Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | L1 | Accepted-AOC AWARD OF CONTRACT IS GIVEN TO THE CONTRACTOR | |
| 2 | L2₹14.8 L+₹29,973.50 (2.06%)Rejected-Finance | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | M/S DIVINE BLESSED ENTERPRISES L2 | M/S SAVERA BUILDCON L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry soil including lift up to 1.5 m & lead up to 30 back filling,watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-charge | 611.95 | Cum | 129 ₹78,941.55 | 127 ₹77,717.65 Lowest |
| 2.00 | Laying C.C. M-15 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 17.92 | Cum | 5,933 ₹1,06,319.36 | 5,812 ₹1,04,151.04 Lowest |
| 3.00 | Supplying and filling boulder 20-40 kg. in apron with cost of all material including all cost of labour,material and T & P etc. complete | 5.13 | Cum | 2,612 ₹13,399.56 | 2,558 ₹13,122.54 Lowest |
| 4.00 | Laying R.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 33.42 | Cum | 6,795 ₹2,27,088.9 | 6,657 ₹2,22,476.94 Lowest |
| 5.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 55.18 | Cum | 7,606 ₹4,19,699.08 | 7,451 ₹4,11,146.18 Lowest |
| 6.00 | Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. complete | 4.22 | M.T | 63,838 ₹2,69,204.85 | 62,535 ₹2,63,710.09 Lowest |
| 7.00 | ordinary centering and shuttering or steel shuttering for C.C. work including all cost of labour,material and T. & P. etc. complete | 82.89 | Sqm | 490 ₹40,616.1 | 480 ₹39,787.2 Lowest |
| 8.00 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 169.77 | Sqm | 806 ₹1,36,834.62 | 789 ₹1,33,948.53 Lowest |
| 9.00 | Supplying and fixing 100 mm dia P.V.C. spout Pipe including cost of all material,labour and T & P etc complete | 1.6 | R.M | 157 ₹251.2 | 154 ₹246.4 Lowest |
| 10.00 | Supplying and fixing marble bench mark plate size 150 X 150 X 25 mm wiyh engraved letters including all cost of labour,material and T & P etc, complete | 1 | No. | 292 ₹292 | 286 ₹286 Lowest |
Tender Value
₹15.2 L
EMD Value
₹1.5 L
Closing Date
6 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
O/O EXECUTIVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION-9 SAMBHAL
CONSTRUCTION OF BHIMPUR MINOR HEAD REGULATOR AT KM 8.000 OF HAIDERPUR DY.
2026_UPIDC_1128923_1
01/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
90 days
HAIDERPUR
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹766
₹1.5 L
SAMBHAL
19 May 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in foundation in dry soil including lift up to 1.5 m & lead up to 30 back filling,watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-charge | |||||
| 2Laying C.C. M-15 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | |||||
| 3Supplying and filling boulder 20-40 kg. in apron with cost of all material including all cost of labour,material and T & P etc. complete | |||||
| 4Laying R.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | |||||
| 5Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | |||||
| 6Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. complete | |||||
| 7ordinary centering and shuttering or steel shuttering for C.C. work including all cost of labour,material and T. & P. etc. complete | |||||
| 8Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | |||||
| 9Supplying and fixing 100 mm dia P.V.C. spout Pipe including cost of all material,labour and T & P etc complete | |||||
| 10Supplying and fixing marble bench mark plate size 150 X 150 X 25 mm wiyh engraved letters including all cost of labour,material and T & P etc, complete | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.83 MB
BOQ_2105690.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .