| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹100.0 L+₹3.4 L (3.48%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.0 Cr+₹3.4 L (3.51%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.1 Cr+₹10.2 L (10.6%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical not qualified |
| Sl No | Description | Qty | Unit | CENTURY ENGINEERING L2 | LUCKY TRADERS CONTRACTORS AND ENGINEERS L3 | STATURE ENGINEERS AND PROJECT CONSULTANTS PRIVATE L1 | Showkat Ahmad Khan L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Providing of Galvanised Stubs (150x150x20 mm ) 3.65 Mtr Long with Cleats Nuts and Bolts as per Drawing | 1,392 | kg | 105 ₹1,46,160 Lowest | 130 ₹1,80,960 | 120 ₹1,67,040 | 170 ₹2,36,640 |
| 2.00 | Providing of Galvanised Stubs (150x150x12 mm ) 3.57 Mtr Long with Cleats Nuts and Bolts as per Drawing | 5,400 | kg | 105 ₹5,67,000 Lowest | 130 ₹7,02,000 | 120 ₹6,48,000 | 170 ₹9,18,000 |
| 3.00 | Providing of Galvanised Stubs (100x100x8 mm ) 3.45 Mtr Long with Cleats Nuts and Bolts as per Drawing | 227 | KG | 105 ₹23,835 Lowest | 130 ₹29,510 | 125 ₹28,375 | 170 ₹38,590 |
| 4.00 | Tower spotting, pit marking including check of alignment as per profile. | 12 | job | 8,000 ₹96,000 | 10,000 ₹1,20,000 | 2,000 ₹24,000 Lowest | 20,000 ₹2,40,000 |
| 5.00 | Site clearance at tower foundations including removing of vegetation, thorns, shurbs, trees (jungle clearance) | 6,078 | m2 | 15 ₹91,170 | 2 ₹12,156 Lowest | 50 ₹3,03,900 | 20 ₹1,21,560 |
| 6.00 | Carrying out Benching | 6,300 | m3 | - | 250 ₹15,75,000 | 1 ₹6,300 Lowest | - |
| 7.00Earth excavation of foundations including all labour, T&P, all leads & lifts, stockpiling, carriage, backfilling to be done with soft soil only, disposal & dressing of surplus excavated earth and & cost of borrowed good earth (if required) in all types of soil. | |||||||
| 8.00 | Soft Soil 30% | 1,060 | m3 | 700 ₹7,42,000 | 250 ₹2,65,000 Lowest | 250 ₹2,65,000 Lowest | 450 ₹4,77,000 |
| 9.00 | Hard Soil 70% | 2,480 | m3 | 750 ₹18,60,000 | 250 ₹6,20,000 Lowest | 400 ₹9,92,000 | 500 ₹12,40,000 |
| 10.00 | Stub setting using proper template as per approved design including its transportation . | 12 | Set | 10,000 ₹1,20,000 Lowest | 10,000 ₹1,20,000 Lowest | 10,000 ₹1,20,000 Lowest | 18,000 ₹2,16,000 |
Tender Value
₹1.3 Cr
Closing Date
8 Apr 2021, 4:00 pmClosed
Executive Engineer TLMD -7, JKPTCL
Bemina, Srinagar JK
Construction of 12 Nos. Tower Foundations (PS type) of 220kV D/c Zainakote-Alusteng-Mirbazar Trans. Line (Sec-II) at Lethpora in District Pulwama.
2021_PDD_121186_1
e-NIT No. TLMD-7/35 of 2021 Dated 23-03-2021
Open Tender
Civil Works
Lump-sum
60 days
kashmir
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
CD A/C No. 0367010200000182
Exempted
26 Apr 2021
24 Mar 2021
9 Apr 2021
24 Mar 2021
8 Apr 2021
24 Mar 2021
Amount
Providing of Galvanised Stubs (150x150x20 mm ) 3.65 Mtr Long with Cleats Nuts and Bolts as per Drawing
Providing of Galvanised Stubs (150x150x12 mm ) 3.57 Mtr Long with Cleats Nuts and Bolts as per Drawing
Providing of Galvanised Stubs (100x100x8 mm ) 3.45 Mtr Long with Cleats Nuts and Bolts as per Drawing
Tower spotting, pit marking including check of alignment as per profile.
Site clearance at tower foundations including removing of vegetation, thorns, shurbs, trees (jungle clearance)
Carrying out Benching
Earth excavation of foundations including all labour, T&P, all leads & lifts, stockpiling, carriage, backfilling to be done with soft soil only, disposal & dressing of surplus excavated earth and & cost of borrowed good earth (if required) in all types of soil.
Soft Soil 30%
Hard Soil 70%
Stub setting using proper template as per approved design including its transportation .
Providing & laying in position cement concrete PCC M-10 (1 cement :3 coarse sand:6 graded stone aggregate) 40mm nominal size (curshed stone) excluding the cost of centring and shuttering including all carriages (manual and mechanical).
Supply ,Fabrication and Fixing of Steel Reinforcement for RCC work including placing in position and binding as per approved drawing including all carriages (manual and mechanical) to site.
Providing & laying in position R.C.C, M-20; (1 cement:1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering and reinforcement including couping, curing and all carriages (manual and mechanical).
Fixing of Form Work (Centering and shuttering) and removal of the same after completion of work (for Raft and Chimneys) including all carriages (manual and mechanical)
Providing & Fixing of Galvanised Earthing (GI Pipe, Flat strip and Bolts with Nut/washers) of towers as per approved design including cost and carriage of sand, charcoal, salt etc
Dismentalling of two existing B/C tower foundatios (Chimneys only)
CENTURY ENGINEERING
LUCKY TRADERS CONTRACTORS AND ENGINEERS
Showkat Ahmad Khan
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
sbd.pdf
Tender Documents • 0.86 MB
BOQ_233381.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .