Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.5 L+₹51,994.20 (7.50%)Rejected-AOC 245 1A SATIN SEN SARANI KOLKATA 700054 | KOLKATA | KOLKATA | WEST BENGAL | 700054 | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹7,200
Closing Date
1 Mar 2024, 2:00 pmClosed
SE Civil TTPS
Office of the SE Civil TTPS TTN 4
Improvement works to the JT 2E building in the Coal Handling Conveyor System of TTPS by Strengthening the column beam and other allied Civil works in Red Gate North Break Water area VOC Port at ECHS
2024_EB_429127_1
CE SE C TTPS Spec No. 314 23 24
Open Tender
Civil Works - Others
Item Rate
120 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,200
Yes
5 Apr 2024
22 Feb 2024
2 Mar 2024
22 Feb 2024
1 Mar 2024
22 Feb 2024
Providing two legged scaffolding, for works upto 3 mtrs. height using 10 cm dia casuarina props, distance between two rows being 1.25 m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50 m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with C.W planks of 40 mm thick and 1m width etc. complete using coir and nails).
Special ceiling plastering with C.M.1:3, 20 mm thick for RCC works with Nitobond AR mixed in cement mortar at 250ml/bag of cement including cost of all materials, labours, lead, lift, hacking the area, curing, etc. complete.
Clean removal of wornout cement plaster from walls & plastering with C.M 1:5, 12 mm thick including one coat of primer with white cement, cost of all materials, labours, lead, lift, curing, etc. complete.
Supplying & providing RTS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete.
Removing the spalled/ distressed RCC from the existing concrete to average thickness of 75mm disposal of debris with a lead of 1km and roughening the surface thoroughly with reebaklens fosroc acid/equivalent with all lead lift labour etc., complete.
Micro Concrete for RCC column and beams. a. Applying One coat of Nito Zinc/equivalent primer after thorough cleaning of rust in the reinforcement rate including cost of all materials, labour, lead, lift etc., complete as directed by the Engineer at site. b. Providing fabricating and erecting slurry tight from work with plywood shutters with suitable supports, which do not deform due to micro concrete including cost of all materials, labour, lead, lift, etc., complete as directed by the Engineer at site. c. Providing micro concrete using Rendroc RG (or) equivalent as per manufacturer’s specifications this mixed micro concrete should be placed continuously for an average thickness of 75mm including cost of all materials, labour, lead, lift, etc., complete as directed by the Engineer at site. d. Applying One coat of Polymer modified Acrylic Emulsion (Nito bond AR or equivalent) on the finished concrete surfaces as a curing membrane including cost of all materials, labour, lead, lift etc., complete as directed by the Engineer at site.
Supplying and fixing of rain water down fall pipe (4Kg/cm2) using approved quality PVC pipe of160mm dia including cost of specials, all other materials required, labour, lead, lift, etc., complete.
Dismantling the wornout glazed tiles and ceramic tiles in cement mortar in Toilet including cost of labour, lead, lift, etc., complete.
Providing dadooing wall with glazed tiles of approved make first quality printed design and colour of 150 x 150mm with 6mm thick laid in CM 1:2, 10mm thick and pointing with white cement of 0.4 Kg/ Sqm Including cost of materials labour, lead, lift, etc., complete.
Supply and fixing floor tiles of 305 x 305 x 6mm first quality design ceramic tiles of approved colours in CM 1:3, 20mm thick and pointing with white cement 0.4 Kg/Sqm including cost of tiles labour, lead, lift, etc., complete.
Supplying and fixing Indian Water closet of approved quality and colour and size 580x440mm with 'P' or 'S' trap and foot rest including cost of all materials, labours, lead, lift, curing, etc. complete.
Supplying and providing Nito floor Hard top over the existing PCC/RCC concrete surface of 5Kg/Sqm and rubbed smooth with power float over the base concrete including cost of all materials, labour, lead, lift, etc., complete.
Supplying and providing water proof treatment over the existing roof slab with polymeric asphalt membrane sheet (4kg/cm2) constituting 7 layers with thermo fusible HM HDFE film one at top and other of bottom layer of this polymeric mix 1 layer of fibre glass tissue, 2 layers of polymeric mix on the top and bottom of 90 microns HM HDPE film, cracks on roof slab to be filled with cement based filter, laying of PAM sheets over a coating of 90/15 hot blown bitumen with 100mm over lap sealed by LPG flame torch further coated with oxides bitumen 90/15 and finally coated with aluminium coating and also extra attention should be given in roof / drain curve portion as per instruction of site Engineer including cost of all labour,lead,lift,T& P etc. complete.
Providing and fixing in position of new anodized aluminium windows of approved manufacture with aluminium 65x38x2.50 mm as main outer frame and inner frame with section 62x30x1.50 mm for top sides and bottom and shutter frame with section 39x19x1.50 mm for vertical plain inter lock and bottom etc. including all fittings/ fixture confirming torelevant IS to ensure smooth operation and glazed with 5.5 mm plain glass panels as sliding type as per instructions of site Engineer, rubber lining with standard hardware such as special wheel maruthilock 'U' Rubber beading screws, join cleats etc., including cost of all material, lead lift, transporting including the dismantling existing broken glasses and damaged aluminium shutter from the window and devoluting the same to the stores etc., complete.
Providing two coats of snowcem for the old outer walls including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc. complete.
Providing two coats of Acrylic distemper of approved quality, brand & colour for old ceiling & inner wall surfaces including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc. complete.
Painting two coats with ready mixed enamel paint for the old steel surface including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, etc. complete.
Writing of letter painting in the outer wall with two coat of enamel paint for background and writing letter of size 15cm bordering alround including cost of paint, labour, lead, lift, etc., complete.
KRISHNA ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .