| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 CrAccepted-AOC | ₹8.6 Cr | L1 | Accepted-AOC BOND SIGNED |
| 2 | L2₹8.8 Cr+₹16.4 L (1.90%)Rejected-Finance 12 10 LOHIYA MARG DISTT PRAYAGRAJ U P | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹8.8 Cr+₹16.4 L (1.90%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.3 Cr+₹70.1 L (8.16%)Rejected-Finance | ₹9.3 Cr+₹70.1 L (8.16%) | L3 | Rejected-Finance L3 |
Tender Value
₹9.8 Cr
EMD Value
₹19.5 L
Closing Date
12 Mar 2021, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Strengthening of Fatehpur Bahuwa Hinauta Road SH 170 Fatehpur city portion ch 0.00 to 4.700 in distt Fatehpur
2021_CEALD_564259_1
705/95C/etendering/P.F.C/2021 Dt 15.02.2021
Open Tender
Civil Works
Item Rate
365 days
fatehpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹19.5 L
Yes
Pratapgarh Circle, PWD, Pratapgarh
24 May 2021
5 Mar 2021
12 Mar 2021
5 Mar 2021
12 Mar 2021
5 Mar 2021
9 Mar 2021
Construction of embankment with ordinary soil obtained from borrowpit with all lifts and lead up to 5 Km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.[In Bogi action Area]
Providing and Laying of Sand by providing, laying, spreading and compacting Local sand in excavated area of bogi action and compacting with power roller etc as per MORT&H Specification No.404.3.2
Construction of granular sub-base by providing coarse graded material Grade-I, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.[WMM]
Providing, laying, spreading and compacting graded stone aggregate to Stablized wet mix macadam specification including premixing the Material with water at OMC. cement 1.0% by wt , and 3.5% emulsion by wt in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. complete as per clause 406 (In Over lay )
Providing and applying Tack coat with bitumen Pressure distributor at the rate of 0.30kg per sqm with Bitumen VG-10 on the prepared granular /bituminous surface cleaned with mechanical broom befor DBM &BC.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder V.G. 40 @ 4.00 .per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. [DBM Grade -1]
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder V.G. 40 @ 4.50 .per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. [DBM Grade -2]
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects.
Construction of Ptari with ordinary soil obtained from road side with all lifts and lead up to 5 km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.[
Providing and laying 40 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 430kg per cum {M-40] with RMC , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.[Excavated earth shall be used in filling of gap between Road and drain as per requirement.] For Drain
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete M-25 Grade in Open Foundation complete as per Drawing and Technical Specifications.
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Brick masonry work in 1:4 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 900 mm dia
Bansal Highway Infratech Pvt Ltd
M/S Tripathi Construction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .