48,243.54 | 6,322.15 ₹1,51,731.62 |
| 6.00 | 6. Conveying excavated earth from the site to 15 km distance from the city limit including loading, unloading and transportation etc. complete. (CBE DATA 2025-26 P-3) | 93 | m3 | 104 ₹9,672 | 75 ₹6,975 Lowest | 88 ₹8,184 | 88.4 ₹8,221.2 | 90.48 ₹8,414.64 |
| 7.00Add :- GST @ 18% | ||||||||
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
29 Jun 2026, 3:00 pmClosed
Asst Commissioner
East Zone Singanallur-641005
Restoration of cc flooring at mariaaman kovil street 1 2 3 in ward no 50 East zone.
2026_MAWS_681272_12
E3/2026/EZ
Open Tender
Civil Works - Roads
Item Rate
East Zone Singanallur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
Yes
17 Sept 2026
17 Jun 2026
30 Jun 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Dismantling the old damaged existing Cement concrete etc. complete as per direction of departmental officers etc. completed. (CBE DATA 2025-26 P-5) | 33 | m3 | - | - |
| 2 | 2. Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum (CBE DATA 2025-26 P-3) | 47 | m3 | - | - |
| 3 | 3. Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (CBE DATA 2025-26 P-4) | 47 | m3 | - | - |
| 4 | 4.Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification (CBE DATA 2025-26 P-13) | 14 | m2 | - | - |
| 5 | 5. Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification (CBE DATA 2025-26 P-5) | 24 | m3 | - | - |
| 6 | 6. Conveying excavated earth from the site to 15 km distance from the city limit including loading, unloading and transportation etc. complete. (CBE DATA 2025-26 P-3) | 93 | m3 | - | - |
| 7 | Add :- GST @ 18% | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Roads.pdf
Tender Documents • 0.51 MB
BOQ_818755.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .