| 1 | L1₹37.8 LAccepted-AOC 2 RC ENTERPRISES NEAR AGRASEN BHAWAN BHATAPARA CHHATTISGARH LINK ROAD BALODA BAZAR RAIPUR CHHATTISGARH 493118 UDYAM CG 18 0005898 | BALODA BAZAR | CHHATTISGARH | 493118 | ₹37.8 L Quoted ₹38.1 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹38.5 LRejected-AOC 1001 63 SHALIMAR GARDEN ISMAILGANJ NEAR INDIRA NAGAR SECTOR 08 CROSSING LUCKNOW 226016 | LUCKNOW | UTTAR PRADESH | 226016 | ₹38.5 L | L2 | Rejected-AOC L1 Being Accepted |
| 3 | L3₹38.7 LRejected-AOC NO 51 TOWN HALL 3RD STREET ARAKKONAM TAMIL NADU 631 001 | ARAKKONAM | RANIPET | TAMIL NADU | 631001 | ₹38.7 L | L3 | Rejected-AOC L1 Being Accepted |
| 4 | L4₹39.6 LRejected-AOC D 3 7TH BLOCK JAIN GREEN ACRES DHARGA ROAD ZAMIN PALLAVARAM CHENNAI 600043 | CHENNAI | CHENNAI | TAMIL NADU | 600043 | ₹39.6 L | L4 | Rejected-AOC L1 Being Accepted |
| 5 | L5₹69.5 LRejected-AOC | ₹69.5 L | L5 | Rejected-AOC L1 Being Accepted |
| Sl No | Description | Qty | Unit | rc enterprises L1 | C SRINIVASAN L3 | SRI VENKATESWARA ENTERPRISES L5 | lakshmibuilders L4 | RK ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' | ||||||||
| 2.00 | Taking down the defective reciprocating open type compressor of capacity 50TR / Make : blue Star Model : JS 43F-N50B. from the central type Air conditioning plant by disconnecting suction and discharge valves after pumping down the system and other controls . Dismantling the compressor for overhauling, servicing, cleaning all the internal parts and Crank shaft, reconditioning, replacing of following parts main bearings (front 02 Nos and back 01 No), connecting rods 04 Nos, Piston pins 04 Nos, Suction read, discharge read, suction spring, discharge spring, piston rings, gasket sets, Thrust washer etc, Re- assembling the compressor in all respect , refixing the same in its original position & re connecting all disconnected lines including Pressure testing as per the OEM recommendation / Specification & commissioning for proper function of all instruments like pressure gauge , pressure switches , solenoid valve, expansion valve etc. Replace if required. as specified and as directed. (SM/MES No. 825/0032/09) | 1 | Each Job | 96,000 ₹96,000 | 76,000 ₹76,000 | 74,000 ₹74,000 | 95,000 ₹95,000 | 77,000 ₹77,000 |
| 2.01Note for item No 2.00:- (i) Unserviceable parts / accessories required other than listed above to be replaced will be measured and paid for under relevent Items as supply only. (ii). Unserviceable parts /accessories listed here-in-after will be repalced only after the approval of Engineer-in Charge . (iii) Labour charges for removing unserviceable parts / accesories and replacement with new one shall be deemed to be included in the unit rate. (iv) Any minor spares / parts /accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (v) Leak test, gas & oil charging shall be measured under relevent items., (vi) Renewal of control wiring in the system/panel,deemed to be included in quoted rate, copper cable will be measured under relevent Items. | ||||||||
| 3.00 | Taking down the defective 50 HP motor startor and the burned copper old winding from reciprocating open type compressor of the central type Air conditioning plant of capacity 50 TR and rewinding with copper double winding as per the original winding Re- assembling the motor startor and compressor in all respect , refixing the same in its original position & re connecting all disconneted lines as specified and as directed by Engr-in-Charge
Note :-
(i).Unserviceable parts / accessories required to be replaced will be measured and paid for under relevent Items as supply only. (SM/MES No. 825/0032/09) | 1 | Each Job | 1,85,000 ₹1.9 L | 1,35,000 ₹1.4 L | 13,60,000 ₹13.6 L | 1,25,000 ₹1.3 L | 1,38,000 ₹1.4 L |
| 4.00M & L tor carry out the leak test for finding out normal gas leakage or during any repair carried out in AC plant of following capacity cental AC plant by charging the dry nitrogen gas & hold up to 24 hrs and rectifying the leakage if any by bracing / welding / replacing the 'Ö' ring etc and Vacuumising complete system with double stage vaccum pump to pull minimum 500 micron vaccum pressure and charging the refrigerant Gas (R22 / R407C) upto desired pressure all as specified & directed. by Engineer-in-charge. Note :- (a) Once the Gas is charged, the system should hold the pressure for minimum three months. If any gas leak from the system, the contractor has to recharge the gas upto required level free of cost, No extra cost on this account shall be claimed. (b) compressor oil and refrigerant gas shall be measured and paid separately under relevant items as supply only. | ||||||||
| 4.01 | Central type AC plant of capacity 50TR (Reciprocating Compressor 01 x 50 TR) | 3 | Each Job | 15,000 ₹45,000 | 14,500 ₹43,500 | 15,000 ₹45,000 | 16,500 ₹49,500 | 16,000 ₹48,000 |
| 4.02 | Central type AC plant of capacity 12.5TR (Scroll Type compressor 04 x 12.5TR) | 9 | Each Job | 12,000 ₹1.1 L | 12,500 ₹1.1 L | 1,35,000 ₹12.2 L | 14,500 ₹1.3 L | 12,000 ₹1.1 L |
| 4.03 | Central type AC plant of capacity of 12.5 TR (Scroll type compressor 01 x 12.5 TR) | 6 | Each Job | 8,000 ₹48,000 | 8,200 ₹49,200 | 8,500 ₹51,000 | 9,500 ₹57,000 | 8,000 ₹48,000 |
| 5.00 | M&L for Repair /Servicing of oil pump by removing the pump from respective compressor of capacity 50 TR, replacing the worn out / defective parts like bearing, shaft, impeller, gaskets, valves, gears etc assembling and refixing back to compressor, testing for satisfactory fuction complete all as specified and directed | 1 | Each Job | 8,500 ₹8,500 | 8,400 ₹8,400 | 8,500 ₹8,500 | 8,300 ₹8,300 | 8,000 ₹8,000 |
| 6.00M&L for Descaling the shell and tube condenser by circulating descaling chemical with water (ph value of circulating water should be 01) through cooling tower re-circulating pump set up to 2 to 3 hours and open the end cover of condenser and manually cleaning the inner tubes with nylon brush removal of complete scale and flushing with fresh water. Reconnecting the condenser end cover by replacing rubber gasket, bolts, nuts and including cleaning of cooling tower,make up water tank etc as required commissioning in all respect for the following:- (Note: (i) Descaling shall be done minimum once in every 3 months and will be measured accordigly. (ii) During descaling any damage to copper coil which leads leakage of gas, contractor shall be resposible for rectification to the damage and gas to be filled after leak test without any extra cost (iii) Descaling of one AC Plant unit include total Number of condensers / chillers in the mentioned capacity AC Plant | ||||||||
Updated dates
Tender Value
₹35.1 L
EMD Value
₹70,160
Closing Date
26 Dec 2025, 6:00 pmClosed
CWE(Navy) Chennai
Commander Works Engineers Navy Military Engineer Services Fort St George Rajaji Salai Chennai600 009
87721 REPAIR AND MAINT TO CENTRAL AC PLANT IN CERTAIN AREAS AT INS RAJALI ARAKKONAM UNDER GE (M) ARAKKONAM
2025_MES_742013_1
CWE/NAVY/ARK/87721/E8 OF 2025-26
Open Tender
Miscellaneous Works
180 days
ARAKKONAM
AS PER NIT AND TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (M) Arakkonam
₹70,160
Yes
16 Feb 2026
28 Nov 2025
29 Dec 2025
28 Nov 2025
26 Dec 2025
12 Dec 2025
28 Nov 2025 - 5 Dec 2025
Amount
SCHEDULE 'A'
Taking down the defective reciprocating open type compressor of capacity 50TR / Make : blue Star Model : JS 43F-N50B. from the central type Air conditioning plant by disconnecting suction and discharge valves after pumping down the system and other controls . Dismantling the compressor for overhauling, servicing, cleaning all the internal parts and Crank shaft, reconditioning, replacing of following parts main bearings (front 02 Nos and back 01 No), connecting rods 04 Nos, Piston pins 04 Nos, Suction read, discharge read, suction spring, discharge spring, piston rings, gasket sets, Thrust washer etc, Re- assembling the compressor in all respect , refixing the same in its original position & re connecting all disconnected lines including Pressure testing as per the OEM recommendation / Specification & commissioning for proper function of all instruments like pressure gauge , pressure switches , solenoid valve, expansion valve etc. Replace if required. as specified and as directed. (SM/MES No. 825/0032/09)
Taking down the defective 50 HP motor startor and the burned copper old winding from reciprocating open type compressor of the central type Air conditioning plant of capacity 50 TR and rewinding with copper double winding as per the original winding Re- assembling the motor startor and compressor in all respect , refixing the same in its original position & re connecting all disconneted lines as specified and as directed by Engr-in-Charge Note :- (i).Unserviceable parts / accessories required to be replaced will be measured and paid for under relevent Items as supply only. (SM/MES No. 825/0032/09)
M & L tor carry out the leak test for finding out normal gas leakage or during any repair carried out in AC plant of following capacity cental AC plant by charging the dry nitrogen gas & hold up to 24 hrs and rectifying the leakage if any by bracing / welding / replacing the 'Ö' ring etc and Vacuumising complete system with double stage vaccum pump to pull minimum 500 micron vaccum pressure and charging the refrigerant Gas (R22 / R407C) upto desired pressure all as specified & directed. by Engineer-in-charge. Note :- (a) Once the Gas is charged, the system should hold the pressure for minimum three months. If any gas leak from the system, the contractor has to recharge the gas upto required level free of cost, No extra cost on this account shall be claimed. (b) compressor oil and refrigerant gas shall be measured and paid separately under relevant items as supply only.
Central type AC plant of capacity 50TR (Reciprocating Compressor 01 x 50 TR)
Central type AC plant of capacity 12.5TR (Scroll Type compressor 04 x 12.5TR)
Central type AC plant of capacity of 12.5 TR (Scroll type compressor 01 x 12.5 TR)
M&L for Repair /Servicing of oil pump by removing the pump from respective compressor of capacity 50 TR, replacing the worn out / defective parts like bearing, shaft, impeller, gaskets, valves, gears etc assembling and refixing back to compressor, testing for satisfactory fuction complete all as specified and directed
M&L for Descaling the shell and tube condenser by circulating descaling chemical with water (ph value of circulating water should be 01) through cooling tower re-circulating pump set up to 2 to 3 hours and open the end cover of condenser and manually cleaning the inner tubes with nylon brush removal of complete scale and flushing with fresh water. Reconnecting the condenser end cover by replacing rubber gasket, bolts, nuts and including cleaning of cooling tower,make up water tank etc as required commissioning in all respect for the following:- (Note: (i) Descaling shall be done minimum once in every 3 months and will be measured accordigly. (ii) During descaling any damage to copper coil which leads leakage of gas, contractor shall be resposible for rectification to the damage and gas to be filled after leak test without any extra cost (iii) Descaling of one AC Plant unit include total Number of condensers / chillers in the mentioned capacity AC Plant
Descaling the Condenser of Central type AC plant of capacity 50 TR (Reciprocating Compressor 01 x 50 TR)
Descaling the Condenser of Central type AC plant of capacity 50 TR (Scroll type compressor 04 X 12.5TR)
All as per item No. 6 above but chiller of following capacity.
Descaling the chiller of Central type AC plant of capacity 50TR (Reciprocating Compressor 01 x 50 TR)
Descaling the chiller of Central type AC plant of capacity 50 TR (Scroll type compressor 04 X 12.5TR)
Descaling the chiller of Central type AC plant of capacity 12.5 TR (Scroll type compressor 01 X 12.5TR)
M&L for Dismantling unserviceable Butterfly valves any type supply and fix new valve of following bore dia , butterfly type including replacement of bolts , nuts , washers and rubber gaskets all as directed.
Butterfly valve of size 150 mm dia
Butterfly valve of size 100 mm dia
Butterfly valve of size 80 mm dia
Butterfly valve of size 50 mm dia
S & F new NRV butterfly type of following size with replacement of bolts , nuts , washers and rubber gaskets including dismantling of old unserviceable NRV of following sizes all as directed.
NRV of size 150 mm dia
NRV of size 100 mm dia
NRV of size 80 mm dia
NRV of size 50 mm dia
Taking down existing corroded MS pipe through gas cutting from condenser water / chiller water recirculating pipe line and S & F including welding in its original position MS pipe medium grade of following dia including all special joints all as directed
MS Pipe of size 150 mm dia
MS Pipe of size 100 mm dia
MS Pipe of size 80 mm dia.
MS Pipe of size 50 mm dia.
M&L for Servicing and cleaning of water strainer/ NRV of size up to 150 mm with chemical for removing all dust particles, scales and unwanted materials all as directed
S & F MS flange including Bolts ,Nuts, gasket etc and taking down old corroded of following sizes all as directed
MS Flange of size 150 mm dia
MS Flange of size 100 mm dia
MS Flange of size 80mm dia.
MS Flange of size 50 mm dia.
M&L for Dismantling unserviceable water strainer any type, supply and fix new Water strainer of following size, both flanged "U" type and suitable for existing location butterfly type , including replacement of bolts , nuts , washers and rubber gaskets all as directed
Water strainer of size 100 mm dia.
Water strainer of size 80 mm dia.
Water strainer of size 50 mm dia.
M&L for dismantling torn "V" belts any type / model , supply and fix new "V" Belt of following size.
V- Belt of size C-127
V- Belt of size C-122
V- Belt of size A-82
V- Belt of size A-57
V- Belt of size B--93
V- Belt of size B--74
M&L for Taking down the Centrifugal pump set of following capacity ( condenser & Chilled water re-circulating pump set) for servicing /overhauling by replacing Bush & bearings, gland packing, studs, gasket etc including machining work to shaft reassembling the pump set, painted with two coats of synthetic enamel paint including erecting testing and commissioning complete all as specified and directed.
Servicing /overhauling Centrifugal pump set of capacity 10 to 12 HP, 3 phase, 415 volts.
Servicing /overhauling Centrifugal pump set of capacity 7.5 HP, 3 phase, 415 volts.
Servicing /overhauling Centrifugal pump set of capacity 3 to 5 HP, 3 phase, 415 volts.
M & L for taking down the unserviceable motor and dismantling including taking out damaged/burnt out winding from motor and rewinding with new super enamelled copper winding of following capacity all as directed.
Rewinding motor of capacity 3 to 5 HP.
Rewinding motor of capacity 7.5 HP.
Rewinding motor of capacity 10 to 12 HP.
M&L for maintenance and repairs / attending the complaint to the compressor unit of Central type AC plant of following capacity including fault finding and rectification including its calibration all as specified and directed. Note :- (i) Repair/ servicing work to be carried out only by service person of OEM or his authorised agency. (ii) After rectifying the complaint; same type of complaint within 1 week for the same unit shall not be paid (iii) Servicing / replacing of PCB / replacement of any other parts will be paid seperately under relavent items.
Attending the complaint to the compressor unit of Central AC plant of capacity 50 TR (Reciprocating compressor 01 X 50TR)
Attending the complaint to the compressor unit of Central AC plant of capacity 50 TR(Scroll type compressor 04 X 12.5TR)
Attending the complaint to the compressor unit of Central AC plant of capacity 12.5 TR (Scroll type compressor 01 X 12.5TR)
M&L for taking down unserviceable electrical contactors / relays /Starter / disconnectors/ Timer / fuse unit , any type /capacity / model from electrical control panels including supply and fix of following specifications all as specified and as directed :-
Contactor set for 3 Pole contactor AC3 with 1NO+1NC, 110 Amps.
Contactor Set for 3 pole contactor AC3 with 1NO+1NC ,70 Amps.
Contactor Set for 3 pole contactor AC3 with 1NO+1NC 63 Amps.
Contactor Set for 3 pole contactor AC3 with 1NO+1NC, 32 Amps.
Contactor Set for 3 pole contactor AC3 with 1NO+1NC, 16 Amps
Over load relay (direct mounting) of Range 13.2-20Amps
Star Delta Starter of capacity 10 to 12 HP
Star Delta Starter of capacity 7.5 HP
DOL Delta Starter of capacity 3 to 5 HP
Switch fuse unit of capacity 125 A 4 pole with HRC fuses.
Taking down existing unserviceable MCCB from the panel, Supply and fix new MCCB, adjustable thermal magnetic type of following capacity/specification ,415V, 50 Hz, with extended terminal & spreader link all as directed
MCCB 4 pole, 25 KA 40 Amp.
MCCB 4 pole, 25 KA 63 Amp.
MCCB 4 pole, 25 KA 125 Amp.
MCCB 4 pole, 35 KA, 250 Amp
MCCB 4 pole, 35 KA, 400 Amp
M&L for dismantling and removing the unserviceable thrust bearings from the Air handling Units of the central type A/C plants and repalcing with new Thrust bearing of same type / model , assembling back , reinstalling, connecting and testing complete all as specified and directed.
M&L for Servicing of following Air Handling Units ( AHU's ) with humidification pumps of central type A/C by cleaning air filters , fire dampers , blowers , spray nozzles , condensate water tray , greasing of blower bearing / blower motor , tightening all bolts, nuts and testing for proper functioning all as specified and directed. Note :- AHU servicing shall be done once in every 2 months
Servicing of AHU with chiller water cooling coil with electric motor 12 HP and 15 HP
Servicing of AHU with chiller water cooling coil with electric motor 25 HP
Servicing of AHU with chiller water cooling coil with electric motor 10 HP
Supply & Replace the MS lov - joy (Male & Female) coupling of following size complete as per sample for condenser recirculating pump & chilled water pump all as directed.
MS lov - joy (Male & Female) coupling of size up to 100 mm
MS lov - joy (Male & Female) coupling of size up to 110 mm to 150 mm
Supply & Replace the Star rubber disc for lov - joy of any size up to 150 mm coupling as per sample for condenser recirculating pump & chilled water pump all as directed.
Supply & Replace the MS-Rubber (Male & Female) coupling of following size complete as per sample for condenser recirculating pump & chilled water pump all as directed.
MS-Rubber love-joy (Male & Female) coupling of size up to 100 mm
MS-Rubber love-joy (Male & Female) coupling of size 110 mm to 150 mm
Supply and replace Pilot control valve same as existing make all as directed
Supply and fix Expansion valve for following capacity plant including removing of old Expansion valve all as directed.
Expansion valve for 50 TR Compressor of central AC plant.
Expansion valve for 12.5 TR scroll Compressor unit of central AC plant.
Supply only following spares for compressor for AC Plant all as directed.
Supply only gasket set of compressor 50 TR AC Plant
Supply only shaft seal assembly of compressor 50 TR Plant
Supply only Compressor oil (grade as per manufacturer's recommendation)
Supply only following Refrigerant gas for charging
Refrigerant gas R-22.
Refrigerant gas R-407C.
Supply & Replace single phase preventer 415 V,3Ph all as directed.
Supply & Replace HP/LP pressure switch with all connected accessories all as directed.
Supply & Replace Oil pressure cutout switch / Water pressure cutout switch with all connected accessories all as directed.
Supply & Replace Water flow switch with all connected accessories all as directed.
Supply & Replace of Nitrile rubber insulation with Aluminium cladding on Chiller pipe line of any size including removal of old damaged insulation all as directed.
Supply & replace Temperature sensor with wiring kit for water entering & leaving from condenser / chiller A/C plant all as directed.
Supply and replacement of new Fan Blade full assembly from the existing cooling tower capacity up to 160 TR of the central type AC plant all as specified and as directed
Supply and replacement of new Hub for fixing Fan Blade assembly from the existing cooling tower capacity up to 160 TR of the central type AC plant all as specified and as directed
Supply and replacement of Sprinkler assembly from the existing cooling tower capacity up to 160 TR of the central type AC plant all as specified and as directed
Supply and replacement of PVC Fills from the existing cooling tower capacity up to 160 TR of the central type AC plant all as specified and as directed
Supply and replacement of PVC Branch Pipes & Drift Eliminators full set from the existing cooling tower capacity up to 160 TR of the central type AC plant all as specified and as directed
Supply and replacement of PVC Mesh for cooling tower complete all as specified and directed.
M&L for Servicing and cleaning of following cooling towers of central type A/ C including taking down and cleaning of fills with water and refixing in original position and one coat of painting same as old colour and testing for proper functioning all as specified and as directed. Note :- (i) Servicing of cooling tower to be carried out twice in the entire contract period and Each job will be measured and paid separately. (ii) Spares required for replacement if any shall be measured and paid separately under relevant items as supply and fixing.
Servicing of Cooling tower of Central AC Plant of capacity 50 TR (Reciprocating compressor 01 x 50TR)
Servicing of Cooling tower of Central AC Plant of capacity 50 TR (Scroll type compressor 04 x12.5TR)
M&L for taking down the burntout / defective Scroll type compressor 12.5 TR from unit and replace the factory made new compressor, testing and commissioning complete all as specified and directed. Note :- (i) Leak test, Vacuuming & Refrigerant gas shall be measured separately under relavant items. (ii) compressor under 1 year warranty is contractor's responsiblility. (iii) Compressor company test report shall be submitted by contractor.
Supply & Replace Air release valve made by brass suitable for up to 12.5 TR scroll type compressor circuit of central AC plant including taking down old U/s valve all as directed.
Supply & Replace Filter Drier/Strainer suitable for Central AC for the following capacity including taking down old unserviceable one all as directed.
Filter Drier / Strainer for 50 TR compressor of central AC Plant
Filter Drier / Strainer for 12.5 TR Scroll compressor unit of central AC Plant
Supply & Replace compound gauge made of stainless steel body all as directed.
Supply and replace Pressure gauge/Temperature guage made of stainless steel bodyall as directed.
M & L for Repair/ Service of Printed circuit board (PCB) in AC control board panel with all connected wires/ parts including removing, refixing testing satisfactory fuction of following capacity AC plant all as directed.
Central AC Plant of capacity 50 TR (Reciprocating compressor 01 x 50TR)
Central AC Plant of capacity 50 TR (Scroll type compressor 04 x12.5TR)
Central AC Plant of capacity 12.5 TR(Scroll type compressor 01 x12.5TR)
Supply & Replace Printed circuit board (PCB) with display and all connected items as per the existing type for the following capacity AC plant including full wiring, testing and commissioning all as directed.
Central AC Plant of capacity 50 TR (Reciprocating compressor 01 x 50TR)
Central AC Plant of capacity 50 TR (Scroll type compressor 04 x12.5TR)
Central AC Plant of capacity 12.5 TR(Scroll type compressor 01 x12.5TR)
Material & Labour for MS Pipe of any cleaning with wire brush and painting with one coat of metal primer and two coats of oil paint complete all as specified and directed.
M&L for Replacement of old GI duct with new air ducting factory made out of commercial grade GI sheet zinc coating 120 grade (22 Gauge), IS:277 and factory fabricated as per SMACNA-1995 standards and IS-655 all as directed.
M&L for Replacement of old insulation of duct by Nitrile rubber insulation of thickness 19 mm on GI duct including fixing insulation on GI duct all as directed.
M&L for fabrication MS Hand rails, supporting structure, etc fabricated from structural steel sections including nuts, bolts, washers,welding, bending cold or hot,drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint including embeding in concrete and screwing etc all as specified and as directed.
M&L for taking down the condenser water recirculating pumpset along with MS frame from the existing foundation and fabricate new MS frame of same size including welding and fixing and incl connecting inlet & Outlet , connections etc and necessary civil work for smooth funtioning
RK ENTERPRISES (BID ID -3504332)
C SRINIVASAN (BID ID -3505509)
lakshmibuilders (BID ID -3507496)
SRI VENKATESWARA ENTERPRISES (BID ID -3502412)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
87721GENERALPAGES.pdf
Tender Documents • 0.64 MB
87721PS.pdf
Additional Documents • 0.30 MB
BOQ_830900.xls
BOQ • 0.79 MB
Download all tender documents and submit your bid