Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | ₹3.9 L Quoted ₹3.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.6 LRejected-AOC NO 10 72 10TH STREET JOTHI NAGAR MANALI EXPRESS ROAD THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | TAMIL NADU | 600019 | ₹3.6 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SPK ENTERPRISES L1 | KUMARAN ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for scaffolding, including supporting pipes for arresting the hot primary air duct up stream and down stream of worn-out expansion bellow; cutting and removal of worn out expansion bellow, gougeing, edge preparation, leading, lifiting and erection of new expansion bellow in position through welding and providing cover plate inside the expansion bellow with one side welding, including cutting and removal of the existing cover plate, drawal & devolution of material including the cost of consumables, special welding electrodes and hire charges for T&P’s. | 9 | Nos | 16,000 ₹1.4 L | 17,000 ₹1.5 L |
| 2.00 | Charges for welding of eroded and worn out portion of duct joints and welded joints with M.S. welding electrodes. | 120 | Mtr | 270 ₹32,400 | 285 ₹34,200 |
| 3.00 | Charges for reconditioning by patch up the eroded/ weaken duct portion above 5m in Hot and cold air modular duct. This work involves opening of all manhole doors for inspection, fabrication of new MS plate as per required size, leading, lifting, fixing and complete welding and closing of all manhole doors as per the direction of site incharge including cost of consumables & Hire charges T&P’s. (Required MS material will be supplied by TANGEDCO) | 3.6 | MT | 48,000 ₹1.7 L | 48,650 ₹1.8 L |
Tender Value
Refer Docs
EMD Value
₹8,700
Closing Date
19 Dec 2024, 2:00 pmClosed
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II MI Circle MPM Unit I Mills 1C 1G 1H Replacement of damaged hot air duct expansion
2024_EB_510234_1
CE NCTPS II SE M I O M 206 2024 25
Open Tender
Miscellaneous Works
35 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,700
Yes
9 Jan 2026
12 Dec 2024
20 Dec 2024
12 Dec 2024
19 Dec 2024
12 Dec 2024
Amount
Charges for scaffolding, including supporting pipes for arresting the hot primary air duct up stream and down stream of worn-out expansion bellow; cutting and removal of worn out expansion bellow, gougeing, edge preparation, leading, lifiting and erection of new expansion bellow in position through welding and providing cover plate inside the expansion bellow with one side welding, including cutting and removal of the existing cover plate, drawal & devolution of material including the cost of consumables, special welding electrodes and hire charges for T&P’s.
Charges for welding of eroded and worn out portion of duct joints and welded joints with M.S. welding electrodes.
Charges for reconditioning by patch up the eroded/ weaken duct portion above 5m in Hot and cold air modular duct. This work involves opening of all manhole doors for inspection, fabrication of new MS plate as per required size, leading, lifting, fixing and complete welding and closing of all manhole doors as per the direction of site incharge including cost of consumables & Hire charges T&P’s. (Required MS material will be supplied by TANGEDCO)
KUMARAN ENGINEERING WORKS (BID ID -1212775)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid