| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | ₹14.5 L | L1 | Accepted-AOC AWARD OF CONTRACT IS GIVEN TO THE CONTRACTOR |
| 2 | L2₹14.8 LRejected-Finance | ₹14.8 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | M/S DIVINE BLESSED ENTERPRISES L2 | M/S SAVERA BUILDCON L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry soil including lift up to 1.5 m & lead up to 30 back filling,watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-charge | 611.95 | Cum | 129 ₹78,941.55 | 127 ₹77,717.65 |
| 2.00 | Laying C.C. M-15 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 17.92 | Cum | 5,933 ₹1.1 L | 5,812 ₹1.0 L |
| 3.00 | Supplying and filling boulder 20-40 kg. in apron with cost of all material including all cost of labour,material and T & P etc. complete | 5.13 | Cum | 2,612 ₹13,399.56 | 2,558 ₹13,122.54 |
| 4.00 | Laying R.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 33.42 | Cum | 6,795 ₹2.3 L | 6,657 ₹2.2 L |
| 5.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 55.18 | Cum | 7,606 ₹4.2 L | 7,451 ₹4.1 L |
| 6.00 | Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. complete | 4.22 | M.T | 63,838 ₹2.7 L | 62,535 ₹2.6 L |
| 7.00 | ordinary centering and shuttering or steel shuttering for C.C. work including all cost of labour,material and T. & P. etc. complete | 82.89 | Sqm | 490 ₹40,616.10 | 480 ₹39,787.20 |
| 8.00 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 169.77 | Sqm | 806 ₹1.4 L | 789 ₹1.3 L |
| 9.00 | Supplying and fixing 100 mm dia P.V.C. spout Pipe including cost of all material,labour and T & P etc complete | 1.6 | R.M | 157 ₹251.20 | 154 ₹246.40 |
| 10.00 | Supplying and fixing marble bench mark plate size 150 X 150 X 25 mm wiyh engraved letters including all cost of labour,material and T & P etc, complete | 1 | No. | 292 ₹292 | 286 ₹286 |
Tender Value
₹15.2 L
EMD Value
₹1.5 L
Closing Date
6 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
O/O EXECUTIVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION-9 SAMBHAL
CONSTRUCTION OF BHIMPUR MINOR HEAD REGULATOR AT KM 8.000 OF HAIDERPUR DY.
2026_UPIDC_1128923_1
01/EE/2025-26
Open Tender
Civil Works - Canal
90 days
HAIDERPUR
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹766
₹1.5 L
SAMBHAL
19 May 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in foundation in dry soil including lift up to 1.5 m & lead up to 30 back filling,watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-charge | |||||
| 2Laying C.C. M-15 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | |||||
| 3Supplying and filling boulder 20-40 kg. in apron with cost of all material including all cost of labour,material and T & P etc. complete | |||||
| 4Laying R.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | |||||
| 5Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | |||||
| 6Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. complete | |||||
| 7ordinary centering and shuttering or steel shuttering for C.C. work including all cost of labour,material and T. & P. etc. complete | |||||
| 8Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | |||||
| 9Supplying and fixing 100 mm dia P.V.C. spout Pipe including cost of all material,labour and T & P etc complete | |||||
| 10Supplying and fixing marble bench mark plate size 150 X 150 X 25 mm wiyh engraved letters including all cost of labour,material and T & P etc, complete | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.83 MB
BOQ_2105690.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid